[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-462246-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-462246-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","code-of-practice-for-the-co-ordination-of-street-and-road-works-march-2026","Code of practice for the co-ordination of street and road works - March 2026","","Legislative framework under the New Roads and Street Works Act 1991 and the Traffic Management Act 2004, supported by regulations and codes of practice, for coordinating street works by undertakers and road works by highway authorities. Sets the objective of balancing statutory rights to carry out works with road users’ expectations of minimum disruption, including changes enabling administration and management through permit schemes. Focuses on permit scheme updates that strengthen control, coordination, and direction of excavations to reduce disruption.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/code-of-practice-for-the-co-ordination-of-street-and-road-works-march-2026/462246/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/code-of-practice-for-the-co-ordination-of-street-and-road-works-march-2026/462246.png","ImageObject",300,407,{"name":42,"@type":43},"Sophia Brooks","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-24","2026-09-30",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",8,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What laws and supporting instruments form the framework for street and road works coordination?","Question",{"text":63,"@type":64},"The code is based on the New Roads and Street Works Act 1991 and the Traffic Management Act 2004, supported by relevant regulations and codes of practice.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What is the main aim of the code of practice?",{"text":68,"@type":64},"To balance highway authorities’ and undertakers’ statutory rights to carry out works with road users’ right to expect minimum disruption.",{"name":70,"@type":61,"acceptedAnswer":71},"How do permit schemes affect the coordination and control of works?",{"text":72,"@type":64},"Recent changes tighten the framework for excavations under permit schemes, giving authorities more power to coordinate, control, and direct works effectively to minimise disruption.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},462246,1791373254,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":55,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":39,"preview_page_count":145,"preview_urls":146},962084925636,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Code of practice for the  \nco-ordination of street and road works  \nMarch 2026  \nDepartment for Transport Great Minster House  \n33 Horseferry Road London SW1P 4DR  \n© Crown copyright 2025  \nThis publication is licensed under the terms of the Open Government Licence v3 .0 except where otherwise stated. To view this licence, visit [https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/](https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or contact)[ or contact](https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or contact), [The National Archives at](The National Archives at www.nationalarchives.gov.uk/contact-us)[ ](The National Archives at www.nationalarchives.gov.uk/contact-us)[www.nationalarchives.gov.uk/contact-us](The National Archives at www.nationalarchives.gov.uk/contact-us).  \nWhere we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned.  \nThis publication is also available on our website at  \n[www.gov.uk/government/organisations/department-for-transport](www.gov.uk/government/organisations/department-for-transport)  \nAny enquiries regarding this publication should be sent to us at  \n[www.gov.uk/government/organisations/department-for-transport](www.gov.uk/government/organisations/department-for-transport)  \nContents  \nExecutive summary 6  \nChapter 1- Introduction 8  \n1.1 Introduction 8  \n1.2 Legislative framework 9  \n1.3 Other statutory obligations 10  \nChapter 2 – Co-ordination and collaboration 12  \n2.1 Introduction 12  \n2.2 Information 12  \n2.3 Analysis and assessment considerations 15  \n2.4 Co-operation 16  \n2.5 Collaborative working 16  \nChapter 3-The national street gazetteer 22  \n3.1 Introduction 22  \n3.2 The local and national street gazetteers 22  \n3.3 Additional street data 22  \n3.4 Maintaining and updating the LSG and ASD 24  \nChapter 4-Register of works in a street 28  \n4.1 Introduction 28  \n4.2 Public access to information contained in street manager 29  \n4.3 Entering information on the register 29  \n4.4 Requirements for Street Manager 29  \nChapter 5-Streets subject to special controls 31  \n5.1 Introduction 31  \n5.2 Protected streets 32  \n5.3 Streets with special engineering difficulties (SED) 33  \n5.4 Traffic-sensitive streets 36  \n5.5 Procedure for making designations 38  \n5.6 Review