[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649622-105":59,"doc-detail-649622-en":134},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":127,"head_meta":129,"extra_data":131,"updated_unix":133},105,"en","building-a-shed-or-garage-process-and-information-guide","BUILDING A SHED OR GARAGE - PROCESS AND INFORMATION GUIDE","","Provides a municipal checklist for obtaining a building permit to construct or replace a shed or garage. Covers when a permit is required based on size and whether the structure is attached, specifies drawing submission standards and designer stamp requirements, outlines drawing set contents (survey/site plan, construction drawings, plan views, elevations, and sections), explains where and when to apply, and details permit fees and typical review timelines. Includes sample drawing page references and scale examples.",{"@graph":69,"@context":126},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/building-a-shed-or-garage-process-and-information-guide/649622/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/building-a-shed-or-garage-process-and-information-guide/649622.png","ImageObject",300,407,{"name":92,"@type":93},"Grenda","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-13","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118,122],{"name":109,"@type":110,"acceptedAnswer":111},"When is a building permit required for a shed or garage?","Question",{"text":112,"@type":113},"A permit is required when a shed or garage (new or replacement) is 108 ft² in size or greater, or when the shed or garage is attached to another structure.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What must be included in the submitted drawings for a building permit?",{"text":117,"@type":113},"Submissions must include 2 sets of drawings to a recognizable standard scale, with 1 set provided as an electronic copy (PDF only). Hand-drawn drawings cannot be on paper larger than 11”x17”, and required designer stamps (BCIN, Architect and/or Engineer as applicable) must be included.",{"name":119,"@type":110,"acceptedAnswer":120},"What drawings are required for the permit application?",{"text":121,"@type":113},"Applicants must provide a copy of the property survey (or equivalent site plan) showing the shed/garage location and distances to property lines and the septic system, plus construction drawings including plan view, side views, and sections (cross section and wall sections as needed).",{"name":123,"@type":110,"acceptedAnswer":124},"How are building permit fees calculated and how long does review take?",{"text":125,"@type":113},"Fees are based on construction value: $11.46 per $1000 of construction value plus a flat $100. After a complete application is made, the permit is reviewed within a maximum of 10 business days.","https://schema.org",{"og:url":83,"og:type":128,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":130,"canonical":83},"index,follow",{"doc_id":132,"site_id":62},649622,1792900629,{"code":4,"msg":5,"data":135},{"doc_id":132,"user_id":136,"nickname":92,"user_avatar":137,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":138,"file_id":139,"file_url":140,"file_type":141,"file_size":142,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":34,"language":143,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":144,"faqs":145,"seo_title":146,"seo_description":67,"update_tm":147,"read_time":148,"preview_page_count":4},7971474921005,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| Township   | BUILDING A SHED OR  \u003Cbr>GARAGE  \u003Cbr>PROCESS AND  \u003Cbr>INFORMATION GUIDE   | Dan Sharina(Building Official)  \u003Cbr>(519)856-9596 ext.117  \u003Cbr>dsharina@get.on.ca  \u003Cbr>www.get.on.ca   |\n| --- | --- | --- |\n\n# All Drawings submitted for building permit must include:\n\n·2 sets of drawings to a recognizable standard scale,of which 1 set of drawings is required to bean electronic copy of drawings(PDF only)  \n● If hand drawn,cannot be drawn on paper greater than 11”x17”  \n● Required designer stamp.BCIN,Architect and/or Engineer(as applicable)  \n# When is a building permit required for a shed or garage?\n\n·When a shed or garage(new or replacement)is 108 ft2 in size or greater  \n·When the shed or garage is attached to another structure  \n# Drawing requirements for a building permit application.\n\n1.A copy of the property survey of your lot or equivalent site plan.  \na.Please draw on location of shed or garage and distance to:  \ni.Property lines  \nii.Septic system  \n2.Construction drawings  \na.Plan view  \ni.Window/door sizes(lintel sizing)  \nii.Floor,wall,and roof construction  \niii.Connection to existing structure(only if attached)  \nb.Side views(front and side)  \ni.Height of structure  \nii.Exterior materials  \nc.Sections  \ni.Cross Section  \nii.Wall sections(as needed)  \n(Note:See attached sample drawings(6 pages)for further details on the above drawings.)  \n# Where to apply for a building permit?\n\nTo apply for a building permit please bring all required drawings and completed permit application tothe Building Department at the Municipal Office located at 8348 Wellington Road 124.  \nOffice hours:  \nMonday to Friday  \n8:30am-4:30pm  \n# Cost of building permit\n\nThe cost of the building permit is based on the value of construction of the project.The fee is $11.46per $1000 of construction value plus a flat fee of $100.The fee covers the review of the drawings forbuilding code compliance,the building permit,and building inspections.We accept cash,cheque,anddebit as methods of payment.  \nTime  \nOnce a complete permit application is made,the permit will be reviewed within a maximum of 10business days.  \n|  | Drawing Name:  \u003Cbr>SAMPLE SITE PLAN   | Project:  \u003Cbr>PROPOSED NEW SHED/GARAGE   | Page:  \u003Cbr>1 of 6   |\n| --- | --- | --- | --- |\n|  | Scale:  \u003Cbr>1/4\"=1'-0\",3/16=1'-0\"or 1/8=1'-0\"etc...   | Address:  \u003Cbr>123 GUELPH/ERAMOSA STREET   |  |\n\nDrawing Name:  \nSAMPLE FLOOR PLAN  \n1/4\"=1'-0\",3/16=1'-0\"or 1/8=1'-0\"etc...  \nProject:  \nPROPOSED NEW SHED/GARAGE  \n123 GUELPH/ERAMOSA STREET  \nPage:  \n2 of 6  \n|  | Drawing Name:  \u003Cbr>CROSS SECTION   | Project:  \u003Cbr>PROPOSED NEW SHED/GARAGE   | Page:  \u003Cbr>3 of 6   |\n| --- | --- | --- | --- |\n|  | Scale:  \u003Cbr>1/4\"=1'-0\",3/16=1'-0\"or 1/8=1'-0\"etc...   | Address:  \u003Cbr>123 GUELPH/ERAMOSA STREET   |  |\n\n12  \n12  \n×/X”ROOF  \n×/X”ROOF  \nSHEATHING  \nISHEATHING.  \nX  \nX  \nNOTE:FLOATING SLABS LARGER THAN  \n55m2 (592sf)REQUIRE TO BE DESIGNED  \nBY AN ENGINEER.  \n2\"×x\"CEILING JOISTS  \n◎ XX”ON CENTRE.  \n2\"xX\"COLLAR TIES  \n2”xX”COLLAR TIES  \n@XX”ON CENTRE.I  \n@XX”ON CENTRE.  \nSEE DRAWINGS 2 AND 7  \nSEE DRAWINGS 2 AND 7  \nFOR INFORMATION ON WOOD  \nFOR INFORMATION ON WOOD  \n2\"xX”RAFTERS @XX\"  \n2“xX”RAFTERS @XX”|  \nFRAME WALL COMPONENTS.  \nFRAME WALL COMPONENTS.  \nON CENTRE.  \nON CENTRE.  \n2”xX”CEILING JOISTS  \nWOOD/VINYL/METAL SIDING.  \nWOOD/VINYL/METAL SIDING.  \n@XX”ON CENTRE.  \nSHEATHING PAPER.  \nSHEATHING PAPER.  \nX/X”SHEATHING.  \nX/X”SHEATHING.  \nWOOD LOCATED WITHIN 6”  \nGARAGE  \nSHED.REPLACE  \n2”xX“WOOD STUDS @XX”0.C.  \n2\"xX”WOOD STUDS @XX\"0.C.  \nOF THE GROUND MUST  \nRXX INSULATION AND VAPOUR  \nRXX INSULATION AND VAPOUR  \nCOMPACTED IN6”LIFTS.  \nBE PRESSURE TREATED.  \nBARRIER(OPTIONAL).  \nBARRIER(OPTIONAL).  \nX/X”DRYWALL (OPTIONAL).  \nx/X”DRYWALL(OPTIONAL).  \nX/X”SHEATHING SUBFLOOR.  \nX”THICK,XX MPa  \n2“xX”P.T.FLOOR JOISTS  \nREFER TO DETAIL BELOW FOR  \nSTRUCTURAL CONCRETE  \nENSURE THAT THE GRADE  \n@XX”ON CENTRE.  \nREINFORCING REQUIREMENTS.  \nSLAB ON GRADE.  \nIS SLOPED AWAY FROM  \nCOMPETENT BEARING SOIL.  \nT","cbCaibtSGFPe6kyc","https://ap.wps.com/l/cbCaibtSGFPe6kyc","pdf",668621,"English","# All Drawings submitted for building permit must include:\n## When is a building permit required for a shed or garage?\n## Drawing requirements for a building permit application.\n## Where to apply for a building permit?\n## Cost of building permit","[{\"question\":\"When is a building permit required for a shed or garage?\",\"answer\":\"A permit is required when a shed or garage (new or replacement) is 108 ft² in size or greater, or when the shed or garage is attached to another structure.\"},{\"question\":\"What must be included in the submitted drawings for a building permit?\",\"answer\":\"Submissions must include 2 sets of drawings to a recognizable standard scale, with 1 set provided as an electronic copy (PDF only). Hand-drawn drawings cannot be on paper larger than 11”x17”, and required designer stamps (BCIN, Architect and/or Engineer as applicable) must be included.\"},{\"question\":\"What drawings are required for the permit application?\",\"answer\":\"Applicants must provide a copy of the property survey (or equivalent site plan) showing the shed/garage location and distances to property lines and the septic system, plus construction drawings including plan view, side views, and sections (cross section and wall sections as needed).\"},{\"question\":\"How are building permit fees calculated and how long does review take?\",\"answer\":\"Fees are based on construction value: $11.46 per $1000 of construction value plus a flat $100. After a complete application is made, the permit is reviewed within a maximum of 10 business days.\"}]","BUILDING A SHED OR GARAGE - PROCESS AND INFORMATION GUIDE | PDF",1792802967,18]