[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662667-105":59,"doc-detail-662667-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","construction-drawing-application-required-for-construction-drawing-review-payment-and-submission-requirements","Construction Drawing Application - Required for Construction Drawing Review - Payment and Submission Requirements","","Application form required for Construction Drawing review by Star Sewer & Water District. Only the property owner or the owner’s legal representative may submit construction drawings, with names listed exactly as they appear on legal documents; when not the owner, applicant title or relationship is required. The form collects applicant/owner, engineer, and project information, specifies sewer and water connection quantities, and states that payment is required at submission time. Incomplete submissions are not accepted for review.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/construction-drawing-application-required-for-construction-drawing-review-payment-and-submission-requirements/662667/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/construction-drawing-application-required-for-construction-drawing-review-payment-and-submission-requirements/662667.png","ImageObject",300,407,{"name":92,"@type":93},"Fahsai","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Who is allowed to submit construction drawings for review?","Question",{"text":112,"@type":113},"Only the property owner or the owner’s legal representative may submit construction drawings. If the applicant is not the property owner of record, the applicant must include their title or relationship to the owner.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What happens if the application is submitted without payment or is incomplete?",{"text":117,"@type":113},"Applications and plans will not be accepted without payment. Incomplete submittals are not accepted for review, and the application, required plans/documents, and payment must be submitted together.",{"name":119,"@type":110,"acceptedAnswer":120},"What construction drawing documents and items must be included in the package?",{"text":121,"@type":113},"The package must include a full paper set of construction drawings, a final plat, Idaho DEQ checklist(s), PDF versions on a thumb drive, and scaled map/vicinity map on the cover sheet with north arrow and scale on all sheets, plus required utility sheets, utility plan/profiles, and the specified Idaho DEQ checklists.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662667,1793221492,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},549768702563,"https://ap-avatar.wpscdn.com/avatar/8000c4aa63b76e948b?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786536092046926083","CONSTRUCTION DRAWING APPLICATION PO Bo1x0843010|WSt. Sar,taIteDS8t3re66et9  \nPhone: 208-286-7388  \nStar Sewer & Water District  \nThis application is required for Construction Drawing review. Only the property owner or the owner's legal representative may submit Construction Drawings. List names exactly as they should appear on legal documents. If the applicant is not the property owner of record, include the applicant's title or relationship to the owner.  \n1. APPLICANT / OWNER INFORMATION  \n\n| Applicant / Property Owner / Authorized Representative-PRINT LEGIBLY |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| Mailing Address |  | City | State | ZIP |\n| Daytime Phone | Email Address-PRINT LEGIBLY |  |  |  |\n\n2. ENGINEER INFORMATION  \n\n| Engineer | Firm | Email |\n| --- | --- | --- |\n| Phone Number | Address |  |\n\n3. PROJECT INFORMATION  \n\n| General Location of Property |  | Name of Development |\n| --- | --- | --- |\n| Number of Sewer Connections | Number of Water Connections |  |\n| Lineal Feet of Sewer Main | Number of Sewer Manholes |  |\n| Number of Fire Hydrants | Number of Sampling Stations\u003Cbr>1 per 150 lots |  |\n\nAPPLICATION AND PLANS WILL NOT BE ACCEPTED WITHOUT PAYMENT  \nThe applicable application fee must be submitted at the time of application.  \n4. SUBMISSION REQUIREMENTS  \nConstruction Drawings for subdivision and commercial developments will be reviewed by District staff and submitted to Idaho DEQ for its records. To avoid unnecessary delays and expense, submit a complete application package with all required items below.  \n| Application Fee\u003Cbr>Residential Subdivision 1-20 lots Residential Subdivision 20-100 lots\u003Cbr>Residential Subdivision 100+ lots\u003Cbr>Commercial Site/Subdivision | $750.00\u003Cbr>$850.00\u003Cbr>$950.00\u003Cbr>$850.00 |\n| --- | --- |\n\nConstruction drawings shall include:  \nRequired with Application  \n Applicable application fee  \n 1 full paper set of construction drawings  \n Final Plat  \n Idaho DEQ checklist(s)  \n PDF version of all documents on a thumb drive  \n Map and Vicinity Map drawn to scale on the cover sheet.  \n North arrow and scale shown on all sheets.  \n Overall Utility Sheet with key map; fire hydrants, sampling stations, and manholes shown and properly numbered.  \n Utility plan and profiles; profiles drawn at the same horizontal scale as plan views.  \n Idaho DEQ checklist: General Plan and Specification Review, Drinking Water Distribution System, and Wastewater Collection System.  \nINCOMPLETE SUBMITTALS WILL NOT BE ACCEPTED FOR REVIEW. Application + required plans/documents + payment must be submitted together.  \nPrint Name  \nApplicant Signature  \nDate","cbCaidVJVhtKtXH0","https://ap.wps.com/l/cbCaidVJVhtKtXH0","pdf",257252,"English","# Applicant / Owner Information\n# Engineer Information\n# Project Information\n# Submission Requirements","[{\"question\":\"Who is allowed to submit construction drawings for review?\",\"answer\":\"Only the property owner or the owner’s legal representative may submit construction drawings. If the applicant is not the property owner of record, the applicant must include their title or relationship to the owner.\"},{\"question\":\"What happens if the application is submitted without payment or is incomplete?\",\"answer\":\"Applications and plans will not be accepted without payment. Incomplete submittals are not accepted for review, and the application, required plans/documents, and payment must be submitted together.\"},{\"question\":\"What construction drawing documents and items must be included in the package?\",\"answer\":\"The package must include a full paper set of construction drawings, a final plat, Idaho DEQ checklist(s), PDF versions on a thumb drive, and scaled map/vicinity map on the cover sheet with north arrow and scale on all sheets, plus required utility sheets, utility plan/profiles, and the specified Idaho DEQ checklists.\"}]","Construction Drawing Application - Required for Construction Drawing Review - Payment and Submission Requirements | PDF"]