[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-649620-105":3,"doc-detail-649620-en":80,"detail-sidebar-cat-0-en-105":98},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","cf-toronto-eaton-centre-office-properties-design-and-construction-manual","CF Toronto Eaton Centre - Office Properties - Design and Construction Manual","","CF Toronto Eaton Centre office properties design and construction manual provides a practical leasehold-improvement guide covering how tenants and contractors prepare, submit, review, and execute tenant improvement work within the TEC complex. It outlines management contacts, landlord base building consultant support, required tenant improvement documentation, and detailed construction and security procedures. Guidance includes contractor regulations, safety and health requirements, site access rules, life-safety system expectations, commissioning, waste management, and closeout deliverables, with lease precedence emphasized.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/cf-toronto-eaton-centre-office-properties-design-and-construction-manual/649620/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/cf-toronto-eaton-centre-office-properties-design-and-construction-manual/649620.png","ImageObject",300,407,{"name":42,"@type":43},"Dipper","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of the TEC design and construction manual?","Question",{"text":62,"@type":63},"The manual serves as a guide for leasehold improvements, helping tenants and contractors understand TEC features, facilities, operating procedures, and expectations for executing work while following lease terms.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How are tenant improvement drawings and documentation handled?",{"text":67,"@type":63},"It provides structured requirements for tenant improvement documentation, including drawings submission and review, and specifies categories of construction details and system-related drawings that must be prepared.",{"name":69,"@type":60,"acceptedAnswer":70},"What safety, security, and life-safety requirements are covered?",{"text":71,"@type":63},"The manual includes contractor work regulations, health and safety requirements, WSIB and WHMIS guidance, emergency contact expectations, and procedures covering fire and life safety standards, detectors, sprinklers, standpipes, and related systems.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},649620,1793006944,{"code":4,"msg":81,"data":82},"success",{"doc_id":78,"user_id":83,"nickname":42,"user_avatar":84,"doc_module":4,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":86,"file_id":87,"file_url":88,"file_type":89,"file_size":90,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":91,"language":92,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":93,"faqs":94,"seo_title":95,"seo_description":12,"update_tm":96,"read_time":97},1374404997633,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd",6,"Design and Construction Manual  \nOffice  \nTORONTO EATON CENTRE  \nA  PROPERTY  \nProperties  \nTable of Contents  \nIntroduction 5  \nWelcome to CF Toronto Eaton Centre, Office Properties 6  \nAbout CF Toronto Eaton Centre 6  \nCF Toronto Eaton Centre Accessibility 7  \nCF Toronto Eaton Centre Facts 7  \nCADILLAC FAIRVIEW TOWER-A CF Property-Address: 20 Queen Street West 8  \n250 YONGE-A CF Property-Address: 250 Yonge Street 8 BMO PLACE-A CF Property-Address: 33 Dundas Street West 9  \n1 DUNDAS WEST-A CF Property-Address: 1 Dundas Street West 9 THE GALLERIA-A CF Property-Address: 220 Yonge Street 10  \n2 QUEEN WEST-A CF Property-Address 2 Queen West 10  \nPurpose: A Guide for Leasehold Improvements 11  \nMaintaining the Integrity of the TEC 11  \nContents to be read in conjunction with lease documentation 11  \nQuestions 11  \n1.0 Management Team and Contact Numbers 12  \n1.1 Landlord’s Base Building Consultants 14  \n2.0 Tenant Improvement Documentation 17  \n2.2 Drawings Submission & Review 18  \n2.3 Construction Details 20  \n2.4 Mechanical, Sprinkler, Electrical, Building-Automation, Security System,  \nLife-Safety System and Fire Alarm Drawings 20  \n2.5 Structural 20  \n2.6 Hardware Schedule 21  \n2.7 Washroom Fixtures, Finishes and Accessories 21  \n3.0 Project Documents 21  \n3.1 Start-Up Documents 21  \n3.2 During Construction 22  \n3.3 Closeout Documents 22  \n4.0 Contractor Work Regulations 23  \n4.1 Appointment of the Contractor 23  \n4.2 Insurance Certificates 23  \n4.3 Permits 23  \n4.4 Health and Safety Requirements 24  \n4.5 WSIB (Workplace Safety & Insurance Board) 25  \n4.6 List of Subcontractors (Union Affiliation) 25  \n4.7 Construction Deposit 26  \n4.8 WHMIS Regulation 26  \n4.9 Commissioning 26  \n4.10 Emergency Contact 26  \n4.11 Construction Waste Management 26  \n4.12 Asbestos Containing Materials (ACMs) / Working with Hazardous Materials 27  \n5.0 Security 28  \n5.1 Occupied Areas 28  \n5.2 Key Control 28  \n5.3 Identification Badges 28  \n5.4 CCTV 28  \n6.0 Site Conditions 29  \n6.1 Working Hours 29  \n6.2 Noise Disturbance – Sensitive