[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663318-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-663318-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","building-permit-application-series-additions-2020","Building Permit Application Series - Additions - 2020","","Planning & Engineering Services provides application instructions for building permits for additions under the National Building Code—2019 Alberta Edition. A Safety Codes Officer reviews submissions for code compliance, issues the permit, and forwards it to the applicant’s mailing address. Construction inspections are required before pouring concrete piles or backfilling, after the framed structure is complete, and before drywall or interior finishes are installed. Property owners must secure all required permits and ensure construction meets specific code sections, including framing, exterior finishes, and fireplace installation.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/healthcare/","Healthcare",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/building-permit-application-series-additions-2020/663318/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/building-permit-application-series-additions-2020/663318.png","ImageObject",300,407,{"name":42,"@type":43},"Patrick","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"Who reviews an additions building permit application and what happens next?","Question",{"text":62,"@type":63},"A Safety Codes Officer reviews the permit application for compliance with the National Building Code—2019 Alberta Edition. A permit is then issued and forwarded to the mailing address.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"When must inspections for an addition be requested?",{"text":67,"@type":63},"Inspections must be requested prior to pouring concrete piles or backfilling of foundation walls, upon completion of the framed structure, and prior to installing drywall/interior finishes.",{"name":69,"@type":60,"acceptedAnswer":70},"What are the property owner’s responsibilities before starting work?",{"text":71,"@type":63},"The property owner must obtain all required permits prior to commencement of work and ensure construction complies with the National Building Code—2019 Alberta Edition.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},663318,1793226469,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":107,"slug":108},7,40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":106,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":96},549758146520,"https://ap-avatar.wpscdn.com/avatar/80002397d8c0411e94?_k=1775819394049821470","PLANNING & ENGINEERING SERVICES BUILDING PERMIT APPLICATION SERIES  \nA Safety Codes Officer will review your permit application for compliance with the National Building Code – 2019 Alberta Edition. Important information will be added where necessary. A permit will then be issued and forwarded to your mailing address.  \nInspection of the addition must be requested at the following stages:  \nPrior to pouring concrete piles or backfilling of foundation walls.  \nUpon completion of the framed structure.  \nPrior to installing drywall/interior finishes.  \nContact Building Inspection Services at 780-418-6601 at least 24 hours in advance.  \nIt is the property owner's responsibility to obtain all  \nrequired permits prior to commencement of the work and to ensure construction complies with the National Building Code  \n– 2019 Alberta Edition.  \nAll floor, wall and roof framing shall conform to the requirements of Section 9.23 of the National Building Code – 2019 Alberta Edition and good construction practice.  \nExterior finishes shall be installed in  \nconformance with Section 9.27 of the National Building Code – 2019 Alberta Edition to prevent the entry of rain and snow into the wall and roof assemblies.  \nFireplaces shall be installed in strict  \nconformance with the manufacturer's installation instructions. An inspection of the fireplace must be requested prior to it being covered with interior finishes.  \nCall before you dig!  \nTo have buried utilities located call 1-800-242-3447.  \nIn addition to a building permit you may also require plumbing, gas, heating and/or electrical permits.  \nFor further information regarding permit applications and the Alberta building regulations, please contact Building Inspection Services at 780-418-6601.  \nADDITIONS  \nINFORMATION ON HOW TO APPLY FOR A BUILDING PERMIT  \nGENERAL INFORMATION WHERE TO APPLY  \nAll foundation walls on footings must conform to the requirements of Section 9.15 of the National Building Code – 2019 Alberta Edition.  \n Pile and grade beam foundations must be designed by a Professional Engineer licensed to practice in the Province of Alberta.  \n Other types of foundations, or supporting elements, will be reviewed by a Safety Codes Officer for compliance with the intent of the National Building Code-2019 Alberta Edition.  \nPermit applications may be submitted at:  \nPlanning & Engineering Department 2nd Floor, St. Albert Place  \n5 St. Anne St.  \nSt. Albert, AB T8N 3Z9 Office  \nHours: 8:00 am-5:00 pm  \nPermit payment may be made by cash, personal cheque, credit card or debit card.  \nFor more information, call 780-459-1654. Building Inspection Services","cbCaiuphhBrqbyzr","https://ap.wps.com/l/cbCaiuphhBrqbyzr","pdf",523202,"English","# Additions\n## Inspection stages and notice\n## General information and requirements\n## Where to apply and payment","[{\"question\":\"Who reviews an additions building permit application and what happens next?\",\"answer\":\"A Safety Codes Officer reviews the permit application for compliance with the National Building Code—2019 Alberta Edition. A permit is then issued and forwarded to the mailing address.\"},{\"question\":\"When must inspections for an addition be requested?\",\"answer\":\"Inspections must be requested prior to pouring concrete piles or backfilling of foundation walls, upon completion of the framed structure, and prior to installing drywall/interior finishes.\"},{\"question\":\"What are the property owner’s responsibilities before starting work?\",\"answer\":\"The property owner must obtain all required permits prior to commencement of work and ensure construction complies with the National Building Code—2019 Alberta Edition.\"}]","Building Permit Application Series - Additions - 2020 | PDF"]