[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650946-105":59,"doc-detail-650946-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","breadsall-church-new-1","Breadsall-Church-NEW-1","","Proposed Ground Floor Plan for All Saints Church, Breadsall, detailing layout and fit-out changes across key zones including the nave, chancel, vestry, choir area, kitchen, and south porch. The plan specifies removals of existing pews and plinths, reusing a retained historic door, raising the tower floor to align with the nave, and adding new fitted cabinetry for storage. It also includes secondary glazing and light transfer elements such as sun tubes, draft excluder curtains, revised seating and circulation measures, and modifications to doors and paving to address accessibility and trip hazards.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/breadsall-church-new-1/650946/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/breadsall-church-new-1/650946.png","ImageObject",300,407,{"name":92,"@type":93},"SALUTone","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What main changes are specified in the nave and seating area?","Question",{"text":112,"@type":113},"The plan calls for removing existing pews and pew plinths, exposing and resetting a concealed stone plinth, and adjusting circulation and access elements such as door and flooring modifications to reduce trip hazards.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does the proposal address daylighting and draft control?",{"text":117,"@type":113},"It includes secondary glazing and overhead glazing to allow natural light into the kitchen, potential sun tubes to transfer natural light into the corridor, and a line of potential curtains installed over an archway to function as a draft excluder.",{"name":119,"@type":110,"acceptedAnswer":120},"What storage and cabinetry updates are included?",{"text":121,"@type":113},"New fitted cabinetry is proposed (600mm deep) to accommodate table and chair storage plus robes and toys, with high-level storage above, and additional full-height cabinets to the northern kitchen wall for crockery and related items.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650946,1792852836,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},5909897206756,"https://ap-avatar.wpscdn.com/avatar/5600152dbe4a7e99502?x-image-process=image/resize,m_fixed,w_180,h_180&k=1792654152478566863","| | © This drawing and the building works depicted are the copyright of the Architect and may not be reproduced except with written consent. Figured dimensions only are to be taken from this drawing. All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. Lathams are to be advised of any variation between drawings and site conditions. |  |  |  |  |  |  |  |  |  |  | | |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|   1685   |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| Retained historic door\u003Cbr>mounted on wall ~~ ~~\u003Cbr>\u003Cbr>ws 3240 wh 6000\u003Cbr>Furniture storage area-Howe\u003Cbr>ch 6100\u003Cbr>Choir\u003Cbr>40/4 trolleys shown ( x 2\u003Cbr>trolleys = capacity for 80\u003Cbr>chairs) ~~ ~~ |  |  | |  |  | Line of potential curtains installed to function as draft excluder. To be installed over archway.\u003Cbr>Proposed stair-gate and new edge protection to steps\u003Cbr>Raise floor in Tower to align with Nave, forming additional step to West Door.\u003Cbr>New fitted cabinetry 600mm deep to accomodate table and chair storage plus robes and toys. High level storage above. |  | Moor Street\u003Cbr>\u003Cbr>Secondary glazing and overhead window to allow natural light to enter kitchen\u003Cbr>300mm deep full height \u003Cbr>\u003Cbr>cabinets to northern wall of kitchen for storage of crockery etc. |  |  |  |  |  |\n| Remove existing pews and pew plinths. Expose concealed stone plinth to former font and re-set at new level, flush with surrounding\u003Cbr>floor. ~~ ~~\u003Cbr>\u003Cbr>South Porch |  | \u003Cbr>dh 2035 ah 4755\u003Cbr>Seating\u003Cbr>Nave |  | 1000mm wide hatch with 300mm shelf to outer face |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |   910   | \u003Cbr>1000 |  | Plant 2 m² |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  | Turning circle provided within corridor\u003Cbr>Modify existing door by trimming c. 150mm from bottom edge and infill existing section of lower flooring internally to remove trip hazard. Modify existing external paving levels to achieve gentle gradient from highway to existing door without requirement for handrails.\u003Cbr>WC waste pipe boxed in Potential sun tubes to transfer natural light from western window into corridor and 2 no. WCs |  |  | Indicative location of manhole cover |  |  |\n|  |  |  |  | \u003Cbr>|  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  | Existing screen to choir vestry to be modified to suit enlarged area. Increase height by use of clerestory glazing and install new ceiling canopy to ensure sound proofing of WCs. |  |  |  |  |  |\n| North Aisle |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| (area not surveyeddrawn indicatively) |  |  |  | (area not surveyeddrawn indicatively) |  |  |  |  |  |  |  |  |  |\n| P01 SY Amended Design 29/08/24\u003Cbr>Rev Drawn Revision Description Date |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| Ground Floor Plan\u003Cbr>1 : 100 | Chancel\u003Cbr>(area not surveyeddrawn indicatively)\u003Cbr>|  |  | Vestry and WC\u003Cbr>(area not surveyed\u003Cbr>drawn indicatively)\u003Cbr>0m 2m 4m 6m 8m 10m\u003Cbr>\u003Cbr>Scale 1:100 @ A2 |  |  |  |  | Status | S3 |  |  |  |\n|  |  |  |  |  |  |  |  |  | Nottingham Derby 50 St Mary's Gate Nottingham NG1 1QA 1 College Place\u003Cbr>Derby DE1 3DY +44 (0)115 648 5012 +44 (0)1332 365 777 London\u003Cbr>70 Cowcross Street\u003Cbr>London EC1M 6EJ [enquiries@lathams.uk.com](enquiries@lathams.uk.com)[ ](enquiries@lathams.uk.com)[lathams.uk.com](lathams.uk.com) Project\u003Cbr>All Saints Church, Breadsall Client\u003Cbr>The PCC of All Saints Church, Breadsall Drawing Title Proposed Ground Floor Plan Drawing Number Status Revision 2200 S3 P01 File Name\u003Cbr>Project-Originator-Function-Spatial-Form-Discipline-Drawing Number-Status-Revision\u003Cbr>Code–LAT–2200–S3–P01 Scale Date Drawn Checked 1 : 100 29/08/24 SY MW Lathams Job Number Original Size 1000 A2\u003Cbr>© Derek Latham + Co. Ltd |  |  |  |  |","cbCaiqNYV3Jgng8b","https://ap.wps.com/l/cbCaiqNYV3Jgng8b","pdf",1224941,"English","# Proposed Ground Floor Plan\n## Key Areas and Layout\n## Fit-Out and Service Provisions","[{\"question\":\"What main changes are specified in the nave and seating area?\",\"answer\":\"The plan calls for removing existing pews and pew plinths, exposing and resetting a concealed stone plinth, and adjusting circulation and access elements such as door and flooring modifications to reduce trip hazards.\"},{\"question\":\"How does the proposal address daylighting and draft control?\",\"answer\":\"It includes secondary glazing and overhead glazing to allow natural light into the kitchen, potential sun tubes to transfer natural light into the corridor, and a line of potential curtains installed over an archway to function as a draft excluder.\"},{\"question\":\"What storage and cabinetry updates are included?\",\"answer\":\"New fitted cabinetry is proposed (600mm deep) to accommodate table and chair storage plus robes and toys, with high-level storage above, and additional full-height cabinets to the northern kitchen wall for crockery and related items.\"}]","Breadsall-Church-NEW-1 | PDF"]