[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-515994-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-515994-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","chapter-8-wastewater-treatment-plant-construction-main-volume-2-chapter-8","Chapter 8 - Wastewater Treatment Plant Construction - Main : Volume 2 - Chapter 8","","Detailed design for Phase I of a wastewater treatment plant is presented for the HCMC Water Environment Improvement Project final report (Main: Volume 2). The plant is planned in Binh Hung Ward, Binh Chang District, with the site divided by existing high-voltage power cables and weak soil requiring careful bearing-capacity design. The scope covers wastewater and sludge facilities, mechanical and electrical systems, and supporting site works. Modified aeration is adopted to meet effluent limits of BOD and SS, with design standards and performance targets provided for each treatment unit.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/chapter-8-wastewater-treatment-plant-construction-main-volume-2-chapter-8/515994/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/chapter-8-wastewater-treatment-plant-construction-main-volume-2-chapter-8/515994.png","ImageObject",300,407,{"name":42,"@type":43},"Melati","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-22","2026-10-06",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",15,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"Where is the Phase I wastewater treatment plant proposed to be constructed?","Question",{"text":63,"@type":64},"It is proposed to be constructed in Binh Hung Ward, Binh Chang District. The area is enclosed by Tac Ben Ro river, Xom Cui canal, and a small canal.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What wastewater process is adopted for Phase I and why?",{"text":68,"@type":64},"A modified aeration process is adopted to meet required effluent water quality, based on experimental results. It is similar to conventional activated sludge and can be shifted to it in the final phase.",{"name":70,"@type":61,"acceptedAnswer":71},"What are the Phase I design flow and key effluent requirements?",{"text":72,"@type":64},"The design flow is 141,000 m3/day. The effluent quality targets are BOD ≤ 50 mg/l and SS ≤ 100 mg/l.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},515994,1791434371,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":140,"language":141,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":12,"update_tm":145,"read_time":146,"preview_page_count":147,"preview_urls":148},962085570644,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Chapter 8  \nWASTEWATER TREATMENT PLANT CONSTRUCTION  \n(PACKAGE E)  \nThe Detailed Design Study on HCMC Water Environment Improvement Project Final Report  \n   Main : Volume 2  \nCHAPTER 8 WASTEWATER TREATMENT PLANT CONSTRUCTION  \n(PACKAGE E)  \n8.1 General  \nThis chapter treats the detailed design of wastewater treatment plant for Phase I. Wastewater treatment plant is proposed to construct in Binh Hung Ward in Binh Chang District. The isolated area is enclosed by Tac Ben Ro river, Xom Cui canal and one small canal. And the area is divided into two (2) parts by high voltage power supply cable crossing at the center of area from east to west. The soil condition of this area is very weak and special attention to bearing capacity of soil for detailed design of the structures. General layout of THBNDT WWTP is shown in Fig. 8.1 and 8.2.  \n8.2 Scope of the Project  \nScope of the project makes the detailed design on wastewater treatment plant with a capacity of 141,000 m3/day.  \nThe following main facilities are designed;  \nWastewater treatment facility  \nInlet pumping station, Distribution tank, Primary sedimentation tank, Aeration tank, Final sedimentation tank, and Disinfection tank.  \nSludge treatment facility  \nSludge thickening, Dewatering, and Composting plant  \nMechanical design  \nAll required mechanical equipment for wastewater and sludge treatment facilities  \nElectrical design  \nAll required power supply and control system for wastewater and sludge treatment facilities  \nOther facility  \nPiping system, Production of water using for treatment plant, Pile foundation, Access road and bridge, Site preparation and Supplementary soil improvement  \n8.3 Wastewater Treatment Plant  \n8.3.1 Treatment System  \nThe Detailed Design Study on HCMC Water Environment Improvement Project Final Report  \n   Main : Volume 2  \nTo meet the required effluent water quality in Phase I, modified aeration process is adopted from the following reasons;  \n• Based on the results of the wastewater treatment experimental works, modified aeration system can achieve the required effluent water quality,  \n• Modified aeration system is similar to conventional activated sludge system and  \n• Modified aeration system can be easily sifted to conventional activated sludge system in the Final Phase  \nWhile sludge treatment system in Phase I, same sludge treatment system as Final Phase is adopted.  \nRequirement for Phase I is as follows:  \nDesign flow: 141,000 m3/d  \nInflow: BOD = 165 mg/l  \nSS = 165 mg/l  \nEffluent quality: BOD ≤ 50 mg/l  \nSS ≤ 100 mg/l  \nProcess: Modified aeration process (HRT at aeration tank at least 2hr)  \nFlow and mass balance of wastewater and sludge treatment process in Phase I are shown in Fig.8.3 and 8.7.  \n8.3.2 Design Standards  \nDesign criteria of modified aeration system are determined based on the results of wastewater treatment experimental works as mentioned in previous Chapter 18 in Vol. I.  \nPrimary Sedimentation Tank  \n\n| Item | Standards |\n| --- | --- |\n| Surface loading (m3/m2/d) | About 100 |\n| Effective water depth (m) | 3.0 |\n| Effluent weir loading (m3/m/d) | About 500 |\n\nAeration Tank  \n\n| Item | Standards |\n| --- | --- |\n\nThe Detailed Design Study on HCMC Water Environment Improvement Project Final Report  \n   Main : Volume 2  \n\n| HRT (hr) | 1.5 – 2.5 |\n| --- | --- |\n| MLSS (mg/l) | 400 – 800 |\n| Return sludge ratio (%) | 5 – 10 |\n| Effective water depth (m) | 5.5 |\n| Concentration of return sludge (mg/l) | 3,000 – 6,000 |\n| BOD – SS Loading (kg-BOD/kg-SS/day) | About 4.0 |\n\nFinal Sedimentation Tank  \n\n| Item | Standards |\n| --- | --- |\n| Surface loading (m3/m2/d) | About 60 |\n| Effective water depth (m) | 3.5 |\n| Effluent weir loading (m3/m/d) | About 240 |\n| Capacity of Sludge Hopper (min.) | 30 |\n\nDisinfection Tank  \n\n| Item | Standards |\n| --- | --- |\n| HRT (min) | > 15 |\n\n8.3.3 Design Influent Quality and Removal Efficiency of WWTP  \nInfluent wastewater quality of BOD and SS to WWTP are estimated as follows;  \nBOD = 55g","cbCaiabAwnBBMhmS","https://ap.wps.com/l/cbCaiabAwnBBMhmS","pdf",3956093,270,"English","# Chapter 8 Wastewater Treatment Plant Construction\n## 8.1 General\n## 8.2 Scope of the Project\n## 8.3 Wastewater Treatment Plant\n### 8.3.1 Treatment System\n### 8.3.2 Design Standards\n### 8.3.3 Design Influent Quality and Removal Efficiency of WWTP\n### 8.3.4 Required Number of Train of Wastewater Treatment in Phase I","[{\"question\":\"Where is the Phase I wastewater treatment plant proposed to be constructed?\",\"answer\":\"It is proposed to be constructed in Binh Hung Ward, Binh Chang District. The area is enclosed by Tac Ben Ro river, Xom Cui canal, and a small canal.\"},{\"question\":\"What wastewater process is adopted for Phase I and why?\",\"answer\":\"A modified aeration process is adopted to meet required effluent water quality, based on experimental results. It is similar to conventional activated sludge and can be shifted to it in the final phase.\"},{\"question\":\"What are the Phase I design flow and key effluent requirements?\",\"answer\":\"The design flow is 141,000 m3/day. The effluent quality targets are BOD ≤ 50 mg/l and SS ≤ 100 mg/l.