[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-403979-105":59,"doc-detail-403979-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","campus-painting-recommendation-and-bid-scope-of-work","Campus Painting - Recommendation and Bid Scope of Work","","Campus Painting bid materials for Bondurant Farrar School District summarize proposed painting work across multiple school locations and summer projects. The content outlines bid offers, budget impact of $87,685.00, and detailed scope items including preparation and painting of hollow metal doors and frames, office wall spot priming and painting, stair wall painting labor, auditorium floor refinishing to existing color and sheen, and locker room ceiling and CMU wall painting. Exclusions clarify trash disposal by the general contractor and restrictions on overtime/weekend work and interior considerations.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/campus-painting-recommendation-and-bid-scope-of-work/403979/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/campus-painting-recommendation-and-bid-scope-of-work/403979.png","ImageObject",300,407,{"name":92,"@type":93},"Aran","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-28","2026-09-27",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What project is being bid in these documents?","Question",{"text":112,"@type":113},"The documents cover campus painting work for Bondurant Farrar School District, referenced as Campus Painting and multiple BF school summer projects.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What does the scope of work include?",{"text":117,"@type":113},"The scope includes preparation and painting of hollow metal doors and frames, spot prime and paint selected interior/exterior wall areas, painting stair walls, refinishing an auditorium floor to existing color and sheen, and painting locker room ceilings and CMU walls.",{"name":119,"@type":110,"acceptedAnswer":120},"What exclusions and clarifications are stated in the bid?",{"text":121,"@type":113},"Trash disposal is handled via a dumpster supplied by the general contractor, no overtime or weekend work is included in the base bid, work is limited to regular business hours (7AM to 3:30PM, Monday through Friday), and painting is restricted to specified sides/areas such as the exterior side of HM doors and frames.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},403979,1790946560,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":19,"preview_urls":146},137455076865,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","# Agenda Item\n\nTo:  Rich Powers,Superintendent,Chad Carslon,Cari Alyworth,Board of Directors  \nFrom:David Walker,Director of Nutrition and Custodial Services  \nDate:5/16/23  \nRe:Campus Painting  \nSummary  \nBid from Rowe and Baker Painting for multiple projects at Schools including High School,Junior High,Intermediate and Anderson..Rowe and Baker has our current painting bid..  \nBudget Impact  \n$87,685.00  \nRowe and Baker  \n# Attachments\n\nProposals  \nRecommendation  \nApprove Bid  \n2350 Hubbell Ave  \nDes Moines,IA 50317  \nBondurant Farrar School District  \nMay 11,2023  \nRe:BF High School Projects Summer 23'Budgets  \nAttn:Dave Walker  \nThis letter serves as a summary of the scope of work we are bidding on the above referenced project;  \n# Scope of Work:\n\n·  Prep and paint(25)hollow metal doors  \n·Prep and paint(17)3070 hollow metal frames  \n·  Prep and paint (6)6070 hollow metal frames  \nBudget Pricing:$3,855.00  \nOption\\#1:If additional HM doors or frames need included-ADD $75.00 per  \n## Exclusions/Clarifications:\n\n·All trash to be disposed in dumpster supplied by general contractor.  \n·No overtime or weekend work included in base bid.  \n·Work is bid to be performed during regular business hours.7AM to 3:30PM Monday through Friday  \n·Painting only considered on exterior side of HM doors and frames.  \nThank you for the opportunity to bid on this project.If you have any questions after your review,please give me a call.Sincerely,  \nJason Rowe  \n515-443-0215  \n2350 Hubbell AveDes Moines,IA 50317  \nBondurant Farrar School District  \nMay 16,2023  \nAttn:Dave Walker  \nRe:BF High School;Interior Summer Projects 23'  \nThis letter serves as a summary of the scope of work we are bidding on the above referenced project;  \n## Scope of Work;Office Area:\n\n·Prep,spot prime and paint existing office walls  \n·  Prep and paint hollow metal door and window framesBudget Pricing:$10,750.00  \n## Scope of Work;Main Stair Wall:\n\nBudget Pricing:$1,425.00  \n·Provide labor,equipment and material to paint existing stairway wall  \n## Scope of Work;Auditorium Floor:\n\n·Prep,spot prime and paint wood floor back to existing color and sheen  \nBudget Pricing:$2,840.00  \n## Scope of Work;Locker Rooms at Stadium:\n\n·Prep,spot prime and paint existing gypsum ceilings and CMU walls  \n·  Prep and paint hollow metal doors,frames and window frames  \nBudget Pricing:$10,840.00  \n## Exclusions/Clarifications:\n\n·All trash to be disposed in dumpster supplied by general contractor.  \n·  No overtime or weekend work included in base bid  \n·Work is bid to be performed during regular business hours.7AM to 3:30PM Monday through Friday.  \n● No work considered on wood doors or File Room in office area.  \nThank you for the opportunity to bid on this project.If you have any questions after your review,please give me a callSincerely,  \nJason Rowe  \n515-443-0215  \n2350 Hubbell AveDes Moines,IA 50317  \nMay 11,2023  \nBondurant Farrar School District  \nRe:BF Jr High School;Band Area  \nAttn:Dave Walker  \nThis letter serves as a summary of the scope of work we are bidding on the above referenced project;  \n# Scope of Work:\n\n·Prep and paint (4)hollow metal doors  \n● Prep and paint (7)3070 hollow metal frames  \n·Provide labor and material to patch hallway walls where damage occurred from stickers  \n·Prep,spot prime and touch up patches only  \nBudget Pricing:$1,425.00  \n## Exclusions/Clarifications:\n\n·All trash to be disposed in dumpster supplied by general contractor.  \n·  No overtime or weekend work included in base bid.  \n·Work is bid to be performed during regular business hours.7AM to 3:30PM Monday through Friday.  \nThank you for the opportunity to bid on this project.If you have any questions after your review,please give me a call.Sincerely,  \nJason Rowe  \n515-443-0215  \n2350 Hubbell AveDes Moines,IA 50317  \nBondurant Farrar School District  \nMay 16,2023  \nAttn:Dave Walker  \nRe:BF Intermediate;Summer Projects 23'  \nThis letter serves as a summary of the scope of work we are bidding on the","cbCaitsksjqrlYe4","https://ap.wps.com/l/cbCaitsksjqrlYe4","pdf",776314,11,"English","# Agenda Item\n## Budget Impact and Current Bid\n## Attachments\n## Scope of Work\n### High School, Junior High, Intermediate, and Anderson Projects\n### Office Area and Main Stair Wall\n### Auditorium Floor and Stadium Locker Rooms\n### Band Area and Classroom Projects\n## Exclusions/Clarifications","[{\"question\":\"What project is being bid in these documents?\",\"answer\":\"The documents cover campus painting work for Bondurant Farrar School District, referenced as Campus Painting and multiple BF school summer projects.\"},{\"question\":\"What does the scope of work include?\",\"answer\":\"The scope includes preparation and painting of hollow metal doors and frames, spot prime and paint selected interior/exterior wall areas, painting stair walls, refinishing an auditorium floor to existing color and sheen, and painting locker room ceilings and CMU walls.\"},{\"question\":\"What exclusions and clarifications are stated in the bid?\",\"answer\":\"Trash disposal is handled via a dumpster supplied by the general contractor, no overtime or weekend work is included in the base bid, work is limited to regular business hours (7AM to 3:30PM, Monday through Friday), and painting is restricted to specified sides/areas such as the exterior side of HM doors and frames.\"}]","Campus Painting - Recommendation and Bid Scope of Work | PDF",1790544916,28,[147,151,155,159],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/80cde5cd06e7ada70d5d2c232ef1229e.webp",983,1290,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/4e4cd123739ef2e6f042c3b098423b07.webp",982,1300,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/86dd367ef438c5e0314d145f4d0dfa7c.webp",981,1297,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/7d8d9a97a0775287e3d651197c0b31fc.webp",980,1314]