[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649617-105":59,"doc-detail-649617-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","building-design-information-building-design-criteria-groupdivision-and-fire-safety-checklist-14-0066","Building Design Information - Building Design Criteria - Group/Division and Fire Safety Checklist - 14-0066","","Building Design Information form captures key compliance data for a proposed new building or addition under the Ontario Building Code (O. Reg. 332/12). It records major occupancy group/division, OBC references, location, attached layouts (including fire schematic layout), building area and height metrics, public corridor requirements, exit separation corridors, and design fire-safety measures. The form includes sprinkler and fire alarm system details, occupant load, standpipe/hose provisions, barrier-free requirements, fire separations/resistance ratings, and certification fields for prepared-by parties.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/building-design-information-building-design-criteria-groupdivision-and-fire-safety-checklist-14-0066/649617/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/building-design-information-building-design-criteria-groupdivision-and-fire-safety-checklist-14-0066/649617.png","ImageObject",300,407,{"name":92,"@type":93},"Stanford","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What provisions does the form reference for design compliance?","Question",{"text":112,"@type":113},"The proposed building or addition is stated to be designed according to provisions of the Ontario Building Code, O. Reg. 332/12, including specific references within the form’s sections.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which fire-safety systems and measures does the form ask to document?",{"text":117,"@type":113},"It requests details for fire alarm system type, voice communication, occupant load notes, standpipe and hose system requirements/provisions, whether the building is high, and sprinkler requirements (including location-specific sprinklers). It also asks to state applicable fire safety measures on the next page (reference SB-4).",{"name":119,"@type":110,"acceptedAnswer":120},"How are fire resistance ratings and barrier-free requirements handled?",{"text":121,"@type":113},"The form includes a table for fire separations/resistance ratings (FRR) listing required and proposed FRR with construction assemblies. It also asks whether the building is fully barrier free or partially barrier free and requests an explanation for partial compliance.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649617,1792802914,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":81,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":39},2336477552062,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Design/Criteria  \nBuilding Design Information  \nGroup A, Division 1  \nGroup B, Division 1  \n| |\n| --- |\n|  |\n\n\n|  |  |  | Group C | Group D | Group E | Group F/ Division 1 |\n| --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n| |  |  |  |  |  |  |\n\n\n|  | |  |\n| --- | --- | --- |\n|  |  |  |\n|  | |  |\n|  | |  |\n| |  | |\n| |  |  |\n\n\n|  | | | |\n| --- | --- | --- | --- |\n| |  |  |  |\n\n\n|  |  |\n| --- | --- |\n|  |  |\n| | |\n| |  |\n| \u003Cbr>|  |\n| |  |\n\nFolder No.  \nDo not use this form for Retrofit Permits  \nDistrict Offices  \nToronto and East York North York Scarborough Etobicoke York  \nThe proposed new building or addition is designed in accordance with the following provisions of the Ontario Building Code, O. Reg. 332/12  \nMajor Occupancy  \nGroup/Division  \nOBC Reference  \nLocation  \nLayout attached  \nFor mixed uses, describe the use and/or attach layout: Fire Schematic Layout (1) attached  \nBuilding Information  \nBuilding Area(2) : m2 Mezzanine(4) area: m2 Open Mezzanine Closed Mezzanine  \nBuilding Height(3) : storey(s) Number of streets(5) : with % perimeter within 15m of the street(s)  \nStoreys below grade: storey(s) Firewalls required to separate buildings Yes No  \nPublic Corridors  \nas per: Interconnected floors/atrium Yes No as per:  \nCorridors required for separation of exits Yes No PerSenimeten e3x4its2 .a5s(p2r OBC Yes No Cross-over floor(s) required Yes No Provided on floor(s):  \nSprinklers  \nSprinklers required Yes No as per:  \nSprinklers required in specific locations Yes No as per:  \nSpecific locations:  \nElectrical Supervision required:  \nYes No as per:  \nIs the building sprinklered? Yes No  \nFully Sprinklered  \nPartially Sprinklered Roof Only  \nBasement Only  \nOther:  \nFire Alarm System  \nOccupant Load (as per table 3.1.17. 