[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664064-105":59,"doc-detail-664064-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","checklist-for-all-building-permit-applications","Checklist for all Building Permit Applications","","Checklist outlining required documents and drawings for a complete Ontario building permit application. Covers the need for the complete Ontario Application Form and schedules, two sets of scaled and legible drawings, and returning the checklist with required boxes checked. Details additional submission requirements for new buildings, additions, renovations, and specific permit types such as change in use and plumbing, and provides guidance for required site plan, floor plan, foundation plans, framing plans, roof plans, sections and details, building elevations, and electrical services.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/checklist-for-all-building-permit-applications/664064/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/checklist-for-all-building-permit-applications/664064.png","ImageObject",300,407,{"name":92,"@type":93},"Putri","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What must be included to submit a complete Ontario building permit application?","Question",{"text":112,"@type":113},"Include the complete Ontario Application Form with all applicable schedules, two sets of all submitted drawings and plans (legible and to scale), and return the checklist with the appropriate boxes checked next to the drawings submitted.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What extra guidance is provided for required drawings and plans?",{"text":117,"@type":113},"Use the attached Schedule 1 as a guideline for required drawings and plans. Certain drawings may be combined as long as all necessary design information is provided, including plumbing, mechanical, wood trusses, and electrical services.",{"name":119,"@type":110,"acceptedAnswer":120},"What are key elements that should appear in a required site plan?",{"text":121,"@type":113},"The site plan should show the location of all existing and proposed buildings, fire department access route locations and design, setbacks to lot lines, drainage patterns, proposed storm water disposal means, distances from above-ground electrical conductors, property boundaries and easements, and sewage system location.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664064,1793238208,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":52},962085571259,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","JOINT BUILDING COMMITTEE Serving the municipalities of Burk’s Falls, Joly, Machar, Ryerson, South River, Strong, Sundridge and Magnetawan.  \nCHECKLIST FOR ALL  \nBUILDING PERMIT APPLICATIONS  \nThe following are required to be submitted as a complete application. If all the appropriate information is not provided then the application will be returned as incomplete.  \n1. The complete Ontario Application Form and all applicable schedules.  \n2. Two sets of all submitted drawings and plans. All drawings must be legible and to scale.  \n3. Return this checklist with the appropriate boxes checked next to the drawings etc. that you have submitted.  \n4. For Change in Use, Plumbing or other permits not listed below contact the Building Department.  \nNew Buildings, Additions and Renovations: also include items from: 1 2 3  \nRefer to attachment Schedule 1 as a guideline for required drawings and plans. It may be possible to combine certain drawings with others, as long as all necessary design information is provided (example; plumbing, mechanical, wood trusses and electrical services) .  \nSite Plan Building Elevations Floor Plan Foundation Plan  \nFraming Plan Roof Plan Heating Ventilation Air-Conditioning Plan  \nElectrical Services Plan Plumbing Plan Section & Detail Plans  \nDeck Attached or Unattached to a structure: also include items from above; 1 2 3  \nSite Plan: Detailed legible plan showing all existing and proposed buildings and their  \nsq.ft. (sq.m), and location to lot lines, septic systems, water and shore road allowances or crown reserve.  \nFoundation, Piers, Floor and Section Plans: Drawings that show size and spacing or piers or  \nFoundation, beams, joists, decking and  \nrailing/guard details.  \nDock: also include items from above; 1 2 3  \nSite Plan: Show location and dimensions of all existing docks, boathouses and proposed docks.  \nInclude all setbacks to lot lines and distances from all shorelines.  \nRequired Drawings and Plans  \nThe following list of drawings should be used as a guide when preparing drawings for submission for a building permit for a project under Part 9 of the Ontario Building Code, which does not require professional design. Any project that requires design by an Architect and/or Professional Engineer (Part 3 Buildings, such as assembly occupancy, institutional or large buildings over 600 sq.m. and multiple dwellings) will require more comprehensive drawings with a professional’s seal and a signed Commitment to General review and Design form filled out by all providing design.  \nThe Designer that prepares the permit drawings must provide sufficient information to ensure compliance with the requirements of the Ontario Building Code.  \nAs of January 1, 2005, designers will be required to show proof of meeting the qualifications and registration required by the Ministry of Municipal affairs and Housing.  \n1. Site Plan:  \n􀂾 The location of all existing and proposed buildings. Location and design of Fire Department Access Routes.  \n􀂾 The setbacks to lot lines must be clearly shown.  \n􀂾 The existing and proposed drainage patterns should be illustrated,(provide geodetic elevation if in a flood plain, or plan of subdivision) .  \n􀂾 The proposed means of storm water disposal (from foundation drains and rainwater leaders) must be illustrated.  \n􀂾 Must show distance from any existing above ground electrical conductors.  \nThe plan must be to scale and show all property boundaries , easements, right of ways, adjacent road and water bodies. The location of sewage systems should be added to the site plan. A copy of the Deed is required if the site plan has not been prepared by an Ontario Land Surveyor.  \n2. Floor Plan:  \n􀂾 All rooms must be labeled to illustrate their intended use.  \n􀂾 The location of doors, windows, plumbing fixtures and stairs must be shown.  \n􀂾 Structural information for the roof or floor above may be illustrated on the floor plans for simple projects, as well as mechanical and electrical information.","cbCaitnM6syOLWnH","https://ap.wps.com/l/cbCaitnM6syOLWnH","pdf",97618,"English","# Required Application Components\n# New Buildings, Additions and Renovations\n# Decks (Attached or Unattached)\n# Docks\n# Required Drawings and Plans (Part 9 projects)\n## Site Plan\n## Floor Plan\n## Foundation Plans\n## Framing Plans\n## Roof Plans\n## Sections and Detail\n## Building Elevations\n## Electrical Services","[{\"question\":\"What must be included to submit a complete Ontario building permit application?\",\"answer\":\"Include the complete Ontario Application Form with all applicable schedules, two sets of all submitted drawings and plans (legible and to scale), and return the checklist with the appropriate boxes checked next to the drawings submitted.\"},{\"question\":\"What extra guidance is provided for required drawings and plans?\",\"answer\":\"Use the attached Schedule 1 as a guideline for required drawings and plans. Certain drawings may be combined as long as all necessary design information is provided, including plumbing, mechanical, wood trusses, and electrical services.\"},{\"question\":\"What are key elements that should appear in a required site plan?\",\"answer\":\"The site plan should show the location of all existing and proposed buildings, fire department access route locations and design, setbacks to lot lines, drainage patterns, proposed storm water disposal means, distances from above-ground electrical conductors, property boundaries and easements, and sewage system location.\"}]","Checklist for all Building Permit Applications | PDF"]