[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649624-105":59,"doc-detail-649624-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","building-permit-application-checklist-residential-construction-additions-garagessheds-decks","Building Permit Application Checklist - Residential Construction Additions, Garages/Sheds & Decks","","Building Permit Application Checklist for residential construction, specifically additions, garages/sheds, and decks, summarizing submission requirements homeowners must complete before a permit is issued. It lists required provincial application documents, schedules, site plan requirements, building drawings and written descriptions, applicable fees, and memoranda/ministerial forms when project values exceed specified thresholds. It also clarifies common residential construction cases that do not require permits and advises allowing ten business days for review.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/building-permit-application-checklist-residential-construction-additions-garagessheds-decks/649624/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/building-permit-application-checklist-residential-construction-additions-garagessheds-decks/649624.png","ImageObject",300,407,{"name":92,"@type":93},"McGucket","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What documents are required when submitting a residential building permit application?","Question",{"text":112,"@type":113},"The checklist requires a permit application form (two sides), Schedule 1 for designer information, a site plan showing distances and existing/proposed conditions, and two copies of building drawings with written descriptions, plus applicable fees.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When is a memorandum of understanding and Ministry of Labour notice required?",{"text":117,"@type":113},"A memorandum of understanding is required if construction value exceeds $50,000. A Ministry of Labour Notice of Project form is required when project value is over $50,000.",{"name":119,"@type":110,"acceptedAnswer":120},"In which residential construction cases is a building permit not required?",{"text":121,"@type":113},"A permit is not required for structures under 10m² not attached to an existing structure, certain wooden decks without roofs under the specified height rule, fence installation, communication towers not exceeding 16.6 metres above ground, and installation of playground equipment.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649624,1792955686,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},1236954412713,"https://us-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Building Permit Application Checklist  \nRESIDENTIAL CONSTRUCTION Additions, Garages/Sheds & Decks  \nThis checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential addition, deck or accessory building (shed/detached garage) .  \nRequirements at time of submission:  \nProvincial Building Permit Application:  \n􀀂 i) Application for a Permit to Construct or Demolish (2 sides)  \n􀀂 ii) Schedule 1: Designer Information  \n􀀂 Site Plan (showing distances to property lines, existing and proposed structures and any major land features such as rivers, ponds, etc. )  \n􀀂 Two (2) copies of building drawings showing proposed construction and/ora written description detailing all work to be done in the building  \n􀀂 All Applicable Fees  \n􀀂 Memorandum of Understanding (if value of construction is over $50,000 .00)  \n􀀂 Ministry of Labour Notice of Project form required when project value is over $50,000 .00 ([http://www.labour.gov.on.ca/english/hs/forms/index.php](http://www.labour.gov.on.ca/english/hs/forms/index.php))  \nOffice Use  \n􀀃􀀃  \n􀀃  \n􀀃  \n􀀃  \n􀀃  \n􀀃  \nPlease note a building permit is NOT required for the following residential  \nconstruction:  \nA) A structure less than 10m2 (108 ft2) that is not attached to an existing structure.  \nB) Wooden decks with no roof, where the finished deck level is not greater than 0.6m (24 inches) above the adjacent finished grade or attached to an existing structure.  \nC) Installation of a fence.  \nD) Installation of a communication tower not exceeding 16.6 metres (54 .5 feet) above ground level.  \nE) Installation or construction of playground equipment.  \n** Please allow ten (10) business days for the review of your application. If more information is required you will be contacted by the building department. A permit will not be issued until all relevant documentation is  \nreceived. **  \nMinistry of Municipal Affairs & Housing  \nApplication for a Permit to Construct or Demolish  \nThis form is authorized under subsection 8(1 . 1) of the Building Code Act.  \n\n| For use by Principal Authority |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n| Application number: |  |  | Permit number (if different): |  |  |  |  |\n| Date received: |  |  | Roll number: |  |  |  |  |\n| Application submitted to:   TOWNSHIP OF NORTH DUNDAS \u003Cbr>(Name of municipality, upper-tier municipality, board of health or conservation authority) |  |  |  |  |  |  |  |\n| \u003Cbr>A. Project information |  |  |  |  |  |  |  |\n| Building number, street name |  |  |  |  | Unit number |  | Lot/con. |\n| Municipality | Postal code |  |  | Plan number/other description |  |  |  |\n| Project value est. $ |  |  |  | Area of work (m2) |  |  |  |\n| \u003Cbr>B. Purpose of application |  |  |  |  |  |  |  |\n| 􀀁 New construction 􀀁 Addition to an\u003Cbr>existing building |  | 􀀁 Alteration/repair 􀀁 Demolition 􀀁 Conditional Permit |  |  |  |  |  |\n| Proposed use of building |  | Current use of building |  |  |  |  |  |\n| Description of proposed work |  |  |  |  |  |  |  |\n| C. Applicant Applicant is: 􀀁 Owner or 􀀁 Authorized agent of owner |  |  |  |  |  |  |  |\n| Last name | First name |  |  | Corporation or partnership |  |  |  |\n| Street address |  |  |  |  | Unit number | Lot/con. |  |\n| Municipality | Postal code |  |  | Province | E-mail |  |  |\n| Telephone number\u003Cbr>( ) | Fax\u003Cbr>( ) |  |  |  | Cell number ( ) |  |  |\n| \u003Cbr>D. Owner (if different from applicant) |  |  |  |  |  |  |  |\n| Last name | First name |  |  | Corporation or partnership |  |  |  |\n| Street address |  |  |  |  | Unit number | Lot/con. |  |\n| Municipality | Postal code |  |  | Province | E-mail |  |  |\n| Telephone number\u003Cbr>( ) | Fax\u003Cbr>( ) |  |  |  | Cell number ( ) |  |  |\n\nApplication for a Permit to Construct or Demolish – Effective January 1, 2011  \n\n| \u003Cbr>E. Builder (if different from applicant) |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| Last name | First name | Corporation or partnership (if ","cbCaifhCpCIUTTgn","https://ap.wps.com/l/cbCaifhCpCIUTTgn","pdf",1710478,15,"English","# Provincial Building Permit Application\n## Submission Requirements at Time of Submission\n## Documents, Schedules, and Fees\n## Memorandum and Ministry Notices for High-Value Projects\n# Office Use and Application Form Details\n## Application Number and Project Information\n## Purpose of Application and Proposed Work\n## Applicant/Owner/Builder Information\n## Required Schedules\n## Completeness and Compliance Checks\n# When a Building Permit Is Not Required\n## Small Structures and Specific Deck/Fence/Equipment/Tower Cases\n## Review Timeline and Permit Issuance Conditions","[{\"question\":\"What documents are required when submitting a residential building permit application?\",\"answer\":\"The checklist requires a permit application form (two sides), Schedule 1 for designer information, a site plan showing distances and existing/proposed conditions, and two copies of building drawings with written descriptions, plus applicable fees.\"},{\"question\":\"When is a memorandum of understanding and Ministry of Labour notice required?\",\"answer\":\"A memorandum of understanding is required if construction value exceeds $50,000. A Ministry of Labour Notice of Project form is required when project value is over $50,000.\"},{\"question\":\"In which residential construction cases is a building permit not required?\",\"answer\":\"A permit is not required for structures under 10m² not attached to an existing structure, certain wooden decks without roofs under the specified height rule, fence installation, communication towers not exceeding 16.6 metres above ground, and installation of playground equipment.\"}]","Building Permit Application Checklist - Residential Construction Additions, Garages/Sheds & Decks | PDF",1792802972,38]