[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-676049-105":3,"detail-sidebar-cat-0-en-105":79,"doc-detail-676049-en":129},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":72,"head_meta":74,"extra_data":76,"updated_unix":78},105,"en","bps-mx-rs-series-scpi-programming-manual-rev-ab","BPS / MX / RS Series SCPI Programming Manual - Rev AB","","BPS / MX / RS Series SCPI Programming Manual describes AMETEK Programmable Power’s SCPI programming reference for AC power systems across BPS Series, MX Series I/II, and RS Series. It includes manual identification information such as part number 7003-961 and revision AB, along with publisher and trademark and copyright notices for 2003–2017. The document also provides important safety instructions covering hazardous voltages, ESD precautions, grounding requirements, de-energizing procedures, and safe servicing practices.",{"@graph":14,"@context":71},[15,34,54],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/bps-mx-rs-series-scpi-programming-manual-rev-ab/676049/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":48,"encodingFormat":47,"isAccessibleForFree":49,"interactionStatistic":50},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/bps-mx-rs-series-scpi-programming-manual-rev-ab/676049.png","ImageObject",300,407,{"name":42,"@type":43},"miraaa_2004","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-04",true,{"@type":51,"interactionType":52,"userInteractionCount":4},"InteractionCounter",{"@type":53},"ViewAction",{"@type":55,"mainEntity":56},"FAQPage",[57,63,67],{"name":58,"@type":59,"acceptedAnswer":60},"What safety checks are required before applying power to the system?","Question",{"text":61,"@type":62},"Verify the product is configured properly for the specific application before applying power. Ensure facility AC input power is de-energized prior to connecting or disconnecting any cable.","Answer",{"name":64,"@type":59,"acceptedAnswer":65},"How should users handle ESD-sensitive parts during installation?",{"text":66,"@type":62},"Follow ESD Safety Procedures when installing equipment. Use appropriate precautions because electrostatic discharges may cause damage.",{"name":68,"@type":59,"acceptedAnswer":69},"What grounding steps are emphasized for personnel and equipment safety?",{"text":70,"@type":62},"Ensure the AC power line ground is connected properly to the Power Rack input connector or chassis. Ground other power ground lines for application and maintenance equipment as well.","https://schema.org",{"og:url":32,"og:type":73,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":75,"canonical":32},"index,follow",{"doc_id":77,"site_id":7},676049,1793774724,{"code":4,"msg":80,"data":81},"success",[82,86,90,94,99,103,108,113,118,121,125],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":83,"show_sort_weight":84,"slug":85},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":87,"show_sort_weight":88,"slug":89},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},"Exam",70,"exam",{"id":95,"doc_module":4,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},5,"Comic",60,"comic",{"id":100,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":101,"slug":102},6,50,"technology",{"id":104,"doc_module":4,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},7,"Healthcare",40,"healthcare",{"id":109,"doc_module":4,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},8,"Research & Report",30,"research-report",{"id":114,"doc_module":4,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},9,"Religion & Spirituality",20,"religion-spirituality",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":119,"show_sort_weight":116,"slug":120},"World Cup","world-cup",{"id":122,"doc_module":4,"doc_module_name":25,"category_name":123,"show_sort_weight":122,"slug":124},10,"Lifestyle","lifestyle",{"id":126,"doc_module":4,"doc_module_name":25,"category_name":127,"show_sort_weight":95,"slug":128},19,"General","general",{"code":4,"msg":80,"data":130},{"doc_id":77,"user_id":131,"nickname":42,"user_avatar":132,"doc_module":4,"category_id":100,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":138,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":78,"read_time":143},962094249165,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","BPS / MX / RS Series SCPI Programming Manual  \n(Including MX Series I / Series II)  \n7003-961 Rev AB [www.programmablepower.com](www.programmablepower.com)  \nAMETEK Programmable Power BPS / MX / RS Series SCPI Programming Manual  \nSCPI Programming Reference Manual  \n• BPS Series AC Power Systems  \n• MX Series I AC/DC Power Systems  \n• MX Series II AC/DC Power Systems  \n• RS Series AC/DC Power Systems  \n2 Manual P/N 7003-961 Rev AB  \nBPS / MX / RS Series SCPI Programming Manual AMETEK Programmable Power  \nAbout AMETEK  \nAMETEK Programmable Power, Inc. , a Division of AMETEK, Inc. , is a global leader in the design and manufacture of precision, programmable power supplies for R&D, test and measurement, process control, power bus simulation and power conditioning applications across diverse industrial segments. From bench top supplies to rack-mounted industrial power subsystems, AMETEK Programmable Power is the proud manufacturer of Elgar, Sorensen, California Instruments and Power Ten brand power supplies.  \nAMETEK, Inc. is a leading global manufacturer of electronic instruments and electromechanical devices with annualized sales of $3.3 billion. The Company has over 11,000 colleagues working atmore than 80 manufacturing facilities and more than 80 sales and service centers in the United States and around the world.  \nTrademarks  \nAMETEK is a registered trademark of AMETEK, Inc. California Instruments is a trademark owned by AMETEK, Inc. Other trademarks, registered trademarks, and product names are the property of their respective owners and are used herein for identification purposes only.  \nNotice of Copyright  \nBPS / MX / RS Series Programming Manual © 2003-2017 AMETEK Programmable Power, Inc. All rights reserved.  \nExclusion for Documentation  \nUNLESS SPECIFICALLY AGREED TO IN WRITING, AMETEK PROGRAMMABLE POWER, INC. (“AMETEK”):  \n(a) MAKES NO WARRANTY AS TO THE ACCURACY, SUFFICIENCY OR SUITABILITY OF ANY TECHNICAL OR OTHER INFORMATION PROVIDED IN ITS MANUALS OR OTHER DOCUMENTATION.  \n(b) ASSUMES NO RESPONSIBILITY OR LIABILITY FOR LOSSES, DAMAGES, COSTS OR EXPENSES, WHETHER SPECIAL, DIRECT, INDIRECT, CONSEQUENTIAL OR INCIDENTAL, WHICH MIGHT ARISE OUT OF THE USE OF SUCH INFORMATION. THE USE OF ANY SUCH INFORMATION WILL BE ENTIRELY AT THE USER’S RISK, AND  \n(c) REMINDS YOU THAT IF THIS MANUAL IS IN ANY LANGUAGE OTHER THAN ENGLISH, ALTHOUGH STEPS HAVE BEEN TAKEN TO MAINTAIN THE ACCURACY OF THE TRANSLATION, THE ACCURACY CANNOT BE GUARANTEED. APPROVED AMETEK CONTENT IS CONTAINED WITH THE ENGLISH LANGUAGE VERSION, WHICH IS POSTED AT WWW. PROGRAMMABLEPOWER.COM.  \nDate and Revision  \nApril 2017-Revision AB  \nPart Number  \n7003-961  \nContact Information  \nTelephone: 800 733 5427 (toll free in North America)  \n858 450 0085 (direct)  \nFax: 858 458 0267  \nEmail: [sales@programmablepower.com](sales@programmablepower.com)  \n[service@programmablepower.com](service@programmablepower.com)[ ](service@programmablepower.com)Web: [www.programmablepower.com](www.programmablepower.com)  \nManual P/N 7003-961 Rev. AB 3  \nAMETEK Programmable Power BPS / MX / RS Series SCPI Programming Manual  \nImportant Safety Instructions  \nBefore applying power to the system, verify that your product is configured properly for your particular application.  \n\n| \u003Cbr>Hazardous voltages may be present when covers are removed. Qualified\u003Cbr>personnel must use extreme caution when servicing this equipment. WARNING Circuit boards, test points, and output voltages also may be floating above\u003Cbr>(below) chassis ground. |\n| --- |\n| \u003Cbr>WARNING\u003Cbr>The equipment used contains ESD sensitive parts. When installing equipment, follow ESD Safety Procedures. Electrostatic discharges might cause damage to the equipment. |\n\nOnly qualified personnel who deal with attendant hazards in power supplies, are allowed to perform installation and servicing.  \nEnsure that the AC power line ground is connected properly to the Power Rack input connector or chassis. Similarly, other power ground li","cbCaiprDjVL0Iukd","https://ap.wps.com/l/cbCaiprDjVL0Iukd","pdf",1259567,226,"English","# Important Safety Instructions\n## Hazardous voltages and safe servicing\n## ESD sensitive parts precautions\n## Grounding and de-energizing requirements\n## Output labeling for hazardous voltages","[{\"question\":\"What safety checks are required before applying power to the system?\",\"answer\":\"Verify the product is configured properly for the specific application before applying power. Ensure facility AC input power is de-energized prior to connecting or disconnecting any cable.\"},{\"question\":\"How should users handle ESD-sensitive parts during installation?\",\"answer\":\"Follow ESD Safety Procedures when installing equipment. Use appropriate precautions because electrostatic discharges may cause damage.\"},{\"question\":\"What grounding steps are emphasized for personnel and equipment safety?\",\"answer\":\"Ensure the AC power line ground is connected properly to the Power Rack input connector or chassis. Ground other power ground lines for application and maintenance equipment as well.\"}]","BPS / MX / RS Series SCPI Programming Manual - Rev AB | PDF",570]