[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-651017-105":59,"doc-detail-651017-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","commercial-building-plans-plans-and-documentation-checklist","COMMERCIAL BUILDING PLANS - Plans and Documentation Checklist","","Commercial building plans and documentation checklist for the City of Hermiston Building Department, outlining requirements used during permit plan review. Covers site plan and civil drawings (scale, north arrow, lot dimensions, easements, utilities, ADA access), building plan drawings with correct orientation, proposed use and occupancy classification, Oregon engineer/architect stamp rules, energy compliance, foundation, floor, ceiling/roof framing or truss layouts, and detailed plumbing, mechanical, life-safety, and construction sections.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/commercial-building-plans-plans-and-documentation-checklist/651017/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/commercial-building-plans-plans-and-documentation-checklist/651017.png","ImageObject",300,407,{"name":92,"@type":93},"eBook King","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What site plan elements are required for commercial building plan submissions?","Question",{"text":112,"@type":113},"The checklist requires a scaled site plan including a north arrow, lot dimensions and setbacks, easements, adjacent street names and all property lines, building/layout elements, finish floor elevations, existing and proposed utilities with connection details, and applicable structures, plus ADA accessibility and routes.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What must be included in the full set of building plans?",{"text":117,"@type":113},"Plans must be drawn to scale with correct orientation and north arrow, and include proposed use, building type and occupancy classification, Oregon engineer or architect stamps on all sheets with expiration date and original signature, and energy compliance forms or prescriptive values.",{"name":119,"@type":110,"acceptedAnswer":120},"Which structural, plumbing, mechanical, and safety details are expected?",{"text":121,"@type":113},"Submittals should include foundation plans and reinforcing, floor framing plans or I-joist layout with calculations, ceiling/roof framing or truss layouts with reactions and delivery lists, floor plans with room IDs and plumbing fixtures plus smoke and carbon monoxide detector locations, rated assembly and building sections, handrail/guardrail and stair details, plus plumbing, mechanical equipment layouts, exit and emergency lighting, and any required fire protection/special equipment.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},651017,1792857383,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},962088006270,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","CITY OF HERMISTON-BUILDING DEPARTMENT  \n215 E GLADYS AVE., HERMISTON, OR 97838 PH. 541.667.5025  \n[building@hermiston.or.us](building@hermiston.or.us)  \nCOMMERCIAL BUILDING PLANS  \nPlans and documentation checklist  \nThe permit process includes a review of your building plans and materials. The following list is to be used as a guide.  \n1. Site plan and civil drawings (building department use only. Planning Dept. may have different requirements), drawn to scale on minimum of 24 x 36 paper, which includes the following  \n1. North arrow, scale, lot dimensions, setbacks and all public and/or private easements  \n2. Names of all adjacent streets, and all property lines including those within the project site  \n3. Layout of buildings, decks, driveways, sidewalks, parking and handicap/fire department access  \n4. Finish floor elevations  \n5. Existing public and private utilities located on the property (Storm, Water & Sewer)  \n6. Proposed utility’s location to point of connection/discharge, size, slope, length, and material: including footing and under-floor drains and fire service/hydrants  \n7. All applicable structures on the property  \n8. ADA Accessibility, parking, entrances, & accessible routes  \n2. Building Plans drawn to scale with correct building orientation and north arrow. Preferred size is 24 x 36.  \n3. Proposed use, building type and occupancy classification  \n4. Oregon Engineer or architect stamp on all sheets with expiration date and one needs to be an original signature  \n5. Energy Compliance forms, or provide prescriptive values  \n6. Foundation plan including footing size, wall height, sections and required reinforcing  \n7. Floor details:  \n1. Floor framing plan at each floor (post & beam or joists w/ size & spacing, including deck attachments and connections) or  \n2. I joist layout from manufacturer with calculation for beams  \n8. Ceiling/roof framing plan or truss layout with reactions and delivery list for truss profiles  \n9. Floor plan(s) existing and proposed showing room ID’s and all plumbing fixtures, location of smoke & carbon monoxide detectors  \n10. Window sizes, typical  \n11. Rated assembly details. Floor-ceilings & walls  \n12. Complete building sections-special sections including exterior decks  \n13. Construction details for structural members, insulation, sheathing, roofing, bracing, etc.  \n14. Handrail, guardrail, stair headroom and stairs/landing details  \n15. Engineering for special conditions (truss, high walls, bracing, etc. ) to be transferred to plans showing the expiration date of the engineering stamp  \n16. Plumbing layout and fixture content. Restrooms in compliance with ADA requirements  \n17. Mechanical plan including layout and make/model of equipment  \n18. Exit signs, exit lighting and emergency lighting  \n19. Other items which may be required  \n1. Smoke detectors, fire alarms, sprinkler system detail  \n2. Show/list special equipment","cbCaibddqbxIXfJe","https://ap.wps.com/l/cbCaibddqbxIXfJe","pdf",123810,"English","# Plans and Documentation Checklist\n## Site plan and civil drawings\n## Building plans requirements\n## Structural, plumbing, mechanical, and life-safety details","[{\"question\":\"What site plan elements are required for commercial building plan submissions?\",\"answer\":\"The checklist requires a scaled site plan including a north arrow, lot dimensions and setbacks, easements, adjacent street names and all property lines, building/layout elements, finish floor elevations, existing and proposed utilities with connection details, and applicable structures, plus ADA accessibility and routes.\"},{\"question\":\"What must be included in the full set of building plans?\",\"answer\":\"Plans must be drawn to scale with correct orientation and north arrow, and include proposed use, building type and occupancy classification, Oregon engineer or architect stamps on all sheets with expiration date and original signature, and energy compliance forms or prescriptive values.\"},{\"question\":\"Which structural, plumbing, mechanical, and safety details are expected?\",\"answer\":\"Submittals should include foundation plans and reinforcing, floor framing plans or I-joist layout with calculations, ceiling/roof framing or truss layouts with reactions and delivery lists, floor plans with room IDs and plumbing fixtures plus smoke and carbon monoxide detector locations, rated assembly and building sections, handrail/guardrail and stair details, plus plumbing, mechanical equipment layouts, exit and emergency lighting, and any required fire protection/special equipment.\"}]","COMMERCIAL BUILDING PLANS - Plans and Documentation Checklist | PDF"]