[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663917-105":59,"doc-detail-663917-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","cmm-gdt-measurement-planning-educational-presentation","CMM-GD&T Measurement Planning - Educational Presentation","","Educational presentation on measurement planning for coordinate measuring machines (CMMs), focusing on geometrical tolerances defined by ASME Y14.5 (GD&T) and the role of ASME B89.7.2 Dimensional Measurement Planning. It explains why measurement methods are not dictated by ASME Y14.5, and how organizations must design measurement plans considering business needs, measurement uncertainty, cost, legal and liability concerns, organizational policies, and customer requirements. Includes learning objectives and a case study approach to practical inspector decision-making.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/cmm-gdt-measurement-planning-educational-presentation/663917/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/cmm-gdt-measurement-planning-educational-presentation/663917.png","ImageObject",300,407,{"name":92,"@type":93},"Bulrr","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"为什么ASME Y14.5本身不规定具体测量方法？","Question",{"text":112,"@type":113},"ASME Y14.5用于在工程图纸上建立一致的作图实践与公差要求，定义的是公差区，而不是测量方法合规标准。文档强调测量方法的制定仍需由用户结合实际情况决定。","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"制定CMM测量方案时需要考虑哪些业务与技术因素？",{"text":117,"@type":113},"需要考虑测量成本、测量目的、通过与失败误差的影响、法律/责任问题、组织政策以及客户要求。文档同时提出：当测量不确定度能够满足业务需求时，测量方法才是可接受的。",{"name":119,"@type":110,"acceptedAnswer":120},"文档中的案例研究“Inspector who said ‘So What?’”主要在解决什么问题？",{"text":121,"@type":113},"案例通过对合同检测实验室的审计展示如何判断测量不确定度是否满足业务需求。示例测量圆柱轴线的垂直度，并讨论点数、软件算法、CMM/探头配置以及基准与工件坐标系等关键要素。","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663917,1793234095,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":36},5909892115043,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","CMM-GD&T MEASUREMENT PLANNING  \nAN EDUCATIONAL PRESENTATION FROM THE LEADING MANUFACTURER OF METROLOGY INSTRUMENTS  \nASME Y14 .5  \nISO 1101  \nEDUCATION  \nEDU-14001A-H  \nMitutoyo Institute of Metrology  \nThe Mitutoyo Institute of Metrology provides educational courses and on-demand resources across a wide variety of measurement related topics including basic inspection techniques, principles of dimensional metrology, calibration methods, and [GD&T. Visit](GD&T. Visit www.mitutoyo.com/education)[ ](GD&T. Visit www.mitutoyo.com/education)[www.mitutoyo.com/education](GD&T. Visit www.mitutoyo.com/education) for details on the educational opportunities available from Mitutoyo America Corporation.  \nAbout this Presentation  \nThis presentation has been delivered at a number of national and international events, and based on the positive response received, Mitutoyo America Corporation wanted to make it more widely available. Many users of coordinate measuring machines (CMMs) struggle with the measurement of workpieces toleranced in accordance with ASME Y14 . 5 (GD&T) . There is no measurement method dictated by ASME Y14 . 5, as this standard is for defining product requirements and isnot a measurement compliance standard. Users of CMMs must consider a number of business and technical factors when planning a measurement method. This presentation introduces the topic of measurement planning and highlights the American national standard on Dimensional Measurement Planning, ASME B89 .7.2. This presentation recommends organizations develop best practices for CMM use, and some examples and topics for consideration are discussed.  \n© 20 15 Mitutoyo America Corporation  \nCoordinate Measuring Machines  \nSensor Systems  \nVision Measuring Systems  \nTest Equipment and Seismometers  \nForm Measurement  \nDigital Scale and DRO Systems  \nOptical Measuring  \nSmall Tool Instruments and Data Management  \nWhatever your challenges are,  \nMitutoyo supports you from start to finish.  \nMitutoyo is not only a manufacturer of top-quality measuring products but one that also offers qualified support for the lifetime of the equipment, backed by comprehensive services that ensure your staff can make the very best use of the investment.  \nApart from the basics of calibration and repair, Mitutoyo offers product and metrology training, as well as IT support for the sophisticated software used in modern measuring technology. We can also design, build, test and deliver measuring solutions and even, if deemed cost-effective, take your critical measurement challenges in-house on a sub-contract basis.  \nMitutoyo America Corporation Education  \n965 Corporate Boulevard Aurora, Illinois 60502 Phone: 888-648-8869 option 6  \nFax: 630-978-6471  \nFind additional product literature and our product catalog  \n[www.mitutoyo.com](www.mitutoyo.com)  \nTrademarks and Registrations  \nDesignations used by companies to distinguish their products are often claimed as trademarks . In all instances where Mitutoyo America Corporation is aware of a claim, the product names appear in initial capital or all capital letters . The appropriate companies should be contacted for more complete trademark and registration information.  \nMitutoyo America Corporation  \n[www.mitutoyo.com](www.mitutoyo.com)  \nOne Number to Serve You Better 1-888-MITUTOYO (1-888-648-8869)  \nM3 Solution Centers:  \nAurora, Illinois (Headquarters) Boston, Massachusetts Huntersville, North Carolina Mason, Ohio  \nPlymouth, Michigan City of Industry, California Birmingham, Alabama Renton, Washington Houston, Texas  \n| |  |\n| --- | --- |\n| | Introduction to CMM-GD&T Measurement Planning |\n| |  |\n\nLearning Objectives ofthis Presentation  \n• Identify roadblocks to success in the implementation of modern measuring equipment for the measurement of geometrical tolerances (GD&T) .  \n• Apply techniques for the development of optimal measurement plans and their deployment across an organization.  \n• Identify differences between US and intern","cbCaib0QEx6OZzwx","https://ap.wps.com/l/cbCaib0QEx6OZzwx","pdf",2585738,16,"English","# Introduction to CMM-GD&T Measurement Planning\n## Learning Objectives\n## ASME Y14.5-2009: Scope and Implications\n## Measurement Planning Principles\n## Case Study: “The Inspector Who Said ‘So What’”","[{\"question\":\"为什么ASME Y14.5本身不规定具体测量方法？\",\"answer\":\"ASME Y14.5用于在工程图纸上建立一致的作图实践与公差要求，定义的是公差区，而不是测量方法合规标准。文档强调测量方法的制定仍需由用户结合实际情况决定。\"},{\"question\":\"制定CMM测量方案时需要考虑哪些业务与技术因素？\",\"answer\":\"需要考虑测量成本、测量目的、通过与失败误差的影响、法律/责任问题、组织政策以及客户要求。文档同时提出：当测量不确定度能够满足业务需求时，测量方法才是可接受的。\"},{\"question\":\"文档中的案例研究“Inspector who said ‘So What?’”主要在解决什么问题？\",\"answer\":\"案例通过对合同检测实验室的审计展示如何判断测量不确定度是否满足业务需求。示例测量圆柱轴线的垂直度，并讨论点数、软件算法、CMM/探头配置以及基准与工件坐标系等关键要素。\"}]","CMM-GD&T Measurement Planning - Educational Presentation | PDF"]