1. ): Occupant Load (if different from table 3.1.17. 1. ):  \nNote: A sign shall be posted if different from table 3.1.17.1.  \nFire alarm system required: Yes No Voice Communication Yes No  \nType of alarm system provided Single 2-Stage  \nStandpipe and hose system required Yes No Hose Length:  \nStandpipe and hose system provided Yes No  \nIs this building a high building as defined in subsection 3.2.6.? Yes No  \nState applicable Fire Safety measure(s) on the next page (reference SB-4)  \nContinue on next page. 14-0066 2015-07  \nDesign/Criteria  \nBuilding Design Information  \nFire Separations/Resistance Ratings (FRR)  \nBuilding Code Reference No.: or  Table [9.10.8.1](9.10.8.1)  \nBarrier Free Requirements  \nBuilding fully Barrier Free  \nBuilding partially Barrier Free – Please Explain Below:  \n\n| Assembly | Required\u003Cbr>FRR | Proposed\u003Cbr>FRR | Construction\u003Cbr>Assembly | Assembly | Required\u003Cbr>FRR | Proposed\u003Cbr>FRR | Construction\u003Cbr>Assembly |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n| Floor immediately above basement |  |  |  | Mezzanines |  |  |  |\n| Floor below\u003Cbr>ground level |  |  |  | Roof |  |  |  |\n| Other floor(s) |  |  |  | Public\u003Cbr>Corridors |  |  |  |\n| Construction Type :  Combustible permitted  Non-combustible required\u003Cbr> Both – used individually  Both in combination |  |  |  |  |  |  |  |\n\nIf this design is based on Equivalency/Part 10 or Part 11 please describe below or attach report. Report attached  \nEquivalency  \n|  |\n| --- |\n| Telephone No. Company Name Fax No.\u003Cbr>Signature Print Name Date (yyyy-mm-dd) |\n\nPrepared By  \nName of Architect / Professional Engineer / Designer  \nContinue on next page.  \n14-0066 2015-07 2 of 3  \nDesign/Criteria  \nBuilding Design Information  \nNotes  \n|  |  |  |\n| --- | --- | --- |\n| (1) A Fire Schematic Layout includes floor plans and crosand Fire Separations as required by the Ontario Buildi\u003Cbr>(2) Building area is a defined term under O. B. C. Div A , 1. |  | s-section(s) indicating all Fire Resistance Ratings ng Code.\u003Cbr>4.1.2. and shall include existing and proposed areas . |\n|  | (3) Building height means the number of storeys contained between the roof and the floor of the first storey. Storey is defined un","cbCaipbLae1XRGPl","https://ap.wps.com/l/cbCaipbLae1XRGPl","pdf",728024,"English","# Building Information\n## Major Occupancy and Group/Division\n## Layout and Fire Schematic Layout\n## Building Area, Height, Storeys Below Grade\n## Public Corridors and Exit Separation\n## Sprinklers and Fire Alarm System\n## Standpipe and Hose System\n## Fire Safety Measures (Reference SB-4)\n## Fire Separations/Resistance Ratings (FRR)\n## Barrier Free Requirements\n## Equivalency / Part 10-11 Notes\n## Prepared By and Signatures","[{\"question\":\"What provisions does the form reference for design compliance?\",\"answer\":\"The proposed building or addition is stated to be designed according to provisions of the Ontario Building Code, O. Reg. 332/12, including specific references within the form’s sections.\"},{\"question\":\"Which fire-safety systems and measures does the form ask to document?\",\"answer\":\"It requests details for fire alarm system type, voice communication, occupant load notes, standpipe and hose system requirements/provisions, whether the building is high, and sprinkler requirements (including location-specific sprinklers). It also asks to state applicable fire safety measures on the next page (reference SB-4).\"},{\"question\":\"How are fire resistance ratings and barrier-free requirements handled?\",\"answer\":\"The form includes a table for fire separations/resistance ratings (FRR) listing required and proposed FRR with construction assemblies. It also asks whether the building is fully barrier free or partially barrier free and requests an explanation for partial compliance.\"}]","Building Design Information - Building Design Criteria - Group/Division and Fire Safety Checklist - 14-0066 | PDF"]