[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-203796-105":59,"doc-detail-203796-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","coking-coal-production-from-cokals-bbm-mine-on-track-for-september-2022","Coking Coal Production from Cokal’s BBM Mine On Track - for September 2022","","Cokal Limited announces imminent coking coal production from its Bumi Barito Mineral (BBM) mine, with first saleable coal planned for September 2022. The release reports development progress supporting the company’s low-cost, high-margin strategy, and outlines key milestones across development schedule, haul road upgrades, land compensation and clearance activities. It also confirms board approval and includes a forward-looking statements disclaimer and contact details for investor enquiries.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/coking-coal-production-from-cokals-bbm-mine-on-track-for-september-2022/203796/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/coking-coal-production-from-cokals-bbm-mine-on-track-for-september-2022/203796.png","ImageObject",300,407,{"name":92,"@type":93},"Ophelia","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-08","2026-09-04",true,{"@type":102,"interactionType":103,"userInteractionCount":29},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the main update in this ASX media release?","Question",{"text":112,"@type":113},"Cokal reports that coking coal production from its BBM mine is on track, with first saleable coal planned for September 2022.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which development activities support the September 2022 timeline?",{"text":117,"@type":113},"Progress is reported across Krajan Jetty development (nearly 90% complete), haul road upgrades, land compensation for the Pit 3 area, and scheduled land clearance and pre-strip/OB working.",{"name":119,"@type":110,"acceptedAnswer":120},"How is the forward-looking information handled in the release?",{"text":121,"@type":113},"The release includes forward-looking statements and explains that actual results may differ due to risks and uncertainties, and it states the information is provided as of the issue date without undertaking to update it.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},203796,1788563941,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},7971461741311,"https://ap-avatar.wpscdn.com/avatar/74000253aff267980c6?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779345379180704826","ASX ANNOUNCEMENT / MEDIA RELEASE  \n3 June 2022  \nCoking Coal Production from Cokal’s BBM Mine On Track  \nfor September 2022  \nCokal Limited (Cokal) (ASX: CKA) is pleased to announce imminent coking coal production from Bumi Barito Mineral (BBM) (Cokal 60%), with the first saleable coal on track for September 2022.  \nBBM’s successful development progress demonstrates the continued execution of Cokal’s strategy of achieving low-cost, high-margin coking coal production.  \nCokal is pleased to provide the following updates in regards to development activities:  \nDevelopment Schedule  \nDevelopment Milestone  \nScheduled Date  \n\n| Krajan Jetty to Pit 3 Hauling | Road | Completed by 20 June 2022 |\n| --- | --- | --- |\n| Land Compensation activity | at Pit 3 area | Completed by 20 June 2022 |\n| Land Clearance in Pit 3 area | (commencing 22 June) | 31 July 2022 |\n| Pre Strip / OB working |  | Commencing 1st week August 2022 |\n| First saleable coal |  | September 2022 |\n\nKrajan Site Development  \nJetty Development  \n- Krajan Jetty development is almost 90% complete.  \n- Coal stockpile area, fuel tank storage and other jetty facilities are already in place.  \n- Initial coal loading will be direct ramp loading using 30 tonne dump trucks.  \nHaul Road Construction  \n- Haul road from Krajan Jetty to Pit 3 has been upgraded with additional land compensation for widening certain stretches of the road.  \n- Additional land compensation totalling to 30 Hectares has been completed on the haul road.  \n- The current road to Pit 3 is scheduled to completed by 20 June 2022.  \nLand Compensation  \n- Land compensation is ongoing for the Pit 3 Area.  \n- A total of 347 Hectares of land will be compensated (purchased) as part of the mining plan for the next 2 years, and will support infrastructure including camps, haul road, blasting material warehouse, workshops, and other items.  \n- Land Compensation activity is on track to be completed by 20 June 2022 in line with the haul road completion.  \nPhotos  \nKrajan Jetty Development  \nCoal stockpile area development at Krajan Jetty  \nHaul road construction  \nApproval  \nThis release has been approved by the Board of Directors of Cokal.  \nENDS  \nFurther enquiries:  \nDomenic Martino  \nNon-Executive Chairman  \n[dmartino@cokal.com.au](dmartino@cokal.com.au)  \nThis ASX announcement was authorised for release by the Board of Cokal Limited.  \nAbout Cokal Limited  \nCokal Limited (ASX:CKA) is an Australian listed company with the objective of becoming a metallurgical coal producer with a global presence. Cokal has interests in four projects in Central Kalimantan , Indonesia considered prospective for metallurgical coal.  \nForward Looking Statements  \nThis release includes forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.  \nForward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the company’s actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licencesand permits and diminishing quantities or grades of resources or reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future operate, environmental conditions including e","cbCaihNtbBJhU6Nh","https://ap.wps.com/l/cbCaihNtbBJhU6Nh","pdf",538599,"English","# Development Schedule\n## Development Milestone\n# Krajan Site Development\n## Jetty Development\n## Haul Road Construction\n## Land Compensation\n# Approval\n# Forward Looking Statements","[{\"question\":\"What is the main update in this ASX media release?\",\"answer\":\"Cokal reports that coking coal production from its BBM mine is on track, with first saleable coal planned for September 2022.\"},{\"question\":\"Which development activities support the September 2022 timeline?\",\"answer\":\"Progress is reported across Krajan Jetty development (nearly 90% complete), haul road upgrades, land compensation for the Pit 3 area, and scheduled land clearance and pre-strip/OB working.\"},{\"question\":\"How is the forward-looking information handled in the release?\",\"answer\":\"The release includes forward-looking statements and explains that actual results may differ due to risks and uncertainties, and it states the information is provided as of the issue date without undertaking to update it.\"}]","Coking Coal Production from Cokal’s BBM Mine On Track - for September 2022 | PDF",13]