[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662958-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-662958-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","commercial-as-built-drawing-requirements-general","Commercial As-built Drawing Requirements - General","","Commercial as-built drawing requirements specify that each plan sheet must be prepared and certified by a Florida Registered Land Surveyor and clearly labeled as \"AS-BUILT\" with the responsible surveyor’s name, address, and registration number. The drawings must include north arrow, street names, easements, and the benchmark location, elevation, and datum. Drainage elements, stormwater retention/detention basin limits at defined intervals, and water and sewer components with relevant elevations, inverts, and pipe details must be accurately shown.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/commercial-as-built-drawing-requirements-general/662958/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/commercial-as-built-drawing-requirements-general/662958.png","ImageObject",300,407,{"name":42,"@type":43},"putri.kecil17","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"Who must prepare and certify the \"AS-BUILT\" commercial drawings in Florida?","Question",{"text":62,"@type":63},"The drawings must be prepared and certified by a Florida Registered Land Surveyor.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What labeling and identification information is required on each sheet?",{"text":67,"@type":63},"Each sheet must be labeled \"AS-BUILT\" in one-inch high bold letters, and it must name the responsible surveyor with address and registration number.",{"name":69,"@type":60,"acceptedAnswer":70},"What drainage and stormwater details must be shown on the \"AS-BUILT\" drawings?",{"text":71,"@type":63},"The plans must show locations and elevations for drainage structures, pipes (including invert, size, type, and length), ditches/swales/canals, and any stormwater conveyance features, plus top and bottom bank elevations for retention/detention basins at changes of direction and 50' intervals.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},662958,1793223917,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":30},962094509873,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","# Commercial As-built Drawing Requirements\n\n## General\n\n□1.Must be prepared and certified by a Florida Registered Land Surveyor.  \n□2.Each sheet must be labeled \"AS-BUILT\"in one inch high bold letters  \n□3.Name,address,registration number of Florida Registered Land Surveyor responsible for preparing \"AS-BUILT\".  \n□4.North Arrow.  \n□5.Street Names.  \n□6.Easements as shown on approved paving and drainage drawings must be depicted on \"AS-BUILT\".  \n□7.Location,elevation and datum of the Benchmark used.  \n8.Approved Paving &Drainage Plans may be used for the\"AS-BUILT\"drawings when all construction is in substantial  \n□ compliance with the approved plans.Cross through all changes in design elevations and indicate \"AS-BUILT\"conditions.If  \nsubstantial deviations have been made new \"AS-BUILT\"drawings will be required.  \n## lmprovements\n\n9.Show location ofall on and offsite improvements including paving,driveways,buildings,walkways,buffer,fencing,  \n□dumpster enclosure detail,and all accessible routes to the elements and facilities,including parking to confirm that theeproposed improvements were constructed according to the approved plans.  \n10.Sufficient elevations must be shown to confirm that the proposed improvements were constructed according toapproved plans,induding finished floor elevation(s).  \n□11.Sufficient dimensional data to confirm that the proposed improvements were constructed according to approved plans.  \n## Drainage-Conveyance Systems\n\n12.Show location and elevations of (a)drainage structures(catch basins,manholes,etc);(b)pipes(include invert,size,type,  \n□ and length);(c)ditches,swales,and Canals,etc.(separate from roadway))and;(d)any other improvements or features usedfor conveyance of stormwater.  \nDrainage-Stormwater Retention/Detention Basins  \n□13.Show location and elevations along topand bottom of bank at changes of direction and 50'intervals.  \n14.Show location and elevations of any control structures,weirs,orifices,etc.(include crest elevations,crestlength andorifice diameter,etc.  \n## Water and Sewer\n\n□15.Horizontal and vertical location of sewer manholes,and lateral service connections(including pipe inverts).  \n□16.Horizontal location of water meters,valves,fire hydrants,backflow preventors,etc.  \n17.Horizontal and vertical location of lift stations/wet wellsif applicable with inverts of all connecting piping and pumpdescription indicating size and type of pumps installed.  \n## Other Utilities\n\n□18.Horizontal and vertical location.","cbCais6kOx1oBK7P","https://ap.wps.com/l/cbCais6kOx1oBK7P","pdf",132171,"English","# General\n## Improvements\n## Drainage-Conveyance Systems\n## Water and Sewer\n## Other Utilities","[{\"question\":\"Who must prepare and certify the \\\"AS-BUILT\\\" commercial drawings in Florida?\",\"answer\":\"The drawings must be prepared and certified by a Florida Registered Land Surveyor.\"},{\"question\":\"What labeling and identification information is required on each sheet?\",\"answer\":\"Each sheet must be labeled \\\"AS-BUILT\\\" in one-inch high bold letters, and it must name the responsible surveyor with address and registration number.\"},{\"question\":\"What drainage and stormwater details must be shown on the \\\"AS-BUILT\\\" drawings?\",\"answer\":\"The plans must show locations and elevations for drainage structures, pipes (including invert, size, type, and length), ditches/swales/canals, and any stormwater conveyance features, plus top and bottom bank elevations for retention/detention basins at changes of direction and 50' intervals.\"}]","Commercial As-built Drawing Requirements - General | PDF"]