[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663317-105":59,"doc-detail-663317-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","city-of-hermantown-new-house-addition-building-permit-packet-minimum-required-information-and-inspections","City of Hermantown New House - Addition Building Permit Packet - Minimum Required Information and Inspections","","City of Hermantown provides a building permit packet for new houses and additions, listing minimum required construction-plan information for plan submission and outlining mandatory inspection steps. The packet specifies required plan sets and drawing content (elevations, floor plans, window schedules, energy calculations, footings, foundation details, floor and wall systems, roof and insulation) along with fire suppression when applicable. It also details inspection sequencing and applicant submission expectations, including erosion and fill permit requirements, fee and deposit guidance, and application checklists.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/city-of-hermantown-new-house-addition-building-permit-packet-minimum-required-information-and-inspections/663317/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/city-of-hermantown-new-house-addition-building-permit-packet-minimum-required-information-and-inspections/663317.png","ImageObject",300,407,{"name":92,"@type":93},"Himbo","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"How many complete sets of construction plans are required for a new house/addition permit?","Question",{"text":112,"@type":113},"Two complete sets are required at 1/4” scale.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When must an applicant schedule footing inspection, and what must be in place?",{"text":117,"@type":113},"Contact City Hall at least 24 hours prior to inspection. Footing inspection occurs before concrete is placed, with forms and reinforcement in place.",{"name":119,"@type":110,"acceptedAnswer":120},"What inspection items are required as construction progresses?",{"text":121,"@type":113},"Required inspections include footing, cast-in-place foundation, foundation (before backfilling), plumbing (air test/visual/final manometer), radon system, framing, insulation, HVAC, drywall (fire rated assemblies), blower door test for new homes, fire suppression if applicable, and final inspection with certificate of occupancy issued.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663317,1793226462,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},687197100911,"https://ap-avatar.wpscdn.com/avatar/a000239b6f1da00475?x-image-process=image/resize,m_fixed,w_180,h_180&k=1785132997149421697","CITY OF HERMANTOWN NEW HOUSE / ADDITION BUILDING PERMIT PACKET  \nMINIMUM REQUIRED INFORMATION FOR CONSTRUCTION PLANS  \n1. Minimum – 2 complete sets – ¼” scale.  \n2. Elevations: Front, rear, side, & cross-sectional detail from footing through roof system  \n3. Floor plan of all floors including basement and garage.  \n4. Window schedule/sizes.  \n5. Energy calculations.  \n6. Footings: Depth/width, reinforcement placement/size.  \n7. Conventional foundations: Wall thickness, concrete reinforcement, block or wood. If wood foundation, all design/construction details per proper agency.  \n8. Slab on grade or post foundation: Some designs may require design by a MN registered structural engineer.  \n9. Floor system: Size, spacing and type of joist/truss. Indicate posts and beams including size/type. Floor sheathing: Thickness/type.  \n10. Wall system: Exterior – size, spacing and type of studs. Exterior wall sheathing, bracing, siding/veneer, weather resistive barrier, insulation type and size, vapor retarder and interior wall finish. Interior wall stud spacing and size.  \n11. Roof system: Size/spacing of framing members including trusses, roof sheathing type/size, underlayment, roofing material.  \n12. Attic insulation material, R-value, and ventilation systems.  \n13. Fire suppression if applicable.  \nINSPECTIONS REQUIRED  \n• Please contact City Hall a minimum of 24 hours prior to inspection  \n• All construction activity in which a building permit is required is subject to inspection. The inspection record card and approved plans are to be on site at all times during construction  \n• No work shall be done on any part of the building beyond the required inspections on the inspection record card without signed approval indicated.  \n1. Footing Inspection: Before concrete is placed. Forms/reinforcement in place  \n2. Cast in Place Foundation Inspection: Before concrete is placed  \n3. Foundation Inspection: Before backfilling, verify drainage system, insulation, waterproofing and backfill material  \n4. Plumbing Inspection: Air test, visual and final manometer  \n5. Radon System Inspection  \n6. Framing Inspection: After rough-ins are completed  \n7. Insulation Inspection: Vapor retarder, insulation and sealing  \n8. HVAC Inspection  \n9. Drywall Inspection: Fire rated assemblies  \n10. New Homes Blower Door Test  \n11. Fire Suppression Inspection, if applicable  \n12. Final Inspection  \n13. Issue Certificate of Occupancy  \nNOTICE TO APPLICANTS FOR CITY OF HERMANTOWN BUILDING PERMITS  \n1. The minimum information required to process your application is listed below.  \n2. Incomplete applications cannot be accepted and must be returned to the applicant.  \nCHECKLIST FOR BUILDING PERMIT APPLICATIONS  \n1. Application for Zoning Certificate Yes No  \n2. Site Plan to Scale Yes No  \na. Signed by Applicant Yes No  \nb. Are dimensions of lots & setbacks shown Yes No  \n3. Building Permit Application  \na. Legal Description and/or Parcel Code Yes No  \nb. Cost of the Project Yes No  \nc. Signature Yes No  \nd. Daytime Phone Number Yes No  \ne. E-mail address Yes No  \n4. Proof of Title for New Construction (Recorded Warranty Deed)  \nYes No  \n5. Proof of Septic System Permit or Certificate of Compliance (if applicable) Yes No  \n6. Two Sets of Construction Plans Yes No  \n7. Driveway Access Permit (If applicable) Yes No  \n8. Erosion & Sediment Control Plan Application Yes No  \nCITY OF HERMANTOWN EROSION CONTROL AND FILL PERMIT APPLICATION  \nPermit is required for all land disturbance activities impacting 500 square feet or more for any project requiring a building permit application for new construction.  \nFEE INFORMATION  \n• Fee-See Fee Schedule  \n• Minimum Deposit** - $500 .00  \no ** Deposit may be increased by Community Development Director based onsite conditions and risk or erosion complications.  \nGENERAL INFORMATION  \n1.) Applicant Contact Information  \n• Business or Entity:  \n• Name:  \n• Address:  \n• Phone:  \n• Cell:  \n• E-mail:  \n2.) Landowner Contact Information (if d","cbCainfAYckOXgie","https://ap.wps.com/l/cbCainfAYckOXgie","pdf",784328,15,"English","# Minimum Required Information for Construction Plans\n## Inspections Required\n## Notice to Applicants for City of Hermantown Building Permits\n## Checklist for Building Permit Applications\n## City of Hermantown Erosion Control and Fill Permit Application\n## Fee Information\n## General Information\n## Project Information","[{\"question\":\"How many complete sets of construction plans are required for a new house/addition permit?\",\"answer\":\"Two complete sets are required at 1/4” scale.\"},{\"question\":\"When must an applicant schedule footing inspection, and what must be in place?\",\"answer\":\"Contact City Hall at least 24 hours prior to inspection. Footing inspection occurs before concrete is placed, with forms and reinforcement in place.\"},{\"question\":\"What inspection items are required as construction progresses?\",\"answer\":\"Required inspections include footing, cast-in-place foundation, foundation (before backfilling), plumbing (air test/visual/final manometer), radon system, framing, insulation, HVAC, drywall (fire rated assemblies), blower door test for new homes, fire suppression if applicable, and final inspection with certificate of occupancy issued.\"}]","City of Hermantown New House - Addition Building Permit Packet - Minimum Required Information and Inspections | PDF",38]