[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662668-105":59,"doc-detail-662668-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","construction-entrances-oregon-standard-drawings-rd1000","Construction Entrances - Oregon Standard Drawings - RD1000","","This technical document provides detailed engineering standards and specifications for the construction of site entrances, designated as Type 1 and Type 2. The guide outlines necessary design parameters, including minimum entrance radii for commercial and residential applications, requirements for subgrade geotextiles, and criteria for diversion ridges and sediment settling basins based on site conditions. It includes a table defining minimum entrance lengths relative to the area of exposed soil to ensure proper sediment control and site stabilization. These specifications are intended to be utilized in accordance with accepted engineering principles, emphasizing compliance with Oregon Standard Specifications to manage environmental impact and site safety during construction activities.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":57,"@type":76,"position":81},"https://docshare.wps.com/document/general/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/construction-entrances-oregon-standard-drawings-rd1000/662668/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/construction-entrances-oregon-standard-drawings-rd1000/662668.png","ImageObject",300,407,{"name":92,"@type":93},"WPS_1786070896","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the primary difference between Type 1 and Type 2 construction entrances?","Question",{"text":112,"@type":113},"Type 1 is a simple entrance without additional drainage features, whereas Type 2 includes a diversion ridge and a sediment settling basin to manage runoff and sediment collection.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When is a diversion ridge required for a construction entrance?",{"text":117,"@type":113},"A diversion ridge is required at the construction entrance when the entrance grade exceeds 2%.",{"name":119,"@type":110,"acceptedAnswer":120},"How is the required length of a construction entrance determined?",{"text":121,"@type":113},"The minimum length is determined by the total area of exposed soil at the site, as specified in the provided construction entrance table, ranging from 20 feet for small areas to 100 feet for larger sites.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662668,1793221496,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":56,"category_name":57,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":14},549768072016,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","20-JAN-2021  \n# CONSTRUCTION ENTRANCE-TYPE 1\n\nNOT TO SCALENOT TO SCALEDiversion ridge required whereconstruction entrance grade exceeds 2%  \nRD1000.dgn  \n# CONSTRUCTION ENTRANCE-TYPE 2\n\nSubgrade geotextileSECTION A-ANOT TO SCALESECTION B-BNOT TO SCALE  \nSandbags or straw balesSediment settling basin  \nConstruction entranceWooden curb rampSECTION C-CNOT TO SCALEWOODEN CURB RAMP SECTION D-D  \nNOT TO SCALE  \n# NOTES:\n\n1.The Type 1 entrance is a simple entrance without a diversionridge or settling basin.  \n2.The wooden ramp may be used on either Type 1 or Type 2entrances in situations where there is curb and the curb isnot removed for the construction entrance.  \n\n| The selection and use of this  \u003Cbr>Standard Drawing,while  \u003Cbr>designed in accordance with  \u003Cbr>generally accepted engineering  \u003Cbr>principles and practices,is the  \u003Cbr>sole responsibility of the user  \u003Cbr>and should not be used without  \u003Cbr>first consulting a Registered  \u003Cbr>Professional Engineer.   | All materials shall be in accordance with  \u003Cbr>the current Oregon Standard Specifications.   |  |  |  |\n| --- | --- | --- | --- | --- |\n|  | OREGON STANDARD DRAWINGS  \u003Cbr>CONSTRUCTION ENTRANCES  \u003Cbr>2024   |  |  |  |\n|  | DATE   | REVISION DESCRIPTION   |  |  |\n|  | 01-2021   | REMOVED CALC BOOK NUMBERS   |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  | Bookcio.__NA___   |  | BSARE_20-JAN-2021_   | RD1000   |\n\n\n| CONSTRUCTION ENTRANCE TABLE  \u003Cbr>MINIMUM LENGTH   |  |\n| --- | --- |\n| Length (FT)   | Area Of Exposed Soil (Acre)   |\n| 20   | 0.25   |\n| 50   | 0.25\u003CA\u003C1.0   |\n| 100   | A>1.0   |","cbCailgoVPEepapY","https://ap.wps.com/l/cbCailgoVPEepapY","pdf",575697,"English","# Construction Entrance - Type 1\n# Construction Entrance - Type 2\n## Diversion Ridge Requirements\n## Sediment Settling Basin Details\n# Construction Entrance Dimensions","[{\"question\":\"What is the primary difference between Type 1 and Type 2 construction entrances?\",\"answer\":\"Type 1 is a simple entrance without additional drainage features, whereas Type 2 includes a diversion ridge and a sediment settling basin to manage runoff and sediment collection.\"},{\"question\":\"When is a diversion ridge required for a construction entrance?\",\"answer\":\"A diversion ridge is required at the construction entrance when the entrance grade exceeds 2%.\"},{\"question\":\"How is the required length of a construction entrance determined?\",\"answer\":\"The minimum length is determined by the total area of exposed soil at the site, as specified in the provided construction entrance table, ranging from 20 feet for small areas to 100 feet for larger sites.\"}]","Construction Entrances - Oregon Standard Drawings - RD1000 | PDF"]