[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662906-105":59,"doc-detail-662906-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","c32-schematic-design-phase-document-checklist","C32 Schematic Design Phase Document Checklist","","C32 Schematic Design Phase Document Checklist outlines the required deliverables for early-stage building design. It specifies general information inputs such as occupancy classifications, egress and ADA accessibility considerations, occupant loads, and code analysis documentation. The checklist then covers space efficiency and cost analysis, building elevations, wall and building sections, site plans, detailed floor plans, architectural and structural details, and supporting project manual content. It also includes high-performance building requirement documents needed during the design phase.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/c32-schematic-design-phase-document-checklist/662906/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/c32-schematic-design-phase-document-checklist/662906.png","ImageObject",300,407,{"name":92,"@type":93},"Rainbow Cat","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What general information documents are required in the C32 checklist?","Question",{"text":112,"@type":113},"The checklist calls for occupancy classifications/const. type(s), a life safety plan addressing fire separations and egress routes, ADA accessibility items, occupant loads, a code analysis sheet, and drawing set sheet index and room numbering system materials.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which cost and efficiency analyses must be included?",{"text":117,"@type":113},"It requires calculations of GSF, NASF, and ER comparisons, escalation factor information, a cost per GSF estimate, and a probable total construction cost.",{"name":119,"@type":110,"acceptedAnswer":120},"What planning and design drawings are listed for schematic floor and site work?",{"text":121,"@type":113},"It specifies site survey and location planning, grading/drainage, utilities/civil, landscaping sketches, and site detail sheets, along with 1/8\" floor plans, roof plans, occupancy separation/rated wall plans, structural framing and foundation/column plans, reflected ceiling and lighting plans, and preliminary lab or kitchen equipment plans when required.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662906,1793223291,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},962090769181,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","C32 SCHEMATIC DESIGN PHASE DOCUMENT CHECKLIST  \n\n| Project Name: |\n| --- |\n| SBC No.: |\n\n\n| Prepared By: |\n| --- |\n| Date: |\n\n\n| General Information |  |\n| --- | --- |\n|  | Occupancy Classifications/Const. Type(s)\u003Cbr>Life Safety Plan with fire separations/walls, egress routes, ADA accessibility\u003Cbr>Occupant Loads\u003Cbr>Code Analysis Sheet with GSF for each level Drawing Set Sheet Index\u003Cbr>Room Numbering System |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\n\n| Space Efficiency and Cost Analysis |  |\n| --- | --- |\n|  | Calculated GSF, NASF, and ER Comparison of Calculate ER with Bid Target Comparative Project Cost Data\u003Cbr>Escalation Factor Information\u003Cbr>Cost/GSF Estimate\u003Cbr>Probable Total Construction Cost |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\n\n| Building Elevations |  |\n| --- | --- |\n|  | Exterior Bldg. Elevations with locations of doors, operable/fixed/spandrel glazing, floor-to-floor and overall heights\u003Cbr>Exterior Finish Materials\u003Cbr>Exterior Cladding Systems Exterior Lighting Locations Roof Profile and Finish Materials\u003Cbr>Interior Elevations of major/complex spaces Typical Casework Elevations |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\n\n| Building & Wall Sections |  |\n| --- | --- |\n|  | Bldg. Sections showing floor-to-floor heights, space relationships, mechanical plenums\u003Cbr>Preliminary Typical Exterior Wall Sections\u003Cbr>Stair, Elevator, and Shaft Sections |\n|  |  |\n|  |  |\n|  |  |\n\n\n| Site Plans |  |\n| --- | --- |\n|  | Site Survey of existing topography\u003Cbr>Site Location Plan with parking/site features Site Grading/Drainage Plan\u003Cbr>Site Utilities/Civil Engineering Plan\u003Cbr>Site Landscaping Sketch Plan\u003Cbr>Site Detail Sheets |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\n\n| Building Floor Plans |  |\n| --- | --- |\n|  | 1/8\" Floor Plans with gross dimensions, building columns, and door swings\u003Cbr>1/8\" min. Roof Plan\u003Cbr>Occupancy Separation/Rated Wall Plans Structural Foundation/Column Plans\u003Cbr>Structural Framing Plans\u003Cbr>Preliminary Furniture/Equipment Plans Reflected Ceiling Plans, major/typical spaces Mechanical Single-Line Distribution Plans Vertical Circulation, Shafts, and Chases Electrical Lighting Plans\u003Cbr>Preliminary Lab Equipment Plans (if required) Preliminary Kitchen/Specialty Equipment Plans |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\n\n| Details |  |\n| --- | --- |\n|  | Preliminary Significant Exterior Wall Details Significant Structural Details\u003Cbr>Preliminary MEP Equipment Schedules Reflected Ceiling Plans for major/typical spaces Specialty Wall Details (blast/dust/visual) |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\n\n| Project Manual |  |\n| --- | --- |\n|  | Basis of Design Description Basic Building Materials List Outline Specifications\u003Cbr>Interior Finish Narrative Description Soils Investigation Report\u003Cbr>Storm Water Erosion Control Plan/Preliminary Storm Water Pollution Prevention Plan\u003Cbr>Traffic Study & Description (if required)\u003Cbr>Signage/Wayfinding Narrative (if required)\u003Cbr>Vibration Analysis (if required)\u003Cbr>Fume Hood/Lab Equipt. Inventory (if required) |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\n\n| High Performance Building Requirements |  |\n| --- | --- |\n|  | HPBr documents required for design phase. |","cbCainzbHGfZvwaa","https://ap.wps.com/l/cbCainzbHGfZvwaa","pdf",47951,"English","# General Information\n# Space Efficiency and Cost Analysis\n# Building Elevations\n# Building & Wall Sections\n# Site Plans\n# Building Floor Plans\n# Details\n# Project Manual\n# High Performance Building Requirements","[{\"question\":\"What general information documents are required in the C32 checklist?\",\"answer\":\"The checklist calls for occupancy classifications/const. type(s), a life safety plan addressing fire separations and egress routes, ADA accessibility items, occupant loads, a code analysis sheet, and drawing set sheet index and room numbering system materials.\"},{\"question\":\"Which cost and efficiency analyses must be included?\",\"answer\":\"It requires calculations of GSF, NASF, and ER comparisons, escalation factor information, a cost per GSF estimate, and a probable total construction cost.\"},{\"question\":\"What planning and design drawings are listed for schematic floor and site work?\",\"answer\":\"It specifies site survey and location planning, grading/drainage, utilities/civil, landscaping sketches, and site detail sheets, along with 1/8\\\" floor plans, roof plans, occupancy separation/rated wall plans, structural framing and foundation/column plans, reflected ceiling and lighting plans, and preliminary lab or kitchen equipment plans when required.\"}]","C32 Schematic Design Phase Document Checklist | PDF"]