[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664899-105":59,"doc-detail-664899-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","building-control-fees-1-april-2026","Building Control Fees - 1 April 2026","","Charges for Building Regulation applications in Basingstoke and Deane Borough Council are set according to the proposed work type and the application route submitted. The document explains Full Plans, Building Notice, and Regularisation applications, including plan, inspection, and building notice fee components and VAT treatment. It also provides fee schedules for new housing creation or conversion by number of units and for domestic small buildings, extensions and alterations by work type and floor area. Guidance is included for large developments and contact details for Building Control.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/building-control-fees-1-april-2026/664899/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/building-control-fees-1-april-2026/664899.png","ImageObject",300,407,{"name":92,"@type":93},"Obex","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29",true,{"@type":101,"interactionType":102,"userInteractionCount":14},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What fees are included in a Full Plans building regulation application?","Question",{"text":111,"@type":112},"A Full Plans application requires plan fees submitted with the application and inspection charges invoiced when site work starts. Charges are subject to VAT.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"How does a Building Notice application differ from Full Plans?",{"text":116,"@type":112},"Building Notice does not require plans at submission and no written Notice of Approval is issued before work begins. The emphasis is on site control, and VAT applies to the building notice charge stated in the tables.",{"name":118,"@type":109,"acceptedAnswer":119},"Are Regularisation application fees subject to VAT?",{"text":120,"@type":112},"The fee for a Regularisation application is not subject to VAT.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},664899,1793278718,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":128,"read_time":52},5909898192665,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Basingstoke and Deane Borough Council, Civic Offices, London Road, Basingstoke, Hampshire RG21 4AH [www.basingstoke.gov.uk](www.basingstoke.gov.uk | 01256 844844)[ | 01256 844844](www.basingstoke.gov.uk | 01256 844844)[ ](www.basingstoke.gov.uk | 01256 844844)[customer.service@basingstoke.gov.uk](customer.service@basingstoke.gov.uk)[ ](customer.service@basingstoke.gov.uk)[Follow us on @BasingstokeGov](Follow us on @BasingstokeGov)  \nTH45922_0323  \nCHARGES FOR BUILDING REGULATION APPLICATIONS  \n1 April 2026  \nCharges for Building Regulation Applications depends upon the type of work you are proposing to do and the type of application deposited.  \nFull Plans  \nThis application requires two sets of detailed drawings for domestic works and four sets for commercial works, to be submitted for approval under Building Regulations. A Full Plans application gives you assurance that, providing the work is carried out in accordance with the approved plans, the regulations will be satisfied and this type of application must always be used for commercial work. The plan charge is submitted with the application and the inspection charge is invoiced when work on site starts. All charges are subject to VAT.  \nBuilding Notice  \nThis application does not require plans at the submission stage, therefore no written Notice of Approval is issued prior to work commencing. The emphasis is placed on site control. The disadvantage of using this type of application is that you will not have approved drawings or specification to work from. A site plan needs tobe deposited with this application. The building notice charge is stated on the tables and is subject to VAT.  \nRegularisation Application  \nThese are applications in respect of works that have been carried out without any other Building Regulation application having been made. It is important to appreciate that you may be requested to expose critical areas of construction and provide calculations in order for Building Control to ascertain compliance with Building Regulations. The fee for this type of application is not subject to VAT.  \nIf you need assistance calculating the appropriate charges please contact Building Control on 01256 845237 or email [building.control@basingstoke.gov.uk. If you](building.control@basingstoke.gov.uk. If you) require a full explanation of the how the fees are calculated please see the‘Building Control fees explained’ document on the Building Control charges page of the website. Please make all cheques payable  \nto Basingstoke and Deane Borough Council.  \nChief Executive: Russell O’Keefe  \nExecutive Director of Borough Services: Rebecca Emmett BSc (Hons), AIEMA  \nFees 10/3/26  \nSCHEDULE 1  \nCHARGES FOR THE CREATION OF OR CONVERSION TO NEW HOUSING  \n\n| No of\u003Cbr>Units | Plan Fee\u003Cbr>Exc VAT | Plan Fee\u003Cbr>Inc VAT | Inspection Fee\u003Cbr>Exc VAT | Inspection Fee\u003Cbr>Inc VAT | Building Notice\u003Cbr>Exc VAT | Building Notice\u003Cbr>Inc VAT |\n| --- | --- | --- | --- | --- | --- | --- |\n| 1 | 281.67 | 338.00 | 550.83 | 661.00 | 959.17 | 1,151.00 |\n| 2 | 450.00 | 540.00 | 743.33 | 892.00 | 1,438 .33 | 1,726.00 |\n| 3 | 539.17 | 647.00 | 934.17 | 1,121.00 | 1,798 .33 | 2,158.00 |\n| 4 | 682.50 | 819.00 | 1,079.17 | 1,295.00 | 2,096.67 | 2,516.00 |\n| 5 | 780.00 | 936.00 | 1,496 .67 | 1,796.00 |  |  |\n| 6 | 898.33 | 1,078.00 | 1,618 .33 | 1,942.00 |  |  |\n| 7 | 989.17 | 1,187.00 | 1,798 .33 | 2,158.00 |  |  |\n| 8 | 1,049.17 | 1,259.00 | 2,097 .50 | 2,517.00 |  |  |\n| 9 | 1,079.17 | 1,295.00 | 2,397.50 | 2,877.00 |  |  |\n| 10 | 1,110 .83 | 1,333.00 | 2,635 .83 | 3,163.00 |  |  |\n| 11 | 1, 140.00 | 1,368.00 | 2,878 .33 | 3,454.00 |  |  |\n| 12 | 1,170 .83 | 1,405.00 | 3,116 .67 | 3,740.00 |  |  |\n| 13 | 1,192 .50 | 1,431.00 | 3,355 .83 | 4,027.00 |  |  |\n| 14 | 1,198 .33 | 1,438.00 | 3,596.67 | 4,316.00 |  |  |\n| 15 | 1,215 .00 | 1,458.00 | 3,835 .83 | 4,603.00 |  |  |\n| 16 | 1,229 .17 | 1,475.00 | 4,075.83 | 4,891.00 |  |  |\n| 17 | 1,240 .83 | 1,489.00 | 4,315 .00 | 5,178.00 |  |  |\n| 18 | 1,246 .67","cbCaim5Lv2EaNxBS","https://ap.wps.com/l/cbCaim5Lv2EaNxBS","pdf",404647,"English","# Charges for Building Regulation Applications\n## Application Types: Full Plans, Building Notice, Regularisation\n## Schedule 1: Charges for Creation or Conversion to New Housing\n## Schedule 2: Charges for Domestic Small Buildings, Extensions and Alterations","[{\"question\":\"What fees are included in a Full Plans building regulation application?\",\"answer\":\"A Full Plans application requires plan fees submitted with the application and inspection charges invoiced when site work starts. Charges are subject to VAT.\"},{\"question\":\"How does a Building Notice application differ from Full Plans?\",\"answer\":\"Building Notice does not require plans at submission and no written Notice of Approval is issued before work begins. The emphasis is on site control, and VAT applies to the building notice charge stated in the tables.\"},{\"question\":\"Are Regularisation application fees subject to VAT?\",\"answer\":\"The fee for a Regularisation application is not subject to VAT.\"}]","Building Control Fees - 1 April 2026 | PDF"]