[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662662-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-662662-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","city-of-lacey-washington-lift-station-6-rehabilitation-appendix-1-index-of-drawings","City of Lacey, Washington - Lift Station 6 Rehabilitation - Appendix 1 - Index of Drawings","","Appendix 1 provides the index and organized listing of drawing sheets for the City of Lacey, Washington Lift Station 6 Rehabilitation project, dated November 2022. It enumerates General, Erosion Control, Civil, Lift Station Replacement, Awning, Electrical, and Typical Details plan sets, including cover, general notes, system capacity and design data, site erosion control, water main and sewer profiles, demolition and grading, lift station plans and sections, awning profiles and details, and electrical wiring, diagrams, and approved material lists. It also includes official construction approval information and detailed general contractor requirements for sewer system work.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/city-of-lacey-washington-lift-station-6-rehabilitation-appendix-1-index-of-drawings/662662/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/city-of-lacey-washington-lift-station-6-rehabilitation-appendix-1-index-of-drawings/662662.png","ImageObject",300,407,{"name":42,"@type":43},"Taylor Morgan","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What drawings are included in Appendix 1 for the Lift Station 6 rehabilitation project?","Question",{"text":62,"@type":63},"Appendix 1 lists sheet numbers grouped by disciplines such as General, Erosion Control, Civil, Lift Station Replacement, Awning, Electrical, and Typical Details.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What general contractor requirements are specified in the appendix?",{"text":67,"@type":63},"The requirements cover compliance with city standards, dimension verification, locating and protecting underground utilities, potholing utilities, inspecting pipes prior to backfill, and ensuring continuous sanitary sewer operation.",{"name":69,"@type":60,"acceptedAnswer":70},"How is existing sanitary sewer service managed during construction?",{"text":71,"@type":63},"The appendix states the existing sanitary sewer system and components must remain in operation at all times, and sanitary sewer flow is continuous and cannot be turned off.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},662662,1793221334,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},1099523885336,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","APPENDIX 1  \nLIFT STATION 60% DRAWINGS  \nThis Page Intentionally Left Blank  \n\\\\[ad. msa-ep.com\\Tacoma\\TAC_Projects\\22\\3380.01-06-Lacey LS Consultant Projects\\CAD\\Sheets\\LS 6\\22-3380-WA-LS6-G.dwg G-1 11/18/2022 8:52 AM ELI.JEFFERSON 24.1s (LMS Tech)](ad. msa-ep.com\\Tacoma\\TAC_Projects\\22\\3380.01-06-Lacey LS Consultant Projects\\CAD\\Sheets\\LS 6\\22-3380-WA-LS6-G.dwg G-1 11/18/2022 8:52 AM ELI.JEFFERSON 24.1s (LMS Tech))  \nCITY OF LACEY, WASHINGTON  \nLIFT STATION 6 REHABILITATION LACEY CONTRACT \\#   \nINDEX OF DRAWINGS  \nNOVEMBER 2022  \nGENERAL  \n1 G-1 COVER SHEET, VICINITY MAP & DRAWING INDEX  \n2 G-2 GENERAL NOTES, ABBREVIATIONS & LEGEND  \n3 G-3 SYSTEM-HEAD CAPACITY CURVES AND DESIGN DATA SUMMARY TABLE 4 G-4 EXISTING LIFT STATION 6 SITE  \nEROSION CONTROL  \n5 ECS-1 TEMPORARY EROSION & SEDIMENT CONTROL PLAN \u003CTO FOLLOW>  \nCIVIL  \n6 C-1 WATER MAIN PLAN & PROFILE STA A1+00 TO STA A4+00  \n7 C-2 WATER MAIN PLAN & PROFILE STA A4+00 TO STA A7+25  \n8 C-3 SEWER FORCE MAIN PLAN AND PROFILE STA B1+00 TO STA B4+00  \n9 C-4 SEWER FORCE MAIN PLAN AND PROFILE STA B4+00 TO STA B7+64  \n10 C-5 STORM SEWER PLAN & PROFILE  \n11 C-6 ROADWAY & LANDSCAPING RESTORATION PLAN  \nLIFT STATION REPLACEMENT  \n12 LS-1 SITE DEMOLITION & EROSION CONTROL PLAN  \n13 LS-2 DEMOLITION DETAILS  \n14 