[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-112201-en":3,"doc-seo-112201-105":28,"detail-sidebar-cat-0-en-105":89},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":20,"language":21,"language_code":22,"site_id":23,"html_lang":22,"table_of_contents":24,"faqs":25,"seo_title":13,"seo_description":14,"update_tm":26,"read_time":27},112201,8796095360427,"Lucas Martin","https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d",8,"Research & Report","Brazil - Energy Transition for the Northeast Region of Brazil Project - Approval on an Absence-of-Objection Basis - May 15, 2026","Approval was granted on an absence-of-objection basis for the Energy Transition for the Northeast Region of Brazil Project in Brazil on Friday, May 15, 2026. The Executive Directors approved a US$500 million loan with a sovereign guarantee from the Federative Republic of Brazil, a US$30 million concessional loan from the Clean Technology Fund (CTF), and a US$10 million grant from the Livable Planet Fund (LPF) to Banco do Nordeste do Brasil S.A. Terms followed the President’s Memorandum (R2026-0095).","Public Disclosure Authorized Public Disclosure Authorized  \nThe following item has been approved on an Absence-of-Objection Basis  \non Friday, May 15, 2026  \nBrazil  \nEnergy Transition for the Northeast Region of Brazil Project  \nThe Executive Directors approved a loan in the amount of US$500 million with a sovereign guarantee from the Federative Republic of Brazil; a concessional loan in the amount of US$30 million from the Clean Technology Fund (CTF); and a grant in the amount of US$10 million from the Livable Planet Fund (LPF) to Banco do Nordeste do Brasil S.A. for an Energy Transition for the Northeast Region of Brazil Project on the terms and conditions set out in the President’s Memorandum (R2026-0095, dated April 28, 2026) . Lailee Jane Moghtader wished to be recorded as objecting.","cbCaig6Yxlk0EC3B","https://ap.wps.com/l/cbCaig6Yxlk0EC3B","pdf",106609,1,"English","en",105,"# Approval on Absence-of-Objection Basis\n## Project and Financing Terms\n## Documentation Reference and Timing","[{\"question\":\"What was approved on an absence-of-objection basis on May 15, 2026?\",\"answer\":\"The Energy Transition for the Northeast Region of Brazil Project in Brazil was approved on an absence-of-objection basis.\"},{\"question\":\"What financing components were approved for the project?\",\"answer\":\"A US$500 million loan with sovereign guarantee, a US$30 million concessional loan from the Clean Technology Fund (CTF), and a US$10 million grant from the Livable Planet Fund (LPF) were approved.\"},{\"question\":\"How were the approval terms determined?\",\"answer\":\"The terms and conditions were set out in the President’s Memorandum (R2026-0095, dated April 28, 2026).\"}]",1784493680,3,{"code":4,"msg":29,"data":30},"ok",{"site_id":23,"language":22,"slug":31,"title":13,"keywords":32,"description":14,"schema_data":33,"social_meta":84,"head_meta":86,"extra_data":88,"updated_unix":26},"brazil-energy-transition-for-the-northeast-region-of-brazil-project-approval-on-an-absence-of-objection-basis-may-15-2026","",{"@graph":34,"@context":83},[35,51,66],{"@type":36,"itemListElement":37},"BreadcrumbList",[38,42,46,48],{"item":39,"name":40,"@type":41,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":43,"name":44,"@type":41,"position":45},"https://docshare.wps.com/document/","Document",2,{"item":47,"name":12,"@type":41,"position":27},"https://docshare.wps.com/document/research-report/",{"item":49,"name":13,"@type":41,"position":50},"https://docshare.wps.com/document/brazil-energy-transition-for-the-northeast-region-of-brazil-project-approval-on-an-absence-of-objection-basis-may-15-2026/112201/",4,{"url":49,"name":13,"@type":52,"author":53,"headline":13,"publisher":55,"fileFormat":58,"inLanguage":22,"description":14,"dateModified":59,"datePublished":60,"encodingFormat":58,"isAccessibleForFree":61,"interactionStatistic":62},"DigitalDocument",{"name":9,"@type":54},"Person",{"url":39,"name":56,"@type":57},"DocShare","Organization","application/pdf","2026-07-22","2026-07-19",true,{"@type":63,"interactionType":64,"userInteractionCount":20},"InteractionCounter",{"@type":65},"ViewAction",{"@type":67,"mainEntity":68},"FAQPage",[69,75,79],{"name":70,"@type":71,"acceptedAnswer":72},"What was approved on an absence-of-objection basis on May 15, 2026?","Question",{"text":73,"@type":74},"The Energy Transition for the Northeast Region of Brazil Project in Brazil was approved on an absence-of-objection basis.","Answer",{"name":76,"@type":71,"acceptedAnswer":77},"What financing components were approved for the project?",{"text":78,"@type":74},"A US$500 million loan with sovereign guarantee, a US$30 million concessional loan from the Clean Technology Fund (CTF), and a US$10 million grant from the Livable Planet Fund (LPF) were approved.",{"name":80,"@type":71,"acceptedAnswer":81},"How were the approval terms determined?",{"text":82,"@type":74},"The terms and conditions were set out in the President’s Memorandum (R2026-0095, dated April 28, 2026).","https://schema.org",{"og:url":49,"og:type":85,"og:title":13,"og:site_name":56,"og:description":14},"article",{"robots":87,"canonical":49},"index,follow",{"doc_id":7,"site_id":23},{"code":4,"msg":5,"data":90},[91,95,99,103,108,113,118,121,126,129,133],{"id":20,"doc_module":4,"doc_module_name":44,"category_name":92,"show_sort_weight":93,"slug":94},"Story & Novel",90,"story-novel",{"id":45,"doc_module":4,"doc_module_name":44,"category_name":96,"show_sort_weight":97,"slug":98},"Literature",80,"literature",{"id":50,"doc_module":4,"doc_module_name":44,"category_name":100,"show_sort_weight":101,"slug":102},"Exam",70,"exam",{"id":104,"doc_module":4,"doc_module_name":44,"category_name":105,"show_sort_weight":106,"slug":107},5,"Comic",60,"comic",{"id":109,"doc_module":4,"doc_module_name":44,"category_name":110,"show_sort_weight":111,"slug":112},6,"Technology",50,"technology",{"id":114,"doc_module":4,"doc_module_name":44,"category_name":115,"show_sort_weight":116,"slug":117},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":44,"category_name":12,"show_sort_weight":119,"slug":120},30,"research-report",{"id":122,"doc_module":4,"doc_module_name":44,"category_name":123,"show_sort_weight":124,"slug":125},9,"Religion & Spirituality",20,"religion-spirituality",{"id":124,"doc_module":4,"doc_module_name":44,"category_name":127,"show_sort_weight":124,"slug":128},"World Cup","world-cup",{"id":130,"doc_module":4,"doc_module_name":44,"category_name":131,"show_sort_weight":130,"slug":132},10,"Lifestyle","lifestyle",{"id":134,"doc_module":4,"doc_module_name":44,"category_name":135,"show_sort_weight":104,"slug":136},19,"General","general"]