[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662639-105":59,"doc-detail-662639-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","city-of-new-westminster-supplementary-specifications-and-detail-drawings-june-26-2023","CITY OF NEW WESTMINSTER - SUPPLEMENTARY SPECIFICATIONS AND DETAIL DRAWINGS - June 26, 2023","","Supplementary Specifications and Detail Drawings for the City of New Westminster, providing amendments, additions, and deletions to the Master Municipal Construction Documents. The document includes amendment register entries and a structured table of contents covering supplementary specifications and approved materials, as well as detailed drawings for roads, sewers, and water. It specifies precedence rules and introduces technical requirements such as connection testing, pressure testing, video inspection procedures, leakage testing, and contractor electrical qualification, scheduling, and supervision obligations.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/city-of-new-westminster-supplementary-specifications-and-detail-drawings-june-26-2023/662639/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/city-of-new-westminster-supplementary-specifications-and-detail-drawings-june-26-2023/662639.png","ImageObject",300,407,{"name":92,"@type":93},"Asher","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of the supplementary specifications in this document?","Question",{"text":112,"@type":113},"It provides additions, amendments, and deletions to the Master Municipal Construction Documents, including supplementary specifications and referenced supplementary detail drawings and approved materials.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What does the document state about precedence among the document components?",{"text":117,"@type":113},"The List of Approved Materials and Products takes precedence over the Master Municipal Construction Documents and must be read together with the Supplementary Specifications and Supplementary Detail Drawings.",{"name":119,"@type":110,"acceptedAnswer":120},"What technical inspection and testing requirements are referenced?",{"text":121,"@type":113},"It includes requirements such as bacteriological testing and review for chlorination, flushing and pressure testing for connections; minimum pressure testing for sewage force mains; lamp testing prior to video inspection; video inspection timing before acceptance or end of maintenance; and leakage testing requirements with defined test types.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662639,1793221228,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},687197207639,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","# CITY OFNEW WESTMINSTER\n\nCITY OF NEW WESTMINSTER  \n# SUPPLEMENTARYSPECIFICATIONSAND DETAIL DRAWINGS\n\nJune 26,2023  \n                              June 26,2023.  \n\n| AMENDMENT REGISTER   |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| Amendment  \u003Cbr>No.   | Date   | Amended  \u003Cbr>Section   | Amended  \u003Cbr>Page   | Description of Amendment   |\n| 8369   | June 26,2023   | Section 3   |  | Delete and replace Section 3 with new  \u003Cbr>Supplementary Detail Drawings   |\n| 8412   | Sept.11,2023   | AlI   | AII   | In all headers where May 29,2006 appears,delete  \u003Cbr>and replace with March 12,2007   |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n\n# TABLE OF CONTENTS\n\n1.    Supplementary Specifications-Additions,amendments and deletions toSpecifications in the MMCD  \n2.    List of Approved Materials and Products  \n3.   Supplementary Detail Drawings  \n(a)Roads  \nDrawing No.TitleSDR-1Road Sections-Arterial Roads (4-Lane)SDR-2Road Sections-Arterial Roads (2-Lane)SDR-3Road Sections-Collector(City)Roads (4-Lane)SDR-4Road Sections-Collector(City)Roads (2-Lane)SDR-5Road Sections-Collector(Neighbourhood)RoadsSDR-6Road Sections-Local RoadsSDR-7Half Road Cross SectionSDR-8Lane Cross SectionSDR-9Boulevards -Boulevard Irrigation Line with VaultSDR-10Boulevards Drainage with CleanoutSDR-11ATree Grate DetailSDR-11BTree Grate FrameSDR-12Boulevard Cross Section for Grass and ConcreteSDR-13Single Curb RampSDR-14Curb Ramp-Option 1SDR-15Curb Ramp-Option 2SDR-16Driveway LetdownSDR-17AConcrete Bus Pad DetailSDR-17BBus Shelter Pad DetailsSDR-18Speed HumpSDR-19Turnaround  \nSDR-20  \nTurnaround Cul-de-Sac Bulb  \n(b)Sewers  \nDrawing No.  \nTitle  \nSDS-1  \nLot Grading Plan RequirementsSwale  \nSDS-2  \nSDS-3A  \nTypical Lot Service Connections (Separated Sewer)Typical Lot Service Connections (Combined Sewer)Standard Side Inlet Catch BasinSandbag Type Culvert HeadwallManhole Framing &CoverCatch Basing Grate &Cover  \nSDS-3B  \nSDS-4  \nSDS-5  \nSDS-6  \nSDS-7  \nSDS-8  \nTypical Forcemain Connection-Wet Tap CoringManhole for Sanitary Forcemain  \nSDS-9  \nTypical Sanitary Forcemain Connection P.L.ChamberCleanout Manhole for Sanitary ForcemainPrivate Pump System Configuration (Layout)Private Pump System Configuration(Detail)  \nSDS-10  \nSDS-11  \nSDS-12A  \nSDS-12B  \n(c)Water  \nDrawing No.TitleSDW-1Gate Valve Cover InstallationSDW-2Water Meter for 19MM &25MM Service ConnectionSDW-3Fire Domestic Split  \nThis document contains additions,amendments,and deletions to the Master MunicipalConstruction Documents.Section 1 addresses Supplementary Specifications,Section 2 outlinesa List of Approved Materials and Products outlining clarification as to acceptable types andmanufacturers for materials,and Section 3 contains Supplementary Detail Drawings.  \n## 1.SUPPLEMENTARY SPECIFICATIONS\n\n\n| General   |  |  |\n| --- | --- | --- |\n| 1.0   |  | The List of Approved Materials and Products shall take  \u003Cbr>precedence over the Master Municipal Construction Documents  \u003Cbr>and shall be read in conjunction with the Supplementary  \u003Cbr>Specifications and Supplementary Detail Drawings.   |\n| Section 02666-Waterworks   |  |  |\n| Delete the following   |  |  |\n| 2.2.2   |  |  |\n| 2.2.3   |  |  |\n| 2.2.4.4   |  |  |\n| 2.2.4.5   |  |  |\n| 2.2.4.11   |  |  |\n| 2.3.2.3   |  |  |\n| Add the following   |  |  |\n| 3.2.3   | Connection to  \u003Cbr>Existing Mains   | The Consulting Engineer is responsible for bacteriological  \u003Cbr>testing and review of the chlorination,flushing and pressure  \u003Cbr>testing.   |\n|  |  |  |\n| Section 02732-Sewage Forcemains   |  |  |\n| Delete the following   |  |  |\n| 2.2.2   |  |  |\n| 2.2.4   |  |  |\n| 2.2.5.4   |  |  |\n| 2.2.5.5   |  |  |\n| 2.2.5.11   |  |  |\n| 2.2.6   |  |  |\n| 2.2.7   |  |  |\n| Add the following   |  |  |\n| 3.15   | Pressure  \u003Cbr>Testing   | Minimum test pressure is 700","cbCail5QvGCScyxB","https://ap.wps.com/l/cbCail5QvGCScyxB","pdf",13604320,51,"English","# TABLE OF CONTENTS\n## Supplementary Specifications-Additions, amendments and deletions to Specifications in the MMCD\n## List of Approved Materials and Products\n## Supplementary Detail Drawings\n### (a) Roads\n### (b) Sewers\n### (c) Water\n# 1. SUPPLEMENTARY SPECIFICATIONS\n## General\n## Section 02666 - Waterworks\n## Section 02732 - Sewage Forcemains\n## Section 2721 - Storm Sewers\n## Section 2723 - Pipe Culverts\n## Section 2731 - Sanitary Sewers\n## Section 16550 - Electrical","[{\"question\":\"What is the purpose of the supplementary specifications in this document?\",\"answer\":\"It provides additions, amendments, and deletions to the Master Municipal Construction Documents, including supplementary specifications and referenced supplementary detail drawings and approved materials.\"},{\"question\":\"What does the document state about precedence among the document components?\",\"answer\":\"The List of Approved Materials and Products takes precedence over the Master Municipal Construction Documents and must be read together with the Supplementary Specifications and Supplementary Detail Drawings.\"},{\"question\":\"What technical inspection and testing requirements are referenced?\",\"answer\":\"It includes requirements such as bacteriological testing and review for chlorination, flushing and pressure testing for connections; minimum pressure testing for sewage force mains; lamp testing prior to video inspection; video inspection timing before acceptance or end of maintenance; and leakage testing requirements with defined test types.\"}]","CITY OF NEW WESTMINSTER - SUPPLEMENTARY SPECIFICATIONS AND DETAIL DRAWINGS - June 26, 2023 | PDF",129]