LS-3 GRADING, PAVING AND RESTORATION PLAN  \n15 LS-4 SITE AND PIPING PLAN  \n16 LS-5 SITE AND PIPING PROFILE  \n17 LS-6 LIFT STATION PLAN AND SECTION  \nAWNING  \n18 A-1 CABINET AWNING: FRONT & SIDE PROFILES  \n19 A-2 CABINET AWNING: ROOF & FOUNDATION PLAN  \n20 A-3 CABINET AWNING: DETAILS  \nELECTRICAL  \n21 E-1 WIRING SYMBOLS AND REQUIREMENTS  \n22 E-2 ELECTRICAL SITE PLAN  \n23 E-3 MAIN CONTROL CABINET  \n24 E-4 CONTROL SYSTEMS MANUFACTURER CONSTRUCTION DETAILS  \n25 E-5 ONE LINE, INPUT, AND ANALOG WIRING DIAGRAM  \n26 E-6 120 VOLT CONTROL, OUTPUT AND DOL STARTER WIRING DIAGRAMS  \n27 E-7 ISOLATION PEDESTAL CONSTRUCTION DETAIL  \n28 E-8 LOAD TABLES & CONDUIT SCHEDULE  \n29 E-9 FIELD ELECTRICIAN CONSTRUCTION DETAILS SHEET 1  \n30 E-10 FIELD ELECTRICIAN CONSTRUCTION DETAILS SHEET 2  \n31 E-11 APPROVED MATERIAL LIST (BOM) SHEET 1 \u003CTO FOLLOW>  \n32 E-12 APPROVED MATERIAL LIST (BOM) SHEET 2 \u003CTO FOLLOW>  \n33 E-13 PHENOLIC LEGENDS \u003CTO FOLLOW>  \n34 E-14 VINYL LABELS \u003CTO FOLLOW>  \nTYPICAL DETAILS  \n35 D-1 TYPICAL DETAILS-1  \n36 D-2 TYPICAL DETAILS-2  \n37 D-3 TYPICAL DETAILS-3  \n38 D-4 TYPICAL DETAILS-4  \n39 D-5 TYPICAL DETAILS-5  \nVICINITY MAP   \nSCALE: 1\"=10,000'  \nCITY OF LACEY OFFICIALS   \nMAYOR: ANDY RYDER  \nDEPUTY MAYOR: MALCOLM MILLER  \nCOUNCIL MEMBERS: LENNY GREENSTEIN MICHAEL STEADMAN  \nCAROLYN COX ED KUNKEL ROBIN VAZQUEZ  \nCITY MANAGER:  \nSCOTT SPENCE  \nCITY ATTORNEY:  \nDAVE SCHNEIDER  \nCITY ENGINEER:  \nAUBREY COLLIER, P.E., S.E.  \nDIRECTOR OF PUBLIC WORKS: SCOTT EGGER, P.E.  \nAPPROVED FOR CONSTRUCTION DATE  \n\\\\[ad. msa-ep.com\\Tacoma\\TAC_Projects\\22\\3380.01-06-Lacey LS Consultant Projects\\CAD\\Sheets\\LS 6\\22-3380-WA-LS6-G.dwg G-2 11/18/2022 8:52 AM ELI.JEFFERSON 24.1s (LMS Tech)](ad. msa-ep.com\\Tacoma\\TAC_Projects\\22\\3380.01-06-Lacey LS Consultant Projects\\CAD\\Sheets\\LS 6\\22-3380-WA-LS6-G.dwg G-2 11/18/2022 8:52 AM ELI.JEFFERSON 24.1s (LMS Tech))  \n\n| |  |  |  | |  |  |  | |  | EXISTING   PROPOSED |  |  |  | \u003Cbr>AC ASPHALTIC CONCRETE\u003Cbr>ABAN ABANDON(ED) |  |  | ID INSIDE DIAMETER\u003Cbr>IE INVERT ELEVATION |  |  |  | T TELEPHONE\u003Cbr>TB THRUST BLOCK |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| 1. CONTRACTOR SHALL ADHERE TO THE CITY OF LACEY DEVELOPMENT GUIDELINES & PUBLIC WORKS STANDARDS FOR SANITARY SEWER CONSTRUCTION.\u003Cbr>2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES.\u003Cbr>3. THE LOCATION OF EXISTING UNDERGROUND UTILITY SYSTEMS, AS SHOWN HEREON, ARE SHOWN IN AN APPROXIMATE WAY ONLY. WATER AND GAS SERVICE LINES MAY NOT BE SHOWN. THE CONTRACTOR SHALL ANTICIPATE SUCH SERVICES. THE CONTRACTOR SHALL LOCATE AND PROTECT ","cbCaikLOMAtYYaGO","https://ap.wps.com/l/cbCaikLOMAtYYaGO","pdf",43384326,132,"English","# Appendix 1\n## Index of Drawings\n## General\n## Erosion Control\n## Civil\n## Lift Station Replacement\n## Awning\n## Electrical\n## Typical Details\n## Vicinity Map & Officials","[{\"question\":\"What drawings are included in Appendix 1 for the Lift Station 6 rehabilitation project?\",\"answer\":\"Appendix 1 lists sheet numbers grouped by disciplines such as General, Erosion Control, Civil, Lift Station Replacement, Awning, Electrical, and Typical Details.\"},{\"question\":\"What general contractor requirements are specified in the appendix?\",\"answer\":\"The requirements cover compliance with city standards, dimension verification, locating and protecting underground utilities, potholing utilities, inspecting pipes prior to backfill, and ensuring continuous sanitary sewer operation.\"},{\"question\":\"How is existing sanitary sewer service managed during construction?\",\"answer\":\"The appendix states the existing sanitary sewer system and components must remain in operation at all times, and sanitary sewer flow is continuous and cannot be turned off.\"}]","City of Lacey, Washington - Lift Station 6 Rehabilitation - Appendix 1 - Index of Drawings | PDF",333]