[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664854-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-664854-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","clyde-refinery-removal-demolition-work-plan","CLYDE REFINERY REMOVAL - Demolition Work Plan","","Demolition Work Plan prepared by Liberty Industrial Pty Ltd for The Shell Company of Australia Limited, covering the removal of refinery assets at Clyde. The plan describes revision history, specialist deconstruction capabilities, and a structured scope that includes hazardous materials removal, asbestos abatement, tanks cleaning, and decontamination of processing plant. It outlines site location, project objectives, references, logistics and access, supervision, weather and structural details, demolition sequencing, engineering requirements, transportation, onsite processing, recycling and waste management, and safety and environmental risk controls.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/clyde-refinery-removal-demolition-work-plan/664854/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/clyde-refinery-removal-demolition-work-plan/664854.png","ImageObject",300,407,{"name":42,"@type":43},"sagouaw","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the main purpose of the Clyde Refinery Removal Demolition Work Plan?","Question",{"text":62,"@type":63},"It sets out the demolition work framework for removing refinery assets, including clearly defined purpose, scope, and project objectives for Shell’s Clyde site.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What hazardous material removal activities are included?",{"text":67,"@type":63},"The scope covers removal of hazardous materials, including transformers, residual liquids and solids, asbestos abatement, and tanks cleaning.",{"name":69,"@type":60,"acceptedAnswer":70},"How does the plan address safety and environmental risk control?",{"text":71,"@type":63},"It includes demolition risk assessment activities and specifies safety and environmental risk control measures, along with regulatory authority notification and waste management practices.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},664854,1793276511,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},3985747862151,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","CLYDE REFINERY REMOVAL  \nDemolition Work Plan  \nPrepared by Liberty Industrial Pty Ltd for  \nThe Shell Company of Australia Limited  \n\n| Revision No. | Revision Date | Authority | Changes |\n| --- | --- | --- | --- |\n| A | 05.02.2014 | CD | RFP Submission (FOR SHELL APPROVAL) |\n| B | 23.03.2014 | DW | Review |\n| C | 24.07.2014 | DW | URS comments added |\n| D | 29.07.2014 | DW | Shell comments added |\n| E | 12.08.2014 | DW | URS comments addressed |\n| F | 03.10.2014 | JC | DPE comments addressed |\n\nSpecialist Deconstruction Services  \n■ Industrial deconstruction contractors ■ Mine closure consulting ■ 3D Modelling  \n■ Deconstruction consultants ■ Asbestos abatement  \nLiberty Industrial Pty Ltd A.B.N. 99 147 758 487  \nTABLE OF CONTENTS  \n1 PURPOSE ........................................................................................................... 4  \n2 SCOPE ................................................................................................................ 5  \n3 PROJECT OBJECTIVES .................................................................................... 5  \n4 REFERENCES .................................................................................................... 5  \n5 SITE LOCATION ................................................................................................. 7  \n5.1 GENERAL DESCRIPTION OF THE SITE ....................................................................... 8  \n6 GENERAL SCOPE OF WORK ........................................................................... 8  \n6.1 REMOVAL OF HAZARDOUS MATERIALS .................................................................... 8  \n6.1.1 Transformers........................................................................................................ 8  \n6.1.2 Residual Liquids and Solids ................................................................................. 9  \n6.1.3 Asbestos ............................................................................................................ 10  \n6.1.4 Tanks Cleaning .................................................................................................. 10  \n6.2 DECONTAMINATION OF PROCESSING PLANT ........................................................ 10  \n6.3 GENERAL DEMOLITION TECHNIQUES...................................................................... 11  \n6.4 COLD CUT DISMANTLING OF PIPEWORK ADJACENT TO LIVE SERVICES............ 11  \n6.5 DEMOLITION OF REFINERY STACKS ........................................................................ 11  \n7 PLANNING ........................................................................................................ 12  \n7.1 PROJECT SUPERVISION ............................................................................................ 12  \n7.2 SITE INVESTIGATION ................................................................................................. 14  \n7.3 MANAGEMENT PLANS ................................................................................................ 15  \n7.4 WEATHER .................................................................................................................... 15  \n7.5 SITE ACCESS .............................................................................................................. 16  \n7.6 STRUCTURAL DETAILS .............................................................................................. 16  \n7.6.1 Height of the structure ........................................................................................ 16  \n7.6.2 Distance from the structures to the site boundary .............................................. 16  \n7.6.3 Services ............................................................................................................. 16  \n8 UNDERSTANDING OF SPECIFIC PROBLEMS .............................................. 17  \n9 SITE ORGANISATION...................................................................................","cbCaidZlSRNPPqxt","https://ap.wps.com/l/cbCaidZlSRNPPqxt","pdf",1263057,29,"English","# PURPOSE\n# SCOPE\n# PROJECT OBJECTIVES\n# REFERENCES\n# SITE LOCATION\n## GENERAL DESCRIPTION OF THE SITE\n# GENERAL SCOPE OF WORK\n## REMOVAL OF HAZARDOUS MATERIALS\n## DECONTAMINATION OF PROCESSING PLANT\n## GENERAL DEMOLITION TECHNIQUES\n## COLD CUT DISMANTLING OF PIPEWORK ADJACENT TO LIVE SERVICES\n## DEMOLITION OF REFINERY STACKS\n# PLANNING\n## PROJECT SUPERVISION\n## SITE INVESTIGATION\n## MANAGEMENT PLANS\n## WEATHER\n## SITE ACCESS\n## STRUCTURAL DETAILS\n# UNDERSTANDING OF SPECIFIC PROBLEMS\n# SITE ORGANISATION\n## PERIMETER FENCING\n## DEMOLITION CONTROL ZONE\n## BARRICADE AND SIGNS\n## MATERIALS PROCESSING AREA\n## FIRST AID\n## SITE AMENITIES\n# DEMOLITION METHODOLOGY\n## DEMOLITION SEQUENCING","[{\"question\":\"What is the main purpose of the Clyde Refinery Removal Demolition Work Plan?\",\"answer\":\"It sets out the demolition work framework for removing refinery assets, including clearly defined purpose, scope, and project objectives for Shell’s Clyde site.\"},{\"question\":\"What hazardous material removal activities are included?\",\"answer\":\"The scope covers removal of hazardous materials, including transformers, residual liquids and solids, asbestos abatement, and tanks cleaning.\"},{\"question\":\"How does the plan address safety and environmental risk control?\",\"answer\":\"It includes demolition risk assessment activities and specifies safety and environmental risk control measures, along with regulatory authority notification and waste management practices.\"}]","CLYDE REFINERY REMOVAL - Demolition Work Plan | PDF",73]