Work 29  \n6.3 Construction Odours 29  \n6.4 Temporary Services 29  \n6.5 Work Site Protection 30  \n6.6 Base Building Finishes 30  \n6.7 First Aid Requirements 30  \n6.8 Chargebacks 30  \n7.0 Site Access Regulations 31  \n7.1 Shipping & Receiving 31  \n7.2 Freight Elevator / Escalators 31  \n7.3 Parking 32  \n7.4 Waste Material Diversion & Tracking 32  \n7.5 Recycling And Waste Removal 33  \n8.0 Construction Site Rules 33  \n8.1 Drilling Or Cutting Work 33  \n8.2 Electrical Power Shutdowns 34  \n8.3 Air System Shutdowns / Flush / After-Hours 34  \n8.4 Water System Shutdowns 34  \n8.5 Demolition 35  \n8.6 Plumbing, System Flush & Eddy Leak Detection 35  \n8.7 Carpet Laying 36  \n8.8 Access Panels 36  \n8.9 Elevator / Escalator Work 36  \n8.10 Public Restrooms 36  \n8.11 Tool Loan 36  \n8.12 Sign Posting 37  \n8.13 Site Cleanliness 37  \n9.0 Building Security & Life Safety Systems 37  \n9.1 Upgrades/Revisions To Life Safety Systems 37  \n9.2 Temporary Fire-Protection Devices 38  \n9.3 Voice-Communication Systems 38  \n9.4 Electromagnetic Locking Devices 38  \n9.5 Fireproofing Material 38  \n9.6 Base Building Access Control Management Service (ACMS) 38  \n3  \n10.0 Life Safety & Security Procedures 40  \n10.1 Fire And Life Safety Standards 40  \n10.2 Heat Detectors & Smoke Detection Systems 40  \n10.3 Sprinklers 41  \n10.4 Fire Standpipes 42  \n10.5 Pull Stations 42  \n10.6 Tie-Ins 43  \n10.7 Speaker & Fire Phone Zones 43  \n10.8 Open Flame Or Cutting Work 43  \n10.9 Smudging 44  \n10.10 Emergency Power 46  \n11.0 Safety & Security Procedure Checklist 46  \n12.0 Fines and Services Pricing 50  \n12.1 Safety Violations 50  \n12.2 Security Violations 51  \n12.3 Toronto Eaton Centre Services 51  \n13.0 Base Building Standards 52  \n13.1 Ceilings 52  \n13.2 Base Building Doors and Frames 53  \n13.3 Tenant Doors and Hardware 53  \n13.4 Demising Walls 53  \n13.5 Window Blinds 53  \n13.6 Signage 54  \n13.7 HVAC (Ducting, Supplemental Units, Perimeter Convectors) 54  \n14.0 Mechanical S","cbCaifXE7oOnYXFx","https://ap.wps.com/l/cbCaifXE7oOnYXFx","pdf",3553556,63,"English","# Introduction\n## Welcome to CF Toronto Eaton Centre, Office Properties\n## About CF Toronto Eaton Centre\n## CADILLAC FAIRVIEW TOWER - A CF Property\n## 250 YONGE - A CF Property\n## BMO PLACE - A CF Property\n## Purpose: A Guide for Leasehold Improvements\n# Management and Documentation\n## Management Team and Contact Numbers\n## Tenant Improvement Documentation\n## Project Documents\n# Contractor and Site Requirements\n## Contractor Work Regulations\n## Security\n## Site Conditions\n## Site Access Regulations\n## Construction Site Rules\n# Building Systems and Procedures\n## Building Security & Life Safety Systems\n## Life Safety & Security Procedures\n## Safety & Security Procedure Checklist\n## Fines and Services Pricing","[{\"question\":\"What is the purpose of the TEC design and construction manual?\",\"answer\":\"The manual serves as a guide for leasehold improvements, helping tenants and contractors understand TEC features, facilities, operating procedures, and expectations for executing work while following lease terms.\"},{\"question\":\"How are tenant improvement drawings and documentation handled?\",\"answer\":\"It provides structured requirements for tenant improvement documentation, including drawings submission and review, and specifies categories of construction details and system-related drawings that must be prepared.\"},{\"question\":\"What safety, security, and life-safety requirements are covered?\",\"answer\":\"The manual includes contractor work regulations, health and safety requirements, WSIB and WHMIS guidance, emergency contact expectations, and procedures covering fire and life safety standards, detectors, sprinklers, standpipes, and related systems.\"}]","CF Toronto Eaton Centre - Office Properties - Design and Construction Manual | PDF",1792802961,159,{"code":4,"msg":81,"data":99},[100,104,108,112,117,120,125,130,135,138,142],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},"Exam",70,"exam",{"id":113,"doc_module":4,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},5,"Comic",60,"comic",{"id":85,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":118,"slug":119},50,"technology",{"id":121,"doc_module":4,"doc_module_name":25,"category_name":122,"show_sort_weight":123,"slug":124},7,"Healthcare",40,"healthcare",{"id":126,"doc_module":4,"doc_module_name":25,"category_name":127,"show_sort_weight":128,"slug":129},8,"Research & Report",30,"research-report",{"id":131,"doc_module":4,"doc_module_name":25,"category_name":132,"show_sort_weight":133,"slug":134},9,"Religion & Spirituality",20,"religion-spirituality",{"id":133,"doc_module":4,"doc_module_name":25,"category_name":136,"show_sort_weight":133,"slug":137},"World Cup","world-cup",{"id":139,"doc_module":4,"doc_module_name":25,"category_name":140,"show_sort_weight":139,"slug":141},10,"Lifestyle","lifestyle",{"id":143,"doc_module":4,"doc_module_name":25,"category_name":144,"show_sort_weight":113,"slug":145},19,"General","general"]