[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-202128-105":59,"doc-detail-202128-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","commonwealth-of-kentucky-adjustment-of-rates-of-gte-south-incorporated-case-no-10117","COMMONWEALTH OF KENTUCKY - ADJUSTMENT OF RATES OF GTE SOUTH, INCORPORATED - CASE NO. 10117","","Kentucky Public Service Commission order addressing GTE South Incorporated’s requests for rate and charge adjustments under KRS 278.180. The filing history covers proposed tariff changes for local exchange and custom calling services, Commission suspensions, and consolidation of related proceedings stemming from revised accounting procedures under a new uniform system of accounts. The order also details intervenors, motions to dismiss and rehear, and the procedural schedule governing the suspension period and investigation into revised tariffs and revenue impacts.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/commonwealth-of-kentucky-adjustment-of-rates-of-gte-south-incorporated-case-no-10117/202128/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/commonwealth-of-kentucky-adjustment-of-rates-of-gte-south-incorporated-case-no-10117/202128.png","ImageObject",300,407,{"name":92,"@type":93},"Chloe Bennett","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-18","2026-09-04",true,{"@type":102,"interactionType":103,"userInteractionCount":44},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the main purpose of Case No. 10117?","Question",{"text":112,"@type":113},"Case No. 10117 addresses adjustments of rates and charges for GTE South Incorporated, including proposed tariff changes and the resulting annual revenue impacts under KRS 278.180.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How did the Commission handle the proposed tariffs’ effective dates?",{"text":117,"@type":113},"The Commission suspended the proposed tariffs for a period of months after the effective date, requiring further investigation and procedural steps before changes could take effect.",{"name":119,"@type":110,"acceptedAnswer":120},"Which proceedings were consolidated into Case No. 10117?",{"text":121,"@type":113},"The Commission incorporated Case No. 10116 into Case No. 10117, with an identical suspension period, after GTE South sought rehearing and consolidation related to revised accounting procedures.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},202128,1788542525,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":44,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144,"preview_page_count":4},962084925782,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","# COMMONWEALTH OF KENTUCKYBEFORE THE PUBLIC SERVICE COMMISSION\n\nIn the Matter of:  \n# ADJUSTMENT OF RATES OF GTE SOUTH,INCORPORATEDcASE No.10117\n\nINDEX  \nProcedural Background  \nANALYSIS AND DETERMINATION  \nTest Period  \nVALUATION  \nNet Investment Rate Base  \nCash Working Capital  \n:Prepayments  \nCOE Categories 3 and 4  \nTelephone Plant Under Construction  \nOther Rate Base Adjustments  \nCapital  \nCapitalization vs.Rate Base  \nREVENUES AND EXPENSES  \nLocal Service Revenue  \nToll Revenues  \nEnd of Period Adjustment  \nUnbillable Toll  \nInterexchange Access Revenue  \nTariff Adjustment  \nMisreported Revenue  \nRent Revenues  \nUniform System of Accounts  \nBudget 1988  \nSoftware  \nImplementation Costs  \nRegulatory Lag  \n1  \n5  \n5  \n6  \n6  \n7  \n7  \n8  \n8  \n9  \n10  \n11  \n12  \n12  \n15  \n15  \n16  \n17  \n17  \n18  \n18  \n19  \n19  \n21  \n29  \n29  \nSeparations Adjustments31COE Category 332COE Category 436GTE South's Post-Consolidation Study38General Office Expenses40General Office Ezpenses Allocation andValue of Service Study40General Office Expenses Normalized43General Office Capital Carrying Charges44General Office Employee Pension Costs46Affiliated Company Transactions47Directory Revenues49GTE Service Corporation Value of Service Study56GTE