[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649802-105":59,"doc-detail-649802-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","construction-drawings","Construction-Drawings","","Construction drawings detailing multiple building envelope and foundation build-up sections. Includes strip foundation components and specified floor construction layers such as screed, rigid insulation, radon barrier, concrete slab, hardcore, mesh reinforcement, and reinforcing bars. Provides cavity wall construction build-ups with blockwork, rigid insulation, internal plaster, DPC, and weak concrete cavity fill. Also covers suspended timber floor construction, concrete floor construction, window head and cill section through details, and traditional cut roof, verge, eaves, and flat roof junction details with insulation, vapor barrier, and glazing/board elements.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/construction-drawings/649802/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/construction-drawings/649802.png","ImageObject",300,407,{"name":92,"@type":93},"Blitz","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24",true,{"@type":101,"interactionType":102,"userInteractionCount":8},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What layers are included in the floor construction build-up?","Question",{"text":111,"@type":112},"The drawings list a sequence including powerfloated screed, foil-backed rigid insulation, radon barrier, sand blinding, concrete slab, hardcore in compacted layers, earth, and mesh reinforcing, followed by reinforcement bars and footpath/cover elements.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What components make up the cavity wall construction section?",{"text":116,"@type":112},"The cavity wall build-up specifies blockwork layers on both sides, rigid insulation between, external rendering and internal plastering, along with DPC and weak concrete cavity fill elements.",{"name":118,"@type":109,"acceptedAnswer":119},"Which roof and junction details are shown?",{"text":120,"@type":112},"The document includes traditional cut roof details, verge and flat roof eaves details, and the junction of flat roof with rising wall/parapet, including insulation, vapor barrier, and framing/board elements.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},649802,1792878521,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},24464137899374,"https://us-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","STRIP FOUNDATION1415   16SCALE I:I017  \nF.F.L.2  \nF.G.L.  \n3I4126  \n5  \n350  \nI75MM POWERFLOATED SCREED2   10OMM FOIL BACKED RIGID INSULATION3 RADON BARRIER4 SAND BLINDING5   150MM CONCRETE SLAB  \n6 HARDCORE COMPACTED IN 150MM LAYERS7 EARTH  \n8 MESH REINFORCING  \n9  5 NO I2MM DIA.BARS WITH CAGING @60O CRSI0 SAND BLINDINGI I0OMM CONC'FOOTPATH12 HARDCORE  \n13  19MM EXTERNAL RENDERING WITH BELL CASTI4 IOOMM EXTERNAL LEAF CONC'BLOCKWORK15 I0OMM FOIL BACKED REGID INSULATIONI6 IOOMM INNERLEAF CONC'BLOCKWORK17  12MM INTERNAL RENDERING18 I00×18 MM SKIRTING19 WEAK CONC'FILL TO BASE OF CAVITY  \n7  \nFLOOR CONSTRUCTION  \nI   75MM POWERFLOATED SCREED2 I0OMM FOIL BACKED RIGID INSULATION3 RADON BARRIER4 SAND BLINDING5 A393 MESH6 R.C.RAFT SLAB7 HARDCORE  \n8   12MM REINFORCING BARS9 I0OMM CONCRETE FOOTPATHI0 PLINTH  \nCAVITY WALL CONSTRUCTION  \nI 1  19MM ETERNAL RENDER  \n12 I0OMM BLOCKWORK  \n13  1OOMM RIGID INSULATION  \nI4 IOOMM BLOCKWORK  \n15  12MM INTERNAL PLASTER  \nI6 I00×18 MM SKIRTING  \n17 D.P.C.  \n18 WEAK CONCRETE CAVITY FILL  \nSUSPENDED TIMBER FLOOR CONSTRUCTION  \n|   18MMT+GFLOOR BOARDS2 IOOMM FOIL BACKED RIGID INSULATION3  150×44 TREATED S.W.JOISTS@40OCRS4  100×75 TREATED S.W.WALLPLATE5 D.P.C.  \n6 DWARF WALLS(MIN HEIGHT 75MM @1.2M CRS MIN)7   150MM CONCRETE SLAB8 RADON BARRIER9 SAND BLINDINGIO 150MM HARDCOREII SAND BLINDING12 LINTOL13 PROPRIETARY VENT  \n# JUNCTION OF SUSPENDED TIMBER FLOOR丰CONCRETE FLOOR-SCALE I:1O\n\nI0  \n|I  \nCONCRETE FLOOR CONSTRUCTION  \nI   75MM POWERFLOATED SCREED2 IOOMM FOIL BACKED RIGID INSULATION3   150MM CONCRETE SLAB4 RADON BARRIER  \n5 HARDCORE COMPACTED IN 150MM LAYERS6 EARTH7 MESH REINFORCING  \n8  5 NO I2MM DIA.BARS WITH CAGING @600 CRS9 SAND BLINDINGI0 IOOMM CONC'FOOTPATHI HARDCORE  \n12 I9MM EXTERNAL RENDERING WITH BELL CAST13 IOOMM EXTERNAL LEAF CONC'BLOCKWORKI4 IOOMM FOIL BACKED REGID INSULATION15 IOOMM INNERLEAF CONC'BLOCKWORKI6 I2MM INTERNAL RENDERING17 I00×18 MM SKIRTING  \nSECTION THROUGH WINDOW HEAD,CILL丰JAMB SCALE I:5  \n05  \n04  \n03  \n02  \nOI  \n12  \n3 IOOMM RIGID INSULATION  \n4 I0OMM BLOCKWORK  \n5   12MM INTERNAL PLASTER  \n6 STEPPED DPC  \n7 LINTOL  \n8 I00×75 hARDWOOD WINDOW HEAD  \n9   24MM DOUBLE GLAZING  \nI0 GLAZING BEAD  \nI I00×75 HARDWOOD WINDOW CILL  \n12  18MM WINDOW BOARD  \n13 INSULATED PLASTERBOARD  \nI4 CONCRETE CILL  \n15 WRAPPED DPC  \nI6  44OMM CAVITY CLOSER BLOCK  \n# TRADITIONAL CUT ROOF\n\n13  \n12  \nBoard  \n# VERGE DETAIL SCALE I:5\n\nFLAT ROOF EAVES DETAIL SCALE I:5  \n# JUNCTION OF FLAT ROOF AND RISING WALL/PARAPET\n\nFLAT ROOF VERGE DETAIL SCALE I:5  \nI9mm Plywood  \nFirring Piece  \nCeling Joist  \nI0Omm Rigid  \nInsulation  \nVapour Barrier","cbCaic0B4TpS94cB","https://ap.wps.com/l/cbCaic0B4TpS94cB","pdf",1902868,14,"English","# Floor Construction\n## Cavity Wall Construction\n## Suspended Timber Floor Construction\n## Concrete Floor Construction\n## Section Through Window Head, Cill & Jamb\n## Traditional Cut Roof\n## Verge Detail\n## Flat Roof Eaves Detail\n## Junction of Flat Roof and Rising Wall/Parapet","[{\"question\":\"What layers are included in the floor construction build-up?\",\"answer\":\"The drawings list a sequence including powerfloated screed, foil-backed rigid insulation, radon barrier, sand blinding, concrete slab, hardcore in compacted layers, earth, and mesh reinforcing, followed by reinforcement bars and footpath/cover elements.\"},{\"question\":\"What components make up the cavity wall construction section?\",\"answer\":\"The cavity wall build-up specifies blockwork layers on both sides, rigid insulation between, external rendering and internal plastering, along with DPC and weak concrete cavity fill elements.\"},{\"question\":\"Which roof and junction details are shown?\",\"answer\":\"The document includes traditional cut roof details, verge and flat roof eaves details, and the junction of flat roof with rising wall/parapet, including insulation, vapor barrier, and framing/board elements.\"}]","Construction-Drawings | PDF",1792807855,35]