[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663487-105":59,"doc-detail-663487-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","building-permit-requirements-for-modular-homes-la-crescent-minnesota","BUILDING PERMIT REQUIREMENTS FOR MODULAR HOMES - La Crescent, Minnesota","","Building Permit Requirements for Modular Homes (La Crescent, Minnesota) lists the exact materials the Building Department requires before processing and approving a permit. It specifies the online application, survey or site plan, manufacturer-provided house plans, and plans for site-built garage, deck, porch, and basement foundation, plus any additional miscellaneous items. The text details zoning permit triggers, inspection sequence, scheduling lead time of 7–10 working days, and guidance for permit fees, utilities, and inspection requests.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/building-permit-requirements-for-modular-homes-la-crescent-minnesota/663487/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/building-permit-requirements-for-modular-homes-la-crescent-minnesota/663487.png","ImageObject",300,407,{"name":92,"@type":93},"Obex","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What documents must be submitted before a modular home building permit can be processed?","Question",{"text":112,"@type":113},"Submit the online Building Permit Online Application, a survey or site plan (one hard copy and one PDF), building plans of the house from the manufacturer (one hard copy and one PDF), and building plans for any site-built garage/deck/porch/basement-foundation (one hard copy and one PDF), plus any miscellaneous items required.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What information must the survey or site plan include?",{"text":117,"@type":113},"Provide an updated property plan showing north direction, property lines, road right-of-ways, easements, and the project address or PIN number. Include the proposed building location, dimensions, setbacks, topographical features, grading and erosion control plan, and a registered survey may be required.",{"name":119,"@type":110,"acceptedAnswer":120},"What inspections are required and when should inspection requests be made?",{"text":121,"@type":113},"Required inspections include footings (before concrete is placed), foundations (before backfill), plumbing 5# air test, framing, fireplace rough-in, insulation, mechanical rough-in, plumbing manometer, gas piping (25# for 30 minutes), and final inspection after electrical sign-off and completion. Request inspections by calling 507-895-4409 at least 24 hours in advance.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663487,1793228515,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},5909898192665,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","BUILDING PERMIT REQUIREMENTS  \nFOR MODULAR HOMES  \nLA CRESCENT, MINNESOTA  \nThe following information must be submitted to the Building Department before a building permit can be processed and approved:  \n1. Building Permit Online Application.  \n2. Survey or Site Plan [one hard copy and one pdf].  \n3. Building Plans-Of the house from the manufacture [one hard copy and one pdf].  \n4. Building Plans-Site built garage, deck, porch, basement-foundation [one hard copy and one pdf].  \n5. Miscellaneous as required.  \nA more detailed description of items 1-5 is listed below. After a preliminary review additional information may be required. Allow 7-10 working days for processing.  \n1. Building Permit Application: Complete the online Building Permit Application.  \n2. Survey or Site Plan: Provide an updated plan of the property showing the direction north, property lines, road right of ways, easements and project address or PIN number. Diagram the proposed building location, dimensions and proposed setbacks from property lines, all topographical features, grading and erosion control plan. A registered survey may be required.  \n3. Building Plans-Site built garage, deck, porch, and basement-foundation:  \nA. Elevation Drawings [exterior views] of front, rear and sides of finished garage. Indicate the height from finished grade to the top of the sidewalls and peak.  \nB.  Section drawing [side, cutaway drawing] showing the details of the footings, foundation, floor, wall and roof construction, [of both the garage and the foundation of the house].  \nC. List the type of waterproofing that will be used on the basement walls below grade.  \nD. Floor Plans of the basement showing the length and width, room dimensions and use [bedroom, bathroom etc.], finished and unfinished areas, window and door locations, window manufacture and product number, interior walls, stairs and plumbing/heating fixtures.  \n4. Miscellaneous: Grading and/or Filling Permits may be required if significant parcel or topographical alterations are proposed.  \nZoning: A zoning permit application is required if a variance, conditional use permit or special evaluation is required, contact a city planner for specific requirements.  \nPermit Fees: Building and Zoning fees will be determined after the application and required plans have been approved. Fees must be paid in full before a permit can be issued or work can begin.  \nGeneral Information  \nRequired Inspections*  \n1. Footings [before concrete is placed].  \n2.Foundations [before backfill]  \n3. Plumbing 5\\# air test.  \n4. Framing.  \n5. Fireplace rough-in.  \n6. Insulation  \n7. Mechanical rough-in.  \n8. Plumbing Manometer.  \n9. Gas Piping [25\\# for 30 minutes].  \n10. Final, after the electrical inspector has done a final and all work and inspections are complete.  \n* [Misc. as](Misc. as) needed.  \nInspection Requests: For all inspections call 507-895-4409 24 hours in advance.  \nGas and Electric Utilities: Contact your local supplier for specific requirements.  \nElectrical: Must be inspected and approved by a State Electrical Inspector. To request an inspection orto answer electrical questions call: Dylan Becker, to request an inspection or to answer electrical  \nquestions call: 612-619-7597, between 7am and 8:30 am, Monday through Thursday.  \nExcavations: prior to excavating call Gopher State One, 48 hours in advance at 1-800-252-1166, to verify the location of underground utilities etc.  \nIf you have any questions, please contact the Building Department, Monday through Friday, 7:30 [a.m. to](a.m. to)[ ](a.m. to)4:00 [p.m. at](p.m. at) 507-895-4409, or write to, [inspections@cityoflacrescent-mn.gov](inspections@cityoflacrescent-mn.gov), 315 Main Street, City of La Crescent, Minnesota, 55947.","cbCaijmCLJdUJvyv","https://ap.wps.com/l/cbCaijmCLJdUJvyv","pdf",30428,"English","# Submission Requirements\n## Core items to submit (1-5)\n## Additional review and timing\n# Permit Application Details\n## Building permit application\n## Survey or site plan requirements\n## Building plans for site-built portions and basement foundation\n## Miscellaneous permits\n# Zoning and Fees\n# Required Inspections\n## Inspection list and call-ahead timing\n# Contact and Utility Notes","[{\"question\":\"What documents must be submitted before a modular home building permit can be processed?\",\"answer\":\"Submit the online Building Permit Online Application, a survey or site plan (one hard copy and one PDF), building plans of the house from the manufacturer (one hard copy and one PDF), and building plans for any site-built garage/deck/porch/basement-foundation (one hard copy and one PDF), plus any miscellaneous items required.\"},{\"question\":\"What information must the survey or site plan include?\",\"answer\":\"Provide an updated property plan showing north direction, property lines, road right-of-ways, easements, and the project address or PIN number. Include the proposed building location, dimensions, setbacks, topographical features, grading and erosion control plan, and a registered survey may be required.\"},{\"question\":\"What inspections are required and when should inspection requests be made?\",\"answer\":\"Required inspections include footings (before concrete is placed), foundations (before backfill), plumbing 5# air test, framing, fireplace rough-in, insulation, mechanical rough-in, plumbing manometer, gas piping (25# for 30 minutes), and final inspection after electrical sign-off and completion. Request inspections by calling 507-895-4409 at least 24 hours in advance.\"}]","BUILDING PERMIT REQUIREMENTS FOR MODULAR HOMES - La Crescent, Minnesota | PDF"]