[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-512420-105":59,"doc-detail-512420-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","construction-of-cez-multipurpose-building-cezitb-2026-09-012-first-edition-may-2025","CONSTRUCTION OF CEZ MULTIPURPOSE BUILDING - (CEZITB 2026-09-012) - First Edition - May 2025","","Philippine Bidding Documents (PBD) for procuring an infrastructure works project through competitive bidding procedures are provided as a mandatory model for government procurement. The documents define objectives, scope, expected outputs, bidder eligibility, contract duration, and winning bidder obligations. Provisions are organized across Instructions to Bidders, Bid Data Sheet, General Conditions, Special Conditions, Specifications, Drawings, and Bill of Quantities, with guidance notes excluded from final issue except selected forms.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/construction-of-cez-multipurpose-building-cezitb-2026-09-012-first-edition-may-2025/512420/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/construction-of-cez-multipurpose-building-cezitb-2026-09-012-first-edition-may-2025/512420.png","ImageObject",300,407,{"name":92,"@type":93},"RuangKosong","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-07","2026-10-06",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",13,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What is the purpose of the Philippine Bidding Documents (PBD) in this package?","Question",{"text":113,"@type":114},"The PBD serves as a model set of bidding documents for procurement of infrastructure works and establishes mandatory procedures, provisions, and guidance for the bidding process.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"How are the bidding document sections organized for different procurement needs?",{"text":118,"@type":114},"Unchanged provisions are grouped in Instructions to Bidders (Section II) and General Conditions of Contract (Section IV), while project-specific data is placed in Bid Data Sheet (Section III), Special Conditions of Contract (Section V), and technical parts like Specifications, Drawings, and Bill of Quantities.",{"name":120,"@type":111,"acceptedAnswer":121},"Which parts of the document are intended to be excluded from the final bidding package?",{"text":122,"@type":114},"The preface and instructional notes/footnotes included in various sections are not part of the final document text, except for selected information such as notes introducing Section IX Philippine Bidding Documents Related Forms and related guidance within that section.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},512420,1791364221,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":145,"read_time":146,"preview_page_count":147,"preview_urls":148},962090883219,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","|  |  |  |  |  |\n| --- | --- | --- | --- | --- |\n|  |  | PHILIPPINE BIDDING DOCUMENTS\u003Cbr>Government of the Republic of the Philippines\u003Cbr>\u003Cbr>CONSTRUCTION OF CEZ MULTIPURPOSE BUILDING\u003Cbr>(CEZITB 2026-09-012)\u003Cbr>First Edition\u003Cbr>May 2025 |  |  |\n|  |  |  |  |  |\n\nPreface  \nThese Philippine Bidding Documents (PBD) for the procurement of Infrastructure Projects (hereinafter referred to also as the “Works”) through [Competitive Bidding, Limited  \n1  \nSource Bidding, or Competitive Dialogue ] have been prepared by the Government of the Philippines (GoP) for use by all branches, agencies, departments, bureaus, offices, or instrumentalities of the Government, including government-owned and/or -controlled corporations (GOCC), government financial institutions (GFI), state universities and colleges (SUC), local government units (LGU), and autonomous regional government. The proceduresand practices presented in this document have been developed through broad experience, and are for mandatory2 use in projects that are financed in whole or in part by the GoP or any foreign government/foreign or international financing institution in accordance with the provisions of the Implementing Rules and Regulations (IRR) of Republic Act No. 12009 (RANo. 12009) .  \nThis PBD is intended as a model for admeasurements (unit prices or unit rates in a bill of quantities) types of contract, which are the most common in Works contracting.  \nThe Bidding Documents shall clearly and adequately define, among others: (a) the objectives, scope, and expected outputs and/or results of the proposed contract; (b) the eligibility requirements of Bidders; (c) the expected contract duration; and (d) the obligations, duties, and/or functions of the winning bidder.  \nIn order to simplify the preparation of the Bidding Documents for each procurement, the PBD groups the provisions that are intended to be used unchanged in Section II. Instructions to Bidders (ITB) and in Section IV. General Conditions of Contract (GCC) . Data and provisions specific to each procurement and contract should be included in Section III. Bid Data Sheet (BDS); Section V. Special Conditions of Contract (SCC); Section VI. Specifications; Section VII. Drawings; and Section VIII. Bill of Quantities. The forms to be used are provided in Section IX. Philippine Bidding Documents Related Forms.  \nPrudence must be exercised to check the relevance of the provisions of the PBD against the requirements of the specific Works to be procured. In addition, each Section is prepared with notes intended only as information for the Procuring Entity or the person drafting the Bidding Documents. They shall not be included in the final documents, except for the notes introducing Section IX. Philippine Bidding Documents Related Forms, where the information is useful for the Bidder. The following general directions should be observed when using the documents:  \na) All the documents listed in the Table of Contents are normally required for the procurement of Infrastructure Projects. However, they should be adapted as necessary to the circumstances of the particular Project.  \nb) Specific details, such as the “name of the Procuring Entity” and “address for proposal submission,” should be furnished in the BDS and SCC. The final documents should contain neither blank spaces nor options.  \n1 For Second Stage of Competitive Dialogue under Section 29.4.2 of IRR of RA No. 12009.  \n2 Unless the Treaty or International or Executive Agreement expressly provides use of foreign government/foreign or international financing institution procurement guidelines.  \nc) This Preface and the footnotes, or notes in italics included in the Invitation to Bid, BDS, SCC, Specifications, Drawings, and Bill of Quantities are not part of the text of the final document, although they contain instructions that the Procuring Entity should strictly follow. The Bidding Documents should not contain footnotes except Section IX. Philippine Bidding Documents ","cbCaiq4Qjz2ejA1n","https://ap.wps.com/l/cbCaiq4Qjz2ejA1n","pdf",1364183,115,"English","# Glossary of Acronyms, Terms, and Abbreviations\n# Definition of Terms\n# Section I. Invitation to Bid\n# Section II. Instructions to Bidders\n## A. General\n## B. Contents of Bidding Documents\n## C. Preparation of Bids\n## D. Submission and Opening of Bids","[{\"question\":\"What is the purpose of the Philippine Bidding Documents (PBD) in this package?\",\"answer\":\"The PBD serves as a model set of bidding documents for procurement of infrastructure works and establishes mandatory procedures, provisions, and guidance for the bidding process.\"},{\"question\":\"How are the bidding document sections organized for different procurement needs?\",\"answer\":\"Unchanged provisions are grouped in Instructions to Bidders (Section II) and General Conditions of Contract (Section IV), while project-specific data is placed in Bid Data Sheet (Section III), Special Conditions of Contract (Section V), and technical parts like Specifications, Drawings, and Bill of Quantities.\"},{\"question\":\"Which parts of the document are intended to be excluded from the final bidding package?\",\"answer\":\"The preface and instructional notes/footnotes included in various sections are not part of the final document text, except for selected information such as notes introducing Section IX Philippine Bidding Documents Related Forms and related guidance within that section.\"}]","CONSTRUCTION OF CEZ MULTIPURPOSE BUILDING - (CEZITB 2026-09-012) - First Edition - May 2025 | PDF",1791270526,290,12,[149,153,157,161,165,169,173,177,181,185,189,194],{"page_no":8,"url":150,"width":151,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/c0a44452f6c8d2092a1b40adb1bf52e5.webp",983,1389,{"page_no":14,"url":154,"width":155,"height":156},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1ae34a5be3eef65b1c50852700630e4f.webp",982,1388,{"page_no":81,"url":158,"width":159,"height":160},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/f7aa327dc89d84c11c49b03bc639e4d6.webp",981,1386,{"page_no":19,"url":162,"width":163,"height":164},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d38eb74579064ceb6619bcae513ab2bf.webp",980,1385,{"page_no":24,"url":166,"width":167,"height":168},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/160da9065a8fcfda66317323103c6ec5.webp",979,1384,{"page_no":29,"url":170,"width":171,"height":172},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/e19f215277ea96eaae5f41e5c4ff7da9.webp",978,1382,{"page_no":34,"url":174,"width":175,"height":176},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/067380f98fa542d636bf1110c187c207.webp",977,1381,{"page_no":39,"url":178,"width":179,"height":180},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/63d6cb248cb536096fc9b1cd74da2506.webp",976,1379,{"page_no":44,"url":182,"width":183,"height":184},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/94c44d72263d6a0720378b786fd3bbaf.webp",975,1378,{"page_no":52,"url":186,"width":187,"height":188},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/67738f1735c49960d795a02e4518338e.webp",974,1376,{"page_no":190,"url":191,"width":192,"height":193},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/35a63308bdc03518acffa9246f5a7eff.webp",973,1375,{"page_no":147,"url":195,"width":196,"height":197},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/c10440c5717b12f4f65cfb8cdbc42859.webp",972,1374]