[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650723-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-650723-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","chimney-details-typical-side-detail-110-construction-notes","Chimney Details - Typical Side Detail 1:10 - Construction Notes","","Chimney detailing for The Old Vicarage, Bicester, Oxfordshire, providing typical side and end gable section guidance at a scale of 1:10. Specifies new clay chimney pots compatible with flue works, new flaunching, an ashlar moulded cap and ashlar projecting cover moulding to approved samples, plus removal and replacement of existing brick chimney stacks above roofline with large finely jointed slabs. Includes demolition, construction and maintenance notes, and requires lead flashing and DPC installation per Lead Sheet Association details.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/chimney-details-typical-side-detail-110-construction-notes/650723/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/chimney-details-typical-side-detail-110-construction-notes/650723.png","ImageObject",300,407,{"name":42,"@type":43},"Rainbow Cat","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What new chimney components are specified for the flue works?","Question",{"text":62,"@type":63},"New clay chimney pot(s) are specified to be compatible with the flue works, along with new flaunching and an ashlar moulded cap.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How are existing chimney stacks treated above the roofline?",{"text":67,"@type":63},"Existing brick chimney stacks above the roofline are to be removed and replaced with new large, finely jointed slabs of ashlar stone, to an approved sample.",{"name":69,"@type":60,"acceptedAnswer":70},"Which installation requirements are referenced for weatherproofing?",{"text":71,"@type":63},"New lead flashing and DPC are to be installed in accordance with the Lead Sheet Association details.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},650723,1792840854,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":30},962090769181,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","| \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>C H I M N E Y O N T H E R I D G ET Y P I C A L S I D E D E T A I L 1 : 1 0 |  | \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>  New clay chimney pot(s) to be\u003Cbr>compatible with the flue works.\u003Cbr>\u003Cbr>New flaunching.\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>New ashlar moulded cap.\u003Cbr> Ashlar to approved sample.\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>To line through with construction below. Indicative only. TBC on site\u003Cbr>\u003Cbr>\u003Cbr>Chimney flues to line through with existing. TBC on site.\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Existing brick chimney stack above the roofline to be removed & replaced with new large, finely jointed, slabs of ashlar stone.\u003Cbr>Ashlar to approved sample.\u003Cbr>New ashlar projecting cover moulding. Ashlar to approved sample.\u003Cbr>To chimney above Bedroom 4 (CH05) only:\u003Cbr>End gable rubble stone wall to remaining exposed but brickwork below chimney to be replaced with ashlar stone to approved sample.\u003Cbr>To chimney above Study (CH01) only: End gable rubble stone wall to be rendered up to new ashlar projection cover moulding.\u003Cbr>New lead flashing and DPC installed in accordance with the Lead Sheet Association details.\u003Cbr>Roof line.\u003Cbr>To\u003Cbr>line through with construction below\u003Cbr>C H I M N E Y O N T H E E N D G A B L ET Y P I C A L F R O N T D E T A I L 1 : 1 0 | PLANNING NOTES\u003Cbr>-\u003Cbr>DEMOLITION NOTES\u003Cbr>-\u003Cbr>CONSTRUCTION NOTES\u003Cbr>-All dimensions must be checked on site and not scaled from this drawing\u003Cbr>MAINTENANCE NOTES\u003Cbr>- |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  | Revisions |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>To line through with construction below\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>New ashlar projecting cover moulding. Ashlar to approved sample.\u003Cbr>Existing brick chimney stack above to be removed & replaced with new jointed, slabs of ashlar stone. Ashlar to approved sample.\u003Cbr>the roofline large, finely\u003Cbr>New ashlar moulded cap. Ashlar to approved sample.\u003Cbr>New flaunching.\u003Cbr>New clay chimney pot(s) to be compatible with the flue works.\u003Cbr>Roof.\u003Cbr>New lead flashing and DPC installed in accordance with the Lead Sheet Association details.\u003Cbr>C H I M N E Y O N T H E R I D G E\u003Cbr>T Y P I C A L F R O N T D E T A I L 1 : 1 0 | \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>  New clay chimney pot(s) to be\u003Cbr>compatible with the flue works.\u003Cbr>\u003Cbr>New flaunching.\u003Cbr>\u003Cbr>  New ashlar moulded cap.\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Ashlar to approved sample.\u003Cbr>\u003Cbr>\u003Cbr>To line through with construction below\u003Cbr>\u003Cbr>To line through with construction below.\u003Cbr>\u003Cbr>Indicative only. TBC on site\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Existing brick chimney stack above the roofline to be removed & replaced with new large, finely jointed, slabs of ashlar stone.\u003Cbr>Ashlar to approved sample.\u003Cbr>New ashlar projecting cover moulding. Ashlar to approved sample.\u003Cbr>Roof.\u003Cbr>To chimney above Bedroom 4 (CH05) only:\u003Cbr>End gable rubble stone wall to remaining exposed but brickwork below chimney to be replaced with ashlar stone to approved sample.\u003Cbr>To chimney above Study (CH01) only: End gable rubble stone wall to be rendered up to new ashlar projection cover moulding.\u003Cbr>New lead flashing and DPC installed in accordance with the Lead Sheet Association details.\u003Cbr>C H I M N E Y O N T H E E N D G A B L ET Y P I C A L S I D E D E T A I L 1 : 1 0 |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  | |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  | THE OLD VICARAGE BICESTER OXFORDSHIRE\u003Cbr>CONSTRUCTION\u003Cbr>CHIMNEY DETAILS |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  | Scale: 1:10 |  |  | 19.1448/1030\u003Cbr>Revision |  |  |  |  |  |  |  |  |  |  |\n|  |  |  | Date: JULY 2020 |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| C Copyright\u003Cbr>|  |  | Drawn: DR |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  | Size: A1 |  |  |  |  |  |  |  |  |  |  |  |  |  |","cbCaisr7qhOTbxLn","https://ap.wps.com/l/cbCaisr7qhOTbxLn","pdf",185819,"English","# Planning Notes\n# Demolition Notes\n# Construction Notes\n# Maintenance Notes","[{\"question\":\"What new chimney components are specified for the flue works?\",\"answer\":\"New clay chimney pot(s) are specified to be compatible with the flue works, along with new flaunching and an ashlar moulded cap.\"},{\"question\":\"How are existing chimney stacks treated above the roofline?\",\"answer\":\"Existing brick chimney stacks above the roofline are to be removed and replaced with new large, finely jointed slabs of ashlar stone, to an approved sample.\"},{\"question\":\"Which installation requirements are referenced for weatherproofing?\",\"answer\":\"New lead flashing and DPC are to be installed in accordance with the Lead Sheet Association details.\"}]","Chimney Details - Typical Side Detail 1:10 - Construction Notes | PDF"]