procedure 40  \nChapter 6-Restrictions 42  \n6.1 Introduction 42  \n6.2 Substantial works – definitions 43  \n6.3 Creating a restriction 44  \n6.4 Duration of restrictions 48  \n6.5 Works during a restriction 49  \n6.6 Policy guidance 51  \n6.7 Dispute resolution 52  \nChapter 7-Works' classification 53  \n7.1 Introduction 53  \n7.2 Legislative background 53  \n7.3 Works requiring a permit 56  \n7.4 Categorisation of works 59  \nChapter 8-General principles 63  \n8.1 Introduction 63  \n8.2 Common rules 64  \n8.3 Notification types 65  \n8.4 Process in the event of Street Manager being unavailable 67  \nChapter 9-Guidance on when a validity window applies 68  \n9.1 Introduction 68  \n9.2 Explaining the validity window 68  \n9.3 Guidance on the start date under NCT01a – planned works 69  \n9.4 Guidance on using the validity window under NCT01b – planned works 69  \nChapter 10-Charging schemes 71  \n10.1 Introduction 71  \n10.2 Section 74A – charge determined by reference to duration of works 71  \n10.3 Section 74 – charge for occupation of the highway where works unreasonably prolonged 71  \n10.4 Exempt works 72  \n10.5 Prescribed period 73  \n10.6 Reasonable period 73  \n10.7 Duration of works 74  \n10.8 Notification timescales for actual start and works closed 75  \n10.9 Formal warning 77  \n10.10 Charging regime 78  \n10.11 Mitigated charges 81  \n10.12 Remedial works and subsequent phases 82  \n10.13 Charging process 82  \nChapter 11-Fixed penalty notices 84  \n11.1 Introduction 84  \n11.2 Fixed penalty offences 85  \n11.3 Penalty charges and time periods 87  \n11.4 Guidance for authorities 89  \n11.5 Guidance for promoters ","cbCaiuOHFMQzuQNv","https://ap.wps.com/l/cbCaiuOHFMQzuQNv","pdf",1356321,119,"English","# Executive summary\n# Chapter 1- Introduction\n# Chapter 2 – Co-ordination and collaboration\n# Chapter 3-The national street gazetteer\n# Chapter 4-Register of works in a street\n# Chapter 5-Streets subject to special controls\n# Chapter 6-Restrictions\n# Chapter 7-Works' classification\n# Chapter 8-General principles\n# Chapter 9-Guidance on when a validity window applies\n# Chapter 10-Charging schemes\n# Chapter 11-Fixed penalty notices\n# Chapter 12-Related matters\n# Chapter 13-Dispute resolution\n# Appendices","[{\"question\":\"What laws and supporting instruments form the framework for street and road works coordination?\",\"answer\":\"The code is based on the New Roads and Street Works Act 1991 and the Traffic Management Act 2004, supported by relevant regulations and codes of practice.\"},{\"question\":\"What is the main aim of the code of practice?\",\"answer\":\"To balance highway authorities’ and undertakers’ statutory rights to carry out works with road users’ right to expect minimum disruption.\"},{\"question\":\"How do permit schemes affect the coordination and control of works?\",\"answer\":\"Recent changes tighten the framework for excavations under permit schemes, giving authorities more power to coordinate, control, and direct works effectively to minimise disruption.\"}]","Code of practice for the co-ordination of street and road works - March 2026 | PDF",1790763690,12,[147,151,155,159,163,167,171,175,179,183,187,192],{"page_no":22,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/aa9d3ae3d6e937930cfd95b2892fde10.webp",983,1390,{"page_no":26,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/330ae8d9fb339e5e6d6a5f97387f487c.webp",982,1388,{"page_no":30,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/dd70823396623733a1ab0f51191f80fc.webp",981,1387,{"page_no":33,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/72ea714a3800e1ae3cc7dc096a50f332.webp",980,1385,{"page_no":97,"url":164,"width":165,"height":166},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/0dbcdb0b567e94be00e124548436893a.webp",979,1384,{"page_no":102,"url":168,"width":169,"height":170},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/4f5c805c303cc79bf35d60498a1c8500.webp",978,1382,{"page_no":107,"url":172,"width":173,"height":174},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/50b481a7c9665f61f8e396d4f8fd812e.webp",977,1381,{"page_no":55,"url":176,"width":177,"height":178},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/7fa35d21c23b8d9e3328a5f94608eb97.webp",976,1379,{"page_no":115,"url":180,"width":181,"height":182},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/f9db921575fcd2e9559055718342539a.webp",975,1378,{"page_no":123,"url":184,"width":185,"height":186},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a2a0c099fa21e3bc41245604e1edf7ae.webp",974,1376,{"page_no":188,"url":189,"width":190,"height":191},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/cef0633175bf3c0e01211ec333cb9a67.webp",973,1375,{"page_no":145,"url":193,"width":194,"height":195},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/bd72887e74df6470ff38fe20226c7330.webp",972,1374]