[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662887-105":59,"doc-detail-662887-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","cism-proposed-drainage-general-arrangement","CISM - Proposed Drainage General Arrangement","","This document provides the Proposed Drainage General Arrangement for the University of Swansea CISM building project. It details the infrastructure planning, including the layout of foul and storm drainage systems, specific manhole connections, and invert levels for site development. Produced by AECOM, the technical drawing delineates the integration of new drainage runs with existing site networks, establishing precise engineering specifications for construction. The plan includes critical technical data such as ground and invert levels for various connection points, supporting the project's Stage 3 development phase. The schematic ensures accurate site water management, incorporating both foul sewer connections and surface water drainage systems to align with the facility's overall site civil engineering requirements. The design serves as a foundational reference for drainage installation and compliance with university site standards.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/cism-proposed-drainage-general-arrangement/662887/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/cism-proposed-drainage-general-arrangement/662887.png","ImageObject",300,407,{"name":92,"@type":93},"mieayamfan","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of this document?","Question",{"text":112,"@type":113},"This document serves as the Stage 3 technical drawing for the Proposed Drainage General Arrangement of the University of Swansea CISM building.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Who is the consultant responsible for this drainage design?",{"text":117,"@type":113},"The design and planning for the drainage system are provided by the consultant firm AECOM.",{"name":119,"@type":110,"acceptedAnswer":120},"What specific infrastructure components are detailed in the layout?",{"text":121,"@type":113},"The drawing details proposed foul and storm drainage runs, manhole connections to existing networks, linear channels, and connection invert levels.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662887,1793223048,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},962090893677,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","Last saved by: ANGELA ESPOSITO(20 19-08- 16) Last Plotted: 20 19-08- 16 Project Management Initials: Designer: Checked: Approved: ISO A 1 594 mm x 841mm  \nnam: -Z UKI UK RI J B PR\\ \\ \\ O S\\ 08 11_SCAPE_CISM,_BAY_CAMPUS\\400_TECHNICAL\\434_CE\\DRAWINGS\\CURRENT\\60605215-ACM-A-XX-DR-CE-001 P0 1 . DWG  \n0  \n1:250  \n5 10 15 20  \n25m  \n# PROJECT\n\nUniversity of Swansea  \nCISM Building  \nUniversity of SwanseaFabian Way, SkewenSwansea, SA1 8EN  \n# CLIENT\n\nUniversity of Swansea  \nFabian Way, SkewenSwansea, SA1 8EN01792 205 678 telwww.swansea.ac.uk  \n# CONSULTANT\n\nAECOM  \nPortwall Place, Portwall LaneBristol, BS1 6NA  \n0117 901 7000 tel 0117 701 7099 faxwww.aecom.com  \n# NOTES\n\nPURPOSE OF ISSUE  \nStage 3 Issue  \n# ISSUE/REVISION\n\nP1 Stage 3 Issue AE DM  \nRev Date Detail Made Chk'd App'd  \n# PROJECT NUMBER\n\n60605215  \n# SHEET TITLE\n\nProposed DrainageGeneral Arrangement  \n# SHEET NUMBER REV.\n\n60605215-ACM-XX-DR-CE-0001 P01","cbCais05Tal7hLFm","https://ap.wps.com/l/cbCais05Tal7hLFm","pdf",1672799,"English","# Project Overview\n## Site Information and Client Details\n## Technical Design Specifications\n# Drainage Arrangement Details\n## Proposed Foul Drainage\n## Proposed Storm Drainage\n## Connection Points and Invert Levels","[{\"question\":\"What is the purpose of this document?\",\"answer\":\"This document serves as the Stage 3 technical drawing for the Proposed Drainage General Arrangement of the University of Swansea CISM building.\"},{\"question\":\"Who is the consultant responsible for this drainage design?\",\"answer\":\"The design and planning for the drainage system are provided by the consultant firm AECOM.\"},{\"question\":\"What specific infrastructure components are detailed in the layout?\",\"answer\":\"The drawing details proposed foul and storm drainage runs, manhole connections to existing networks, linear channels, and connection invert levels.\"}]","CISM - Proposed Drainage General Arrangement | PDF"]