\"}]","Chapter 8 - Wastewater Treatment Plant Construction - Main : Volume 2 - Chapter 8 | PDF",1791324246,680,27,[149,153,157,161,165,169,173,177,181,185,189,194,199,204,209,213,218,223,228,232,236,241,246,251,256,261,266],{"page_no":22,"url":150,"width":151,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/080777075dd224deb84a5307e5ddebe4.webp",983,1390,{"page_no":26,"url":154,"width":155,"height":156},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/8207dcf940659e21bf510afde7ac0470.webp",982,1389,{"page_no":30,"url":158,"width":159,"height":160},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/7714a41ffa46081e7f3cbe3eb84b1c95.webp",981,1387,{"page_no":33,"url":162,"width":163,"height":164},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/bb7da98e17ba07010c90d0138fbecaf7.webp",980,1386,{"page_no":97,"url":166,"width":167,"height":168},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/dca8df934e6a74808a6381e4e7981199.webp",979,1385,{"page_no":102,"url":170,"width":171,"height":172},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/9c6f762d890de29a952da1f97b982736.webp",978,1383,{"page_no":107,"url":174,"width":175,"height":176},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/53ccc1765c1de8d49916620e69924f6a.webp",977,1382,{"page_no":112,"url":178,"width":179,"height":180},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/004c69f161d275bf3863a8a1bd842bbc.webp",976,1380,{"page_no":116,"url":182,"width":183,"height":184},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/2407effcf9d83d6ca15f1a5f496140ce.webp",975,1379,{"page_no":124,"url":186,"width":187,"height":188},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/bb5a44bd93503d0a19d010c7fb5fdd37.webp",974,1378,{"page_no":190,"url":191,"width":192,"height":193},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/31ae433cc03964aeffc7ae8018cc2a98.webp",973,1376,{"page_no":195,"url":196,"width":197,"height":198},12,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/32680e94db0987405648a9d0e44a572c.webp",972,1375,{"page_no":200,"url":201,"width":202,"height":203},13,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/0abc0575423ac0851a459df70e04ea63.webp",971,1373,{"page_no":205,"url":206,"width":207,"height":208},14,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/618f213c32cd828f09a749d3ba2e19cc.webp",970,1372,{"page_no":55,"url":210,"width":211,"height":212},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d423345ceb915370f07aff947c4649ab.webp",969,1370,{"page_no":214,"url":215,"width":216,"height":217},16,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/3e487e63ebd2c41c1d2e172f9b6b56e0.webp",968,1369,{"page_no":219,"url":220,"width":221,"height":222},17,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/f2d55d001b10d007a1523c8f8c191ed6.webp",967,1368,{"page_no":224,"url":225,"width":226,"height":227},18,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/be2e6cde07f1adeb82c9846c6a7357d3.webp",966,1366,{"page_no":128,"url":229,"width":230,"height":231},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/6ff55ee8e34ee829b0aa5e51705e57ed.webp",965,1365,{"page_no":118,"url":233,"width":234,"height":235},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a18c33210b3680b97bb3ce23003c5a78.webp",964,1363,{"page_no":237,"url":238,"width":239,"height":240},21,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/5c73989241aef277cd618e84ce797fcb.webp",963,1362,{"page_no":242,"url":243,"width":244,"height":245},22,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/8a909c859ee58f8788ce27d48281c459.webp",962,1361,{"page_no":247,"url":248,"width":249,"height":250},23,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/4fe69b60390e4c7513231f0616c22455.webp",961,1359,{"page_no":252,"url":253,"width":254,"height":255},24,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/4c514ab86ff9936647d53dcefbdb92a4.webp",960,1358,{"page_no":257,"url":258,"width":259,"height":260},25,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/cc8e7ae190b43a7804566c0d716a49f8.webp",959,1356,{"page_no":262,"url":263,"width":264,"height":265},26,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/dc200d5b0c60927f65a9704f10d99133.webp",958,1355,{"page_no":147,"url":267,"width":268,"height":269},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/ac8223065711e56316759cbbad54801c.webp",957,1354]