[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-514244-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-514244-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","building-4024-decontamination-and-decommissioning-engineering-evaluationcost-analysis-engineering-evaluation","BUILDING 4024 - DECONTAMINATION AND DECOMMISSIONING ENGINEERING EVALUATION/COST ANALYSIS - Engineering Evaluation","","Engineering Evaluation/Cost Analysis prepared to satisfy Section 300.415(b)(4)(i) of the National Oil and Hazardous Substances Pollution Contingency Plan for a proposed non-time critical removal action at DOE’s Building 4024 within ETEC at SSFL. The report states that the former SNAP SETF exposed structures to neutrons and became radioactive. It defines the removal scope and objectives, compares preferred “demolition/removal and off-site disposal” versus “no action,” and evaluates effectiveness, implementability, and cost as the basis for decision-making.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/building-4024-decontamination-and-decommissioning-engineering-evaluationcost-analysis-engineering-evaluation/514244/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/building-4024-decontamination-and-decommissioning-engineering-evaluationcost-analysis-engineering-evaluation/514244.png","ImageObject",300,407,{"name":42,"@type":43},"Kyle","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-06","2026-10-06",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",10,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of the Engineering Evaluation/Cost Analysis for Building 4024?","Question",{"text":63,"@type":64},"It fulfills regulatory requirements by summarizing removal action objectives and evaluating alternatives to implement decontamination and decommissioning for Building 4024.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What contamination led to the need for Building 4024 decontamination and decommissioning?",{"text":68,"@type":64},"As the former SNAP environmental test facility, Building 4024 tested SNAP reactors, and exposure to neutrons made walls, ceilings, floors, and remote handling equipment radioactive.",{"name":70,"@type":61,"acceptedAnswer":71},"Which alternative is recommended and how is it assessed?",{"text":72,"@type":64},"“Demolition/removal and off-site disposal” is identified as the preferred alternative versus “no action,” evaluated for relative effectiveness, implementability, and cost to support a removal action decision.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},514244,1791405490,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":55,"slug":125},"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":113,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":144,"preview_page_count":33,"preview_urls":145},3985741905716,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","BUILDING 4024  \nDECONTAMINATION AND DECOMMISSIONING ENGINEERING EVALUATION/COST ANALYSIS  \nPrepared by The Boeing Company for the Department of Energy  \nMay 1, 2007  \nThis Engineering Evaluation/Cost Analysis (EE/CA) has been prepared to fulfill the requirements of Section 300.415(b)(4)(i) of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) for a proposed non-time critical removal action. It summarizes the objectives ofthe removal action and evaluates alternatives to implement the decontamination and decommissioning (D&D) of the Department of Energy’s (DOE) Building 4024 situated within the Energy Technology Engineering Center (ETEC) at the Santa Susana Field Laboratory (SSFL) . SSFL is not on the National Priorities List; however, the U.S. Environmental Protection Agency (EPA) and DOE agreed in a joint policy statement (May 22, 1995) that DOE decommissioning activities will be conducted as non-time critical removal actions consistent with the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), effectively integrating EPA oversight responsibility, DOE lead agency responsibility, and state and stakeholder participation.  \nThis document provided an opportunity for interested persons to comment on the project objectives and the proposed removal action alternative for Building 4024 as required by Section 300.820(a) of the NCP.  \nThe Department of Energy is conducting the cleanup activities at ETEC pursuant to its authority under the Atomic Energy Act (AEA) . In addition, the removal action will be conducted in accordance with the 1995 joint DOE/EPA Policy Memorandum in a manner that is consistent with CERCLA.  \nAs the former Systems for Nuclear Auxiliary Power (SNAP) Environmental Test Facility (SETF), Building 4024 tested SNAP reactors in a simulated operational environment. SNAP reactors were originally developed and tested as a nuclear power source for space vehicles. Building 4024 currently consists of an above-grade high-bay and below-grade test vaults. As a result of exposure to neutrons from the reactors, the walls, ceiling, floor and remote handling equipment of the test cells have become radioactive.  \nThe scope of the Building 4024 D&D involves the complete removal of all above-and belowgrade structural components and any radiologically impacted soil that may exist within the facility’s footprint. The desired outcome of the removal action is a Building 4024 footprint that meets radiological standards of protectiveness for unrestricted use.  \nThis EE/CA identifies “demolition/removal and off-site disposal” as the preferred alternative to address the objectives ofthe Building 4024 D&D compared against a “no action” alternative. Both alternatives are evaluated for their relative effectiveness, implementability, and cost as the basis for a removal action decision.  \nThe public was encouraged to comment on the preferred alternative presented in this EE/CA during the public comment period. Following public comment, this document was used as the basis for an Action Memorandum to initiate implementation of the chosen D&D approach for Building 4024, demolition/removal and off-site disposal.  \nAcronyms and Abbreviations ...................................................................................... AA-1  \nGlossary ........................................................................................................................ G-1  \nSection 1.0 – Introduction ................................................................................................. 1  \nSection 2.0 – Removal Action Objectives ......................................................................... 8  \nSection 3.0 – Identification of Removal Action Alternatives ............................................ 11  \nSection 4.0 – Analysis of Alternatives ............................................................................. 13  \nSection 5.0 – Recommended Removal Action Alternative............","cbCaiu3F2Fr9mbwQ","https://ap.wps.com/l/cbCaiu3F2Fr9mbwQ","pdf",439121,"English","# Acronyms and Abbreviations\n# Glossary\n# Section 1.0 – Introduction\n# Section 2.0 – Removal Action Objectives\n# Section 3.0 – Identification of Removal Action Alternatives\n# Section 4.0 – Analysis of Alternatives\n# Section 5.0 – Recommended Removal Action Alternative\n# References\n# Appendix A – Identified ARARs or TBC Requirements for the Building 4024 D&D\n# Appendix B – Risks Associated with Implementation of the Preferred Alternative","[{\"question\":\"What is the purpose of the Engineering Evaluation/Cost Analysis for Building 4024?\",\"answer\":\"It fulfills regulatory requirements by summarizing removal action objectives and evaluating alternatives to implement decontamination and decommissioning for Building 4024.\"},{\"question\":\"What contamination led to the need for Building 4024 decontamination and decommissioning?\",\"answer\":\"As the former SNAP environmental test facility, Building 4024 tested SNAP reactors, and exposure to neutrons made walls, ceilings, floors, and remote handling equipment radioactive.\"},{\"question\":\"Which alternative is recommended and how is it assessed?\",\"answer\":\"“Demolition/removal and off-site disposal” is identified as the preferred alternative versus “no action,” evaluated for relative effectiveness, implementability, and cost to support a removal action decision.\"}]","BUILDING 4024 - DECONTAMINATION AND DECOMMISSIONING ENGINEERING EVALUATION/COST ANALYSIS - Engineering Evaluation | PDF",1791297904,76,[146,150,154,158],{"page_no":22,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/cbb843f4d00535932527e1c261ad03f0.webp",983,1272,{"page_no":26,"url":151,"width":152,"height":153},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1832966f47ca6055346a2e06b0074eb4.webp",982,1270,{"page_no":30,"url":155,"width":156,"height":157},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/264d8d3d02a3e666185bb012d2d90a39.webp",981,1269,{"page_no":33,"url":159,"width":160,"height":161},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/efa4d2ed703f5f473c5b1e77cdf71183.webp",980,1268]