Laboratories57GTE Data Services58Maintenance Expenses58.Central Office Conversion Maintenance Expense58Test Desk Work Maintenance Expense61Trouble Isolation61Employee Compensation Expenses62Early Retirement Program62Post-Test-Period Wager and Salary Increases63Medical and Dental Insurance66Other Adjustments68Budget Department Expenses68Interexchange Carrier Billing andCollection Expenses68Interest Synchronization69Interest During Construction70Lobbying Expenses70Management Audit Expense70Miscellaneous Expenses -Account 777971Miscellaneous Other Adjustments71Interest on Customer Deposits74RATE OF RETURN74Capital Structure74  \nCost of Debt76Return of Equity77Rate of Return Summary84REVENUE REQUIREMENTS84RATE DESIGN84Custom Calling85Touch Calling86Toll Terminal Service86Mileage Charges87Special Line Conditioning88Rate Relationship88Joint User Service91  \n1.544 Mebabit Access Line and Special Transport91Trouble Isolation92Collection of Unbilled Revenues94FINDINGS AND ORDERS95  \n—1  \nCOMMONWEALTH OF KENTUCKYBEFORE THE PUBLIC SERVICE COMMISSION  \nIn the Matter of:  \n# ADJUSTMENT OF RATES OF GTE SOUTHINCORPORATEDCASE NO.10117\n\n## 0 R D E R\n\nProcedural Background  \nOn December 30,  1987,GTE South Incorporated(\"GTE South\"〉filed its letter of intent to seek additional rates and charges.On January 29,  1988,  GTE South filed notice of proposedadjustments in its rates and charges pursuant to KRS 278.180 to be.effective March 1,1988.,  These,proposed changes increasedrevenues in the amount of $15,577,011 on an annual basis.  ByOrder dated February 1,  1988,  the Comumission suspended theproposed tariffs for 5 months on and after the effective date.  \nOn December 30,1987,GTE South filed a separate applicationwith the Commission for authority to file tariff changes,to beeffective as soon after January 1,1988 as lawfully permitted,which would permit the recovery of revenue requirements caused bythe change in accounting procedures adopted by the Commission inAdministrative Case No.310,Adoption of a New Uniform System ofAccounts for Kentucky Telephone Companies.    This applicationcontained tariffs which would increase the existing rates forlocal exchange service in the amount of $5,757,507 on an annualbasis effective January 19,1988 and was docketed as Case No.10116,Application of GTE South Incorporated for Authority to File  \nTariffs for the Recovery of Revenue Requirements Caused by theChanges in Accounting Procedures.  In order to investigate thereasonableness of the revised tariffs,the Commission by Orderdated January 11,1988 suspended the proposed tariffs for 5 monthsafter the effective date.  \nIntervening in these proceedings were:  the Attorney Generalof the Commonwealth of Kentucky,by and through his Utility andRat","cbCaikUMG6sNwH6N","https://ap.wps.com/l/cbCaikUMG6sNwH6N","pdf",3919939,116,"English","# 0 R D E R\n## Procedural Background\n## ANALYSIS AND DETERMINATION\n## Test Period\n## VALUATION\n## REVENUES AND EXPENSES\n## FINDINGS AND ORDERS","[{\"question\":\"What is the main purpose of Case No. 10117?\",\"answer\":\"Case No. 10117 addresses adjustments of rates and charges for GTE South Incorporated, including proposed tariff changes and the resulting annual revenue impacts under KRS 278.180.\"},{\"question\":\"How did the Commission handle the proposed tariffs’ effective dates?\",\"answer\":\"The Commission suspended the proposed tariffs for a period of months after the effective date, requiring further investigation and procedural steps before changes could take effect.\"},{\"question\":\"Which proceedings were consolidated into Case No. 10117?\",\"answer\":\"The Commission incorporated Case No. 10116 into Case No. 10117, with an identical suspension period, after GTE South sought rehearing and consolidation related to revised accounting procedures.\"}]","COMMONWEALTH OF KENTUCKY - ADJUSTMENT OF RATES OF GTE SOUTH, INCORPORATED - CASE NO. 10117 | PDF",292]