[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-202214-105":59,"doc-detail-202214-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","clear-creek-improvement-inter-local-agreement","Clear Creek Improvement Inter-Local Agreement","","Clear Creek Improvement Inter-Local Agreement sets out cooperation between Port of Tacoma and Pierce County to preserve and enhance Clear Creek surface-water resources, reduce flood risk, and improve habitat. The agreement is structured under Chapter 39.34 RCW and references expected NRDA grant funding administered by NOAA and the Commencement Bay Trustees. It describes two Clear Creek projects: a retrofit to an existing wooden flap gate and the removal of an access road to restore off-channel salmonid habitat and wetlands.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/clear-creek-improvement-inter-local-agreement/202214/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/clear-creek-improvement-inter-local-agreement/202214.png","ImageObject",300,407,{"name":92,"@type":93},"Seraphina","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-18","2026-09-04",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",11,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"Who are the parties to the Clear Creek Improvement Inter-Local Agreement?","Question",{"text":113,"@type":114},"The agreement is between Port of Tacoma and Pierce County, acting through the Pierce County Department of Planning and Public Works - Surface Water Management.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What are the two projects described in the agreement?",{"text":118,"@type":114},"The first is a retrofit to a wooden flap gate at the confluence of Clear Creek and the Puyallup River. The second is removal of an existing access road that separates Clear Creek from a wetland.",{"name":120,"@type":111,"acceptedAnswer":121},"How does the agreement address ownership and responsibility for culverts and flow-control gates?",{"text":122,"@type":114},"It states that WSDOT owns and is responsible for the twin-barrel culverts and supporting subsurface materials, while WSDOT does not own and is not responsible for the two flow control gates and related appurtenances affixed to the culverts.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},202214,1788543628,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":130,"read_time":145,"preview_page_count":4},962075114101,"https://ap-avatar.wpscdn.com/avatar/e000253a75eb197efd?x-image-process=image/resize,m_fixed,w_180,h_180&k=1780044092746381165","202206060184 ADIETZ126 PGS  \n06/06/202210:35:08AM $0.00AUDITOR,Pierce County,MASHTNGTON  \nName &Return Address:  \n   iercet2702S42nd +109acu,984  \nWashington State Recorder's Cover Sheet(RCW 65.04)Please print legibly or type information.  \n\n| Clear Creek Improverment Inter-Locaat Intero rene    |\n| --- |\n| Grantor(s)  \u003Cbr>Additional Names on Page _______of Document  \u003Cbr>Por+ ofTacoma   |\n| Grantee(s)  \u003Cbr>Additional Names on Page ______of Document  \u003Cbr>Tievce County   |\n| Legal Description  \u003Cbr>(Abbreviated:i.e.,lot,block &subdivision name or number OR section/township/range and quarter/quarter section)  \u003Cbr>Complete Legal Description on Page_____of Document  \u003Cbr>TaLc  \u003Cbr>ouua Assessor's traets  \u003Cbr>pt 2RE、;tn o,P    |\n| Auditor's Reference Number(s)  \u003Cbr>35Ool与535bto72  \u003Cbr>201081,5000   |\n| Assessor's Property Tax Parcel/Account Number(s)  \u003Cbr>bOO35oo72  \u003Cbr>032013021,S00035007\\,   |\n| Non Standard Fee $50.00  \u003Cbr>By signing below,you agree to pay the $50.00 non standard fee.  \u003Cbr>l am requesting an emergency non standard recording for an additional fee as provided in  \u003Cbr>RCW 36.18.010.I understand that the recording processing requirements may cover up or otherwise  \u003Cbr>obscure some part of the text of the original document.  \u003Cbr>二人Ce_   |\n| Signature of Party Requesting Non Standard Recording  \u003Cbr>NOTE:Do not sign above or pay additional $50.00 fee if document meets margin/formatting requirements.  \u003Cbr>The Auditor/Recorder will rely on the information provided on this cover sheet.  \u003Cbr>Staff will not read the document to verify the accuracy or completeness of the indexing information provided herein.   |\n\nN:\\Recording\\Forms\\RecordingCoverSheet.docx Rev 7/14  \n# CLEAR CREEK IMPROVEMENT INTER-LOCAL AGREEMENT\n\nIn support of Pierce County objectives to preserve and enhance surface water resourcesand provide flood risk reduction improvements to the Clear Creek area,along with the Port ofTacoma's long-standing commitment to environmental stewardship along Clear Creek,thisagreement seeks to advance those respective goals.  \nTHIS INTER-LOCAL AGREEMENT(“Agreement”)is made and entered into under Chapter 39.34RCW by and between Port of Tacoma,a Washington State special purpose municipal corporation(\"Port\")and Pierce County,a municipal corporation and political subdivision of the State ofWashington,by and through Pierce County Department of Planning and Public Works -SurfaceWater Management(“Pierce County”),on the Effective Date as stated in the last paragraph herein.For purposes of this Agreement,the Port and Pierce County may each be referred to individually asa “Party”or collectively as the“Parties”.  \n# RECITALS\n\nA.WHEREAS,Pierce County expects to receive two National Resource DamageAssessment (NRDA)grants as administered by the National Oceanic &Atmospheric Association(NOAA)and the Commencement Bay Trustees,for the purpose of improving and restoring off-channel salmonid habitat within Clear Creek.  \nB.WHEREAS,Pierce County is seeking to provide off-channel habitat improvements andflood risk reduction in the Clear Creek area through the design and construction of two projects.Thefirst,being a retrofit to an existing wooden flap gate at the confluence of Clear Creek and the PuyallupRiver(Exhibit A-\"D227 Clear Creek Flood Gate Retrofit Proiect\").The second.being the removalof an existing access road that currently separates Clear Creek from an existing wetland(Exhibit B-\"D228 Clear Creek Habitat Restoration Project\").Exhibit A and Exhibit B include the preliminarydesign plans for the referenced projects;both exhibits are attached hereto and incorporated byreference herein.  \nC.WHEREAS,the normal and routine flow of Clear Creek is conveyed under and throughWashington State highway State Route 167(SR-167)to the Puyallup River by twin-barrel concreteculverts,located at approximately Mile Post 0.81 of SR-167.  \nD.WHEREAS,wooden flow-control flap gates were previously installed on the river-sideoutlet of each culvert for the purpose o","cbCaiaBODoyBMFPw","https://ap.wps.com/l/cbCaiaBODoyBMFPw","pdf",10583545,126,"English","# Clear Creek Improvement Inter-Local Agreement\n## Recitals\n## Project Background and Funding Intent\n## Description of the Two Projects\n## Culvert and Flow-Control Gate Responsibilities\n## Debris Barrier Apparatus Ownership and Maintenance","[{\"question\":\"Who are the parties to the Clear Creek Improvement Inter-Local Agreement?\",\"answer\":\"The agreement is between Port of Tacoma and Pierce County, acting through the Pierce County Department of Planning and Public Works - Surface Water Management.\"},{\"question\":\"What are the two projects described in the agreement?\",\"answer\":\"The first is a retrofit to a wooden flap gate at the confluence of Clear Creek and the Puyallup River. The second is removal of an existing access road that separates Clear Creek from a wetland.\"},{\"question\":\"How does the agreement address ownership and responsibility for culverts and flow-control gates?\",\"answer\":\"It states that WSDOT owns and is responsible for the twin-barrel culverts and supporting subsurface materials, while WSDOT does not own and is not responsible for the two flow control gates and related appurtenances affixed to the culverts.\"}]","Clear Creek Improvement Inter-Local Agreement | PDF",318]