[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-649763-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-649763-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","building-plan-approval-for-extension-and-renovation-work-for-industrial-building-practical-training-report","Building Plan Approval for Extension and Renovation Work for Industrial Building - Practical Training Report","","The main objective of this practical training report is to study the building plan approval process for extensions and renovations. The case study focuses on the Alor Setar City Council (Majlis Bandaraya Alor Setar), specifically the Department of Architect and Building Control (MBAS). The report describes procedures for applying for building plan approval from the application stage through to the Letter of Permission, supported by practical training context.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/building-plan-approval-for-extension-and-renovation-work-for-industrial-building-practical-training-report/649763/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/building-plan-approval-for-extension-and-renovation-work-for-industrial-building-practical-training-report/649763.png","ImageObject",300,407,{"name":42,"@type":43},"Angel","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-25","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the main objective of the report?","Question",{"text":62,"@type":63},"To learn about the approval process for building plans for extensions and renovations work, including how applications progress to the Letter of Permission.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Which authority is used for the case study?",{"text":67,"@type":63},"The case study is based on the Alor Setar City Council (Majlis Bandaraya Alor Setar), focusing on the Department of Architect and Building Control (MBAS).",{"name":69,"@type":60,"acceptedAnswer":70},"What stages are covered in the building plan approval process?",{"text":71,"@type":63},"The report outlines the procedure from the application stage, including pre-checking, related submissions and fees, open file preparation, site visit, and approval leading to the Letter of Permission.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},649763,1792956768,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},687207412472,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","PROGRAMME IN BUILDING SURVEYING DEPARTMENT OF BUILT ENVIRONMENT STUDIES & TECHNOLOGY FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING  \nUNIVERSITI TEKNOLOGI MARA  \nPERAK BRANCH  \nSERI ISKANDAR CAMPUS  \nBUILDING PLAN APPROVAL FOR EXTENSION  \nAND RENOVATION WORK FOR INDUSTRIAL BUILDING  \nNUR AZIRA BINTI IMRON  \n(2018235218)  \nBACHELOR OF BUILDING SURVEYING (HONS.)  \nPRACTICAL TRAINING REPORT  \nFEBRUARY 2022  \nPROGRAMME IN BUILDING SURVEYING DEPARTMENT OF BUILT ENVIRONMENT STUDIES & TECHNOLOGY FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING  \nUNIVERSITI TEKNOLOGI MARA  \nPERAK BRANCH  \nSERI ISKANDAR CAMPUS  \nBUILDING PLAN APPROVAL FOR EXTENSION AND RENOVATION WORK FOR INDUSTRIAL BUILDING  \nFEBRUARY 2022  \nThis practical training report is fulfilment of the practical training course.  \nPREPARED BY  \nNAME : NUR AZIRA BINTI IMRON  \nSIGNITURE :    \nSUPERVISING LECTURER  \nNAME : NURHIDAYAH SAMSUL RIJAL  \nSIGNITURE :    \nDATE :    \nABSTRACT  \nThe main objective of this study is to learn more about the approval process for building plans for extensions and renovations work. The subject of this study was the Alor Setar City Council (Majlis Bandaraya Alor Setar) . The case study focuses on Department of Architect and Building Control at local authority known as MBAS. In this case study explain about the procedure for applying building plan approval for extension and renovation work in MBAS from the application stage until the Letter of Permission.  \nACKNOWLEDGEMENT  \nPraise to Allah S.W.T. for His grace and His mercy. I was able to complete this report within the time allowed. With the mercy of HIM, I have had the strength and confidence to complete this task.  \nI would like to express my sincere gratitude to my supervisor and also my Lecturer, Madam Nurhidayah Samsul Rijal of her guidance, support, comments and patient during preparing this report  \nI would also like to thank Mr. Aznan bin Othman as the supervisor, and all of the staff who has given me guidance providing information and teaching me about the work at my industrial training their support,  \nI also want to thank both of my parents, Imron bin Ahmad and Noriyah binti Lah who support, give me courage, all the prayers, love, understanding and patience to finish this assignment.  \nI would also like to thank all my classmates who have support and helping me during the process of completing this assignment  \nTABLE OF CONTENT  \nCHAPTER 1  \n1.1 Introduction 1  \n1.2 Company background 2-3  \n1.3 Vision and Mission 3  \n1.3.1 Vision 3  \n1.3.2 Mission 3  \n1.4 Organisation Chart of Majlis Bandaraya Alor Setar 4  \n1.5 Organisation Chart Department of Architect and Building 5  \nControl  \n1.6 Location Plan 6  \n1.6.1 Key Plan 6  \n1.6.2 Site Plan 6  \n1.5 Scope and Responsible 7  \n1.6 Summary 7  \nCHAPTER 2  \n2.1 Introduction 8  \n2.2 Building Plan Approval 7  \n2.2.1 Definition of CCC 9-10  \n2.2.2 Existing Building Plan Approval 10  \n2.2.3 New Building Plan Approval 11  \n2.3 Type of Renovation Requirement Submission 12  \n2.3.1 Internal Layout Change 12  \n2.3.2 Building Extension and Additional Build Area 13  \n2.3.3 Wall Breaking 13  \n2.3.4 Change of Premise Function 14  \n2.4 Building Plan Approval Procedure 15  \n2.5 Summary 16  \nCHAPTER 3  \n3.1 Introduction of Building Plan Approval 17  \n3.2 Location of Case Study 18  \n3.3 Standard Procedure of Building Plan Approval for Extension 19 and Renovation Work  \n3.3.1 Pre-checking of Plan to Application 19-22  \n3.3.2 Building Plan fees for Approval 23  \n3.3.3 One Stop Centre (OSC) 24  \n3.3.4 Open File For Building Plan Approval 25-27  \n3.3.5 Site Visit for Building Plan Approval 28-29  \n3.3.6 Approval of The Application 30-32  \n3.4 summary 33  \nCHAPTER 4  \n4.1 Problem 34  \n4.1.1 Building plan approval 34  \n4.1.2 Land status 34  \n4.2 Recommendation  \nCHAPTER 5  \n5.1 Conclusion 35  \n5.2 Recommendation 36  \nREFERENCE 37  \nLIST OF FIGURE  \nFigure 1 : Logo Majlis Bandaraya Alor Setar 2  \nFigure 2: Organisation Chart of Majlis Bandaraya Alor Setar 4  \nFigure 3:","cbCaiiKPlTYRX5UD","https://ap.wps.com/l/cbCaiiKPlTYRX5UD","pdf",2307480,45,"English","# CHAPTER 1\n## 1.1 Introduction\n## 1.2 Company background\n## 1.3 Vision and Mission\n## 1.4 Organisation Chart of Majlis Bandaraya Alor Setar\n## 1.5 Organisation Chart Department of Architect and Building Control\n## 1.6 Location Plan\n## 1.5 Scope and Responsible\n## 1.6 Summary\n# CHAPTER 2\n## 2.1 Introduction\n## 2.2 Building Plan Approval\n## 2.3 Type of Renovation Requirement Submission\n## 2.4 Building Plan Approval Procedure\n## 2.5 Summary\n# CHAPTER 3\n## 3.1 Introduction of Building Plan Approval\n## 3.2 Location of Case Study\n## 3.3 Standard Procedure of Building Plan Approval for Extension and Renovation Work\n## 3.4 summary\n# CHAPTER 4\n## 4.1 Problem\n## 4.1.1 Building plan approval\n## 4.1.2 Land status\n## 4.2 Recommendation\n# CHAPTER 5\n## 5.1 Conclusion\n## 5.2 Recommendation\n## REFERENCE","[{\"question\":\"What is the main objective of the report?\",\"answer\":\"To learn about the approval process for building plans for extensions and renovations work, including how applications progress to the Letter of Permission.\"},{\"question\":\"Which authority is used for the case study?\",\"answer\":\"The case study is based on the Alor Setar City Council (Majlis Bandaraya Alor Setar), focusing on the Department of Architect and Building Control (MBAS).\"},{\"question\":\"What stages are covered in the building plan approval process?\",\"answer\":\"The report outlines the procedure from the application stage, including pre-checking, related submissions and fees, open file preparation, site visit, and approval leading to the Letter of Permission.\"}]","Building Plan Approval for Extension and Renovation Work for Industrial Building - Practical Training Report | PDF",1792806437,113]