[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-516399-105":59,"doc-detail-516399-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","brick-driveway-apron-detail-city-of-cambridge","Brick Driveway Apron Detail - City of Cambridge","","This technical document outlines the standard specifications and construction details for a brick driveway apron as required by the City of Cambridge. The provided diagram illustrates critical engineering parameters, including a 4-foot minimum width and a 1.5% maximum cross-slope for the apron. It specifies a 6-inch concrete base requirement for structural integrity. Additionally, the document defines slope limitations for the transition areas, including 7.5% maximum gradients for side slopes and curb integration details involving flush and vertical granite curbs. These standardized guidelines ensure that driveway apron construction remains compliant with local civil infrastructure regulations, prioritizing accessibility and safety for pedestrians and vehicles alike. The detail serves as a mandatory reference for municipal contractors and engineers to ensure consistency across urban residential driveway interfaces throughout the city region.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":57,"@type":76,"position":81},"https://docshare.wps.com/document/general/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/brick-driveway-apron-detail-city-of-cambridge/516399/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/brick-driveway-apron-detail-city-of-cambridge/516399.png","ImageObject",300,407,{"name":92,"@type":93},"CatatanPagi","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-17","2026-10-06",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the required thickness for the concrete base of the driveway apron?","Question",{"text":112,"@type":113},"The construction specification requires a 6-inch concrete base for the driveway apron.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What is the maximum allowable slope for the driveway apron?",{"text":117,"@type":113},"The apron must maintain a maximum slope of 1.5% for the primary section, with side transition slopes allowed up to a maximum of 7.5%.",{"name":119,"@type":110,"acceptedAnswer":120},"What is the minimum width requirement for the driveway apron?",{"text":121,"@type":113},"The document specifies a minimum width of 4 feet for the driveway apron structure.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},516399,1791512428,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":56,"category_name":57,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":14},962090894170,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","BRICK DRIVEWAY APRON DETAILCITY OF CAMBRIDGE STANDARD SPECIFICATIONS AND DETAILSSCALE:N.T.S.OF ISSUE:SPEC.SECTION REF\\#:025242524.10","cbCair6CAW62lCsJ","https://ap.wps.com/l/cbCair6CAW62lCsJ","pdf",46489,"English","# Technical Specifications\n## Driveway Construction Requirements\n## Slope and Gradient Standards\n## Curb Integration Details","[{\"question\":\"What is the required thickness for the concrete base of the driveway apron?\",\"answer\":\"The construction specification requires a 6-inch concrete base for the driveway apron.\"},{\"question\":\"What is the maximum allowable slope for the driveway apron?\",\"answer\":\"The apron must maintain a maximum slope of 1.5% for the primary section, with side transition slopes allowed up to a maximum of 7.5%.\"},{\"question\":\"What is the minimum width requirement for the driveway apron?\",\"answer\":\"The document specifies a minimum width of 4 feet for the driveway apron structure.\"}]","Brick Driveway Apron Detail - City of Cambridge | PDF",1791330980]