[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-404367-105":59,"doc-detail-404367-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","childcare-plan-review-packet-2025","Childcare Plan Review Packet 2025","","Childcare Plan Review Packet 2025 provides required materials and facility/program information for licensing and safety review. It specifies submission of floor plans, site plans, and plumbing plans, including detailed locations for kitchen equipment, plumbing fixtures, handwashing sinks, diaper changing stations, and restroom mechanical fans. The packet also requests an equipment specification sheet with make and model numbers, a complete menu or a written letter if the kitchen will not be used, and applicable fee payment. Additional sections gather water supply, sewage disposal, bacteriological and nitrate sampling dates, outdoor equipment details, and building construction and operation data to confirm compliance with Wyoming Child Care Licensing Rules and local food safety requirements.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":20,"@type":76,"position":81},"https://docshare.wps.com/document/exam/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/childcare-plan-review-packet-2025/404367/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/childcare-plan-review-packet-2025/404367.png","ImageObject",300,407,{"name":92,"@type":93},"Nguyễn Văn Học","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-04","2026-09-27",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",12,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What items are required to complete the childcare plan review?","Question",{"text":113,"@type":114},"The packet requires floor plans, site plans, and any needed plumbing plan details, an equipment specification sheet (including make and model numbers), and a complete menu or a letter stating the kitchen will not be used. It also requires the completed packet with required attachments and payment of the fee.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What must be shown on the site plan and floor plan?",{"text":118,"@type":114},"The site plan must show building location and outside equipment locations such as playground and septic system. The floor plan must show kitchen equipment locations, plumbing, restroom mechanical fans, flooring, cubbies/cabinets, diaper changing stations, and applicable kitchen hood systems, plus child ages per classroom.",{"name":120,"@type":111,"acceptedAnswer":121},"How are water supply and sewage disposal handled in the packet?",{"text":122,"@type":114},"The packet asks to choose a water supply type (public or private well) and provides bacteriological sample dates every 6 months and nitrate sample dates every 3 years. It also requires selecting sewage disposal (public or onsite wastewater treatment system), including onsite evaluation by an engineer and attaching the required engineer letter if needed.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},404367,1791465315,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":19,"category_name":20,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":44,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":4},1374402739827,"https://ap-avatar.wpscdn.com/avatar/14000c97e7351f1a627?x-image-process=image/resize,m_fixed,w_180,h_180&k=1787885694763230660","Environmental Health  \n100 Central Ave Cheyenne, WY 82007 Phone:(307) 633-4090  \n[Email:](Email: envhlth@laramiecountywy.gov)[ ](Email: envhlth@laramiecountywy.gov)[envhlth@laramiecountywy.gov](Email: envhlth@laramiecountywy.gov)  \nChildcare Plan Review Packet  \nThe following are REQUIRED* to complete your review:  \n□ Floor plans, site plans, etc.:  \n• Site plan: Show location of building and location of any outside equipment (playground, sandbox, well, septic system, etc.) .  \n• Floor plan: Show location of kitchen equipment, all plumbing, mechanical fans in restrooms, flooring, cubbies and cabinets, diaper changing stations, and if applicable, kitchen hood systems, etc. For classrooms, include the age of children anticipated for each room.  \n• Plumbing plan (if not included in floor plan): Show location of floor sinks and floor drains, indirectly drained equipment, restrooms, toilets, urinals, all hand washing sinks and food prep sinks, and laundry facilities, etc.  \n□ Equipment Specification sheet for kitchen equipment and hot water heater(s): Sheet must include make and model numbers. Please note: If a specification sheet lists more than one piece of equipment, identify the specific equipment to be used.  \n□ A complete menu (with breakfast/lunch/snacks/etc.), if available:  \n• If the kitchen is not to be used, provide a letter stating that the kitchen will not be used, nor will any dishes be used that must be washed in an approved kitchen. The letter must state what typeof snacks and/or meals will be served to children and how they will be served (including washing and preparing fresh fruits and vegetables) .  \n□ Completed Plan Review Packet (below) including attachments where required.  \n□ Fee  \n*The plans will not be reviewed until the listed items are submitted.  \nX:envdata/shared/forms/2025planreviews/2025-Child-Care-Plan-Review 2/4/25  \nChildcare facilities must meet the requirements of the most current revision of the Wyoming Child Care Licensing Rules and the Cheyenne-Laramie County Food Safety Rule.  \nFACILITY INFORMATION (PLEASE PRINT):  \nName:   Physical address:   City:   Zip code:    \nPROGRAM INFORMATION:  \nName of childcare program if different than facility:   Typeof license issued by the Department of Family Services (DFS) (Select only one):  \n□ Child Care Center $250 ☐ Family Child Care Center $250 ☐ Family Child Care Home $0 Contact person: Title:    \nPhone:  Ext:   Email:    \nDirector of Program:   License number:  Number of children:   Number of employees:  Number of classrooms:   \nCheck the boxes that include any ages you serve:  \n□ Infants (0– 12 months) ☐ Toddlers (1-2 years) ☐ Preschool (3-4 years)  \n□ School Age (5-14 years)  \nWhat days of the week do you operate?   What months do you operate?   Hours of operation:   Which School District’s calendar do you follow for closures and holidays?    \nOWNER MAILING INFORMATION:  \nOwner Type: ☐ Individual ☐ Owner/Operator ☐ Partnership ☐ Corporation ☐ Non-profit Owner Name:    \nMailing Address:   City:   Zip:   Phone:  Email:    \nA. Building Information  \nConstruction start date:  Date of planned opening:    \n□ New Construction ☐ Remodel  \n*Submit plan review packet at least 30 days prior to construction start date.  \nHave plans for this facility been submitted to the local building department? ☐Yes ☐ No  \nBuilding Department Plan Number:    \nOriginal year of construction*:    \n*Renovation activities that will disturb painted surfaces in buildings built before 1978 must be conducted pursuant to the U.S. Environmental Protection Agency Lead Renovation, Repair and Painting Program regulations, unless a lead-based determination shows that the surface does not contain lead-based paint. Determinations shall be made by a certified industrial hygienist.  \nB. Water Supply, Sewage Disposal, Drinking Water  \nWater supply (Choose one):  \n□ Public–Name:    \n□ Private Well  \nBacteriological Sample Date (required every 6 months):   Nitrate Sample Date (required every 3 ye","cbCaiqspMHr31VB1","https://ap.wps.com/l/cbCaiqspMHr31VB1","pdf",385311,"English","# Required Submission Checklist\n## Site plan, floor plan, and plumbing plan\n## Equipment specification sheet and kitchen/hot water details\n## Menu requirement or kitchen-not-used letter\n## Completed packet and fee\n# Facility and Program Information\n## License, staff, children, and operating schedule\n## Owner mailing information\n# Building and Water/Sewage Sections\n## Construction dates and building department plan number\n## Water supply, bacteriological/nitrate sampling, sewage disposal\n# Property Site Plan and Outdoor Equipment\n## Required outdoor items and sandbox cover\n# Floor Plan/Layout Details\n## Kitchen, plumbing, diaper changing, and related areas","[{\"question\":\"What items are required to complete the childcare plan review?\",\"answer\":\"The packet requires floor plans, site plans, and any needed plumbing plan details, an equipment specification sheet (including make and model numbers), and a complete menu or a letter stating the kitchen will not be used. It also requires the completed packet with required attachments and payment of the fee.\"},{\"question\":\"What must be shown on the site plan and floor plan?\",\"answer\":\"The site plan must show building location and outside equipment locations such as playground and septic system. The floor plan must show kitchen equipment locations, plumbing, restroom mechanical fans, flooring, cubbies/cabinets, diaper changing stations, and applicable kitchen hood systems, plus child ages per classroom.\"},{\"question\":\"How are water supply and sewage disposal handled in the packet?\",\"answer\":\"The packet asks to choose a water supply type (public or private well) and provides bacteriological sample dates every 6 months and nitrate sample dates every 3 years. It also requires selecting sewage disposal (public or onsite wastewater treatment system), including onsite evaluation by an engineer and attaching the required engineer letter if needed.\"}]","Childcare Plan Review Packet 2025 | PDF",1790547408,23]