[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664068-105":3,"detail-sidebar-cat-0-en-105":79,"doc-detail-664068-en":129},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":72,"head_meta":74,"extra_data":76,"updated_unix":78},105,"en","building-permit-application-hudson-fire-department-inspectional-services-division","Building Permit Application - Hudson Fire Department Inspectional Services Division","","Building permit application materials for the Town of Hudson, New Hampshire, issued by the Fire Department’s Inspectional Services Division. The form lists required submission items such as plot plans, construction drawings, applicable energy forms, and potential supplemental departmental information. It includes sections to select property address details, project type and improvement categories, project cost and scope, square footage metrics, structural frame type, sewage disposal and water supply, plus applicant owner/contractor/architect/engineer contacts and required certifications and signature authorizations.",{"@graph":14,"@context":71},[15,34,54],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/building-permit-application-hudson-fire-department-inspectional-services-division/664068/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":48,"encodingFormat":47,"isAccessibleForFree":49,"interactionStatistic":50},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/building-permit-application-hudson-fire-department-inspectional-services-division/664068.png","ImageObject",300,407,{"name":42,"@type":43},"Đào","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29",true,{"@type":51,"interactionType":52,"userInteractionCount":30},"InteractionCounter",{"@type":53},"ViewAction",{"@type":55,"mainEntity":56},"FAQPage",[57,63,67],{"name":58,"@type":59,"acceptedAnswer":60},"What supporting documents may be required with a Hudson building permit application?","Question",{"text":61,"@type":62},"Some permit applications require a scaled plot plan, construction drawings, and attached energy forms for heated structures. Additional supplemental information may be requested and applicants are directed to contact relevant departments for assistance.","Answer",{"name":64,"@type":59,"acceptedAnswer":65},"How should wetland-related requirements be handled in the application process?",{"text":66,"@type":62},"Applicants must take steps to prevent intrusion into wetlands areas or the surrounding 50-foot buffer. If intrusion is likely, a Conditional Use Permit must be requested from the Planning Board, and the plan should show wetland locations, buffer, and structures, with wetlands staked by a certified expert.",{"name":68,"@type":59,"acceptedAnswer":69},"What does the applicant’s certification and signature section authorize?",{"text":70,"@type":62},"The owner of record authorizes the proposed work and confirms that the applicant is authorized to submit the application. The applicant also attests that statements are true and authorizes Code Officials, the Building Inspector, and the Assessor (or their agents) to conduct inspections during and after completion of the permitted work.","https://schema.org",{"og:url":32,"og:type":73,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":75,"canonical":32},"index,follow",{"doc_id":77,"site_id":7},664068,1793238268,{"code":4,"msg":80,"data":81},"success",[82,86,90,94,99,104,109,113,118,121,125],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":83,"show_sort_weight":84,"slug":85},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":87,"show_sort_weight":88,"slug":89},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},"Exam",70,"exam",{"id":95,"doc_module":4,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},5,"Comic",60,"comic",{"id":100,"doc_module":4,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},6,"Technology",50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},8,30,"research-report",{"id":114,"doc_module":4,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},9,"Religion & Spirituality",20,"religion-spirituality",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":119,"show_sort_weight":116,"slug":120},"World Cup","world-cup",{"id":122,"doc_module":4,"doc_module_name":25,"category_name":123,"show_sort_weight":122,"slug":124},10,"Lifestyle","lifestyle",{"id":126,"doc_module":4,"doc_module_name":25,"category_name":127,"show_sort_weight":95,"slug":128},19,"General","general",{"code":4,"msg":80,"data":130},{"doc_id":77,"user_id":131,"nickname":42,"user_avatar":132,"doc_module":4,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":110,"language":138,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":12,"update_tm":78,"read_time":116},1374402968488,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","TOWN OF HUDSON  \n FIRE DEPARTMENT- INSPECTIONAL SERVICES DIVISION  12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6005 · Fax: 603-594-1142  \nSome building permit applications must be accompanied with:  \n(A) A plot plan to scale showing the proposed structure in relationship to the property lines.  \n(B) Construction drawings  \n(C) The attached energy forms only apply to heated structures.  \n(D) The following supplemental information may be required. Contact the following departments for assistance:  \nEngineering @ 886-6008  \nDischarge Application Dredge & Fill  \nDriveway Sewer Permit Site Specific Storm water NOI Water Permit  \nInspectional Services @ 886-6005  \nElectrical Permit Mechanical Permit Plumbing Permit Sign Permit  \nSite Plan Applications Special Exceptions Subdivision Applications Variance  \nApplications  \nWetland Conservation District:  \nThe applicant is required to take steps to prevent any intrusion into wetlands areas or the surrounding 50-foot buffer. This includes any equipment used in preparation or construction. If such intrusion is likely, the applicant must request a Conditional Use Permit from the Planning Board. If the applicant isnot sure whether wetlands are present, they may request an opinion from the Town, or employ a certified wetland expert. If the building plan requires a Conditional Use Permit, the plan must show the locations of the wetland, the buffer and all structures. The wetlands must be staked by a certified wetlands expert. Please be advised it is not always obvious that wetlands are present. In addition to the evidence of water, specific vegetation may be evidence of a wetland. Failure to comply with this requirement will result in a stop work order and may lead to monetary fines being imposed.  \nTOWN OF HUDSON  \n FIRE DEPARTMENT- INSPECTIONAL SERVICES DIVISION   \n12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6005 · Fax: 603-594-1142  \nBUILDING PERMIT APPLICATION – PLEASE PRINT  \n\n| Address:   Unit \\#  \u003Cbr>Site/Sub Plan:   HCRD  |  |  | Office use:\u003Cbr>Map   Lot   Zone  \u003Cbr>Permit \\#   |\n| --- | --- | --- | --- |\n| Residential\u003Cbr>  Single family detached\u003Cbr>  Modular Homes\u003Cbr>  Duplex\u003Cbr>  3+ family dwelling (\\# of units   )\u003Cbr>  Other    |  | Type of Improvement\u003Cbr>  New Building   Deck\u003Cbr>  Addition   Shed\u003Cbr>  Alteration/Renovation   Swim Pool\u003Cbr>  Repair/Replacement   Garage\u003Cbr>  Conversion of +/ -dwelling units   Carport\u003Cbr>  Other   |  |\n| Commercial\u003Cbr>  Office/Bank/Professional   Garage\u003Cbr>  Hospital/Medical   School\u003Cbr>  Industrial/Warehouse   Store\u003Cbr>  Restaurant   Utility\u003Cbr>  Other   |  | Type of Improvement\u003Cbr>  New Building   Deck\u003Cbr>  Addition   Shed\u003Cbr>  Alteration/Renovation   Swim Pool\u003Cbr>  Repair/Replacement   Interior Demo\u003Cbr>  Conversion from residential to commercial space\u003Cbr>  Other   |  |\n| Will the applicant/owner manufacture, assemble or produce any product, regardless of water use?\u003Cbr>Yes 􀀀 (Need IDA Form) No 􀀀 (Need IDA Checklist) *Please consult the Town Engineer at 886-6008 with any questions |  |  |  |\n| Total Cost of Project:\u003Cbr>$  | General Description of Work and Use Include dimensions of building, room, shed, pool, etc.\u003Cbr>List \\# of bedrooms and bathrooms if new home or added. If use of existing building is being changed, enter proposed use.\u003Cbr> |  |  |\n| Square Footage Footprint   Renovated/added   Number of stories  \u003Cbr>Living area of new home (exclude unfinished areas and garage)   Total area of bldg   |  |  |  |\n| Principal Type of Frame 􀀀 Masonry (wall bearing) 􀀀 Wood Frame 􀀀 Structural steel\u003Cbr>􀀀 Reinforced concrete 􀀀 Other-Specify   |  |  |  |\n| Type of Sewage Disposal 􀀀 Town or private company (requires Town permit)\u003Cbr>􀀀 Private (septic tank, etc.) |  |  |  |\n\nTOWN OF HUDSON  \n FIRE DEPARTMENT- INSPECTIONAL SERVICES DIVISION   \n12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6005 · Fax: 603-594-1142  \n\n| Type of Water Supply 􀀀 Town Type of Heat Source 􀀀 Gas 􀀀 Other  \u003Cbr>􀀀 Private (well, cistern) 􀀀 O","cbCaif7cXwxEVVMt","https://ap.wps.com/l/cbCaif7cXwxEVVMt","pdf",2026407,"English","# Building Permit Application - Please Print\n## Required Supporting Submissions\n## Project and Improvement Information\n## Costs, Description, and Building Metrics\n## Structural, Sewage, and Water Supply Details\n## Applicant Contacts and Certifications\n## Fees, Permits Status, and Inspections","[{\"question\":\"What supporting documents may be required with a Hudson building permit application?\",\"answer\":\"Some permit applications require a scaled plot plan, construction drawings, and attached energy forms for heated structures. Additional supplemental information may be requested and applicants are directed to contact relevant departments for assistance.\"},{\"question\":\"How should wetland-related requirements be handled in the application process?\",\"answer\":\"Applicants must take steps to prevent intrusion into wetlands areas or the surrounding 50-foot buffer. If intrusion is likely, a Conditional Use Permit must be requested from the Planning Board, and the plan should show wetland locations, buffer, and structures, with wetlands staked by a certified expert.\"},{\"question\":\"What does the applicant’s certification and signature section authorize?\",\"answer\":\"The owner of record authorizes the proposed work and confirms that the applicant is authorized to submit the application. The applicant also attests that statements are true and authorizes Code Officials, the Building Inspector, and the Assessor (or their agents) to conduct inspections during and after completion of the permitted work.\"}]","Building Permit Application - Hudson Fire Department Inspectional Services Division | PDF"]