[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-676746-105":59,"doc-detail-676746-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","boss-scoring-service-and-technical-manual-issued-11022001","BOSS Scoring Service and Technical Manual - Issued 11/02/2001","","Service and technical manual for installing the BOSS scoring system used with AMF bowling products. Covers document use guidance, safety precautions, prerequisites, and references, then provides structured installation procedures for cable installation, monitor installation, bowler terminal installation variants, camera installation, the machine interface (MI) box, and cluster switch setup for Brunswick pinsetters. Concludes with installation checkout, BOSS scoring system tests, front desk and back office checks, and system layout verification.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/boss-scoring-service-and-technical-manual-issued-11022001/676746/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/boss-scoring-service-and-technical-manual-issued-11022001/676746.png","ImageObject",300,407,{"name":92,"@type":93},"miraaa_2004","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-04",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What safety precautions must be followed before installing or modifying AMF equipment?","Question",{"text":111,"@type":112},"Read the safety precautions before attempting installation or modification. Failure to follow procedures may cause severe personal injury, fire, or permanent property damage.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What should be verified in the shipment before starting installation?",{"text":116,"@type":112},"Check the shipment against the packing list on the next page to ensure all parts are included, and report any missing items to AMF Technical Support.",{"name":118,"@type":109,"acceptedAnswer":119},"Which installation areas are covered by the manual?",{"text":120,"@type":112},"The manual covers cable installation, monitor installation, bowler terminal installation, camera installation, the machine interface (MI) box, cluster switch installation, and final installation checkout including system tests and layout verification.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},676746,1793776593,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},962094249165,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| \u003Cbr>\u003Cbr>Signature Series\u003Cbr>Service & Technical\u003Cbr>Manual\u003Cbr>Issued: 11/02/01 P/N: 400-286-009 Rev New |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| AMF Bowling Products, Inc.,• Tech Support • (International) 804 730-4343 • (Domestic) 1-800-843-0682 • (Fax) 804-730-4390 |  |  |  |  |  |  |  |  |  |  |  |  |\n| Copyright © | 2001, | AMF | Bowling | Products | , Inc., | 8100 | AMF | Drive, | Mechanicsville, | Virginia | 23111 |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n\nALL RIGHTS RESERVED  \nAll rights to this service and technical manual including the diagrams, figures, and technical specifications are the property of AMF Bowling, Inc. Reproduction or transmission of any of the material contained in this manual without the prior written permission of AMF Bowling, Inc. is strictly prohibited. All of the product information in this manual was carefully prepared based on the latest information available and was believed to be correct at the time of printing. While every effort has been made to ensure accuracy, this publication may inadvertently contain typographical errors, inaccuracies, or errors of omission. AMF Bowling, Inc. cannot be held responsible for any claims resulting from these errors.  \nDOCUMENT UPDATES  \nAMF Bowling, Inc. reserves the right to revise and/or update this manual at any time without obligation to notify any person or entity of such revision. The document number, revision level, and date below indicate the edition of this manual.  \nTRADEMARK NOTICES  \nAMF and the AMF logo are the registered trademarks of AMF Bowling, Inc. Brunswick is the registered trademark of the Brunswick Corporation.  \nCopyright © 2001 AMF Bowling, Inc.  \nDocument \\#400-286-009 Rev. New  \nIssued: 11/02/2001  \nAMF Bowling Products, Inc.  \n8100 AMF Drive  \nMechanicsville, VA. 23111  \nTable of Contents  \nSECTION PAGE  \nHOW TO USE THIS MANUAL 1  \nINTRODUCTION 1  \n1. GENERAL INFORMATION  \n1.1 References 3  \n1.2 List of Illustrations 3  \n1.3 Precautions 3  \n1.4 Prerequisites 4  \n1.5 Parts Lists and Tools Required 4  \n1.6 Abbreviations 4  \n1.7 Glossary 5  \n1.8 Nomenclature 5  \n2. CABLE INSTALLATION  \n2.1 General 7  \n2.2 Wire and Cable Requirements 7  \n2.3 Ground Wire Requirements 7  \n2.4 Distribution Panel Requirements 8  \n2.5 Surge Suppressor Installation 8  \n2.6 Monitor Power Specification 8  \n2.7 Audio/Video Equipment Cables 8  \n2.8 Measurement of System Grounds 9  \n3. MONITOR INSTALLATION  \n3.1 General 11  \n3.2 Preparing Overhead Structure for Monitors 11  \n3.3 Mounting Monitors Onto Overhead Structure 12  \n3.4 Mounting the CPU on the Curtain Wall 13  \n3.5 Connecting Monitor and CPU Cables 13  \n3.6 Final Steps in Monitor Installation 14  \n4. BOWLER TERMINAL INSTALLATION  \n4.1 Standard Bowler Terminal Console Installation 15  \n4.2 Standard Bowler Terminal Console (With Intercom Upgrade) 16  \n4.3 Standard Bowler Terminal Console (With LCD Display Upgrade) 19  \n4.4 Lower Monitor Bowler Terminal Console Installation 21  \n4.5 Switch Configuration Settings 22  \n4.6 Setup and Testing 24  \nTable of Contents  \n5. CAMERA INSTALLATION  \n5.1 General 25  \n5.2 Mounting the Pin Sensor 25  \n5.3 Height Adjustment and Alignment 27  \n5.4 Horizontal and Vertical Alignment 28  \n6. INSTALLING MACHINE INTERFACE (MI) BOX  \n6.1 General 33  \n6.2 Machine Interface Box Mounting 33  \n6.3 Connecting AMF Ball Detector To Pinspotter 34  \n7. CLUSTER SWITCH INSTALLATIONI (for use with Brunswick pinsetters)  \n7.1 Installing Cluster Switch 35  \n8. INSTALLATION CHECK OUT  \n8.1 General 37  \n8.2 BOSS􀀂 Scoring System Tests 37  \n8.3 Front Desk and Back Office Tests 38  \n8.4 System Layout 38  \nList of Figures  \nFigure 3-1 Mounting Chain and Turnbuckle 12  \nFigure 3-2 CPU Cable Connections 13  \nFigure 4-1 Example Placement For Standard Bowler Terminal 15  \nFigure 4-2 Removing Icon Keyboard From Keyboard Plate 17  \nFigure 4-3 Attaching and Soldering Wires 17  \nFigure 4-4 Front Cover Of Bowler Terminal Ex","cbCaikJwIw6VtTrS","https://ap.wps.com/l/cbCaikJwIw6VtTrS","pdf",142276,36,"English","# HOW TO USE THIS MANUAL\n# INTRODUCTION\n# 1. GENERAL INFORMATION\n## 1.1 References\n## 1.2 List of Illustrations\n## 1.3 Precautions\n## 1.4 Prerequisites\n## 1.5 Parts Lists and Tools Required\n## 1.6 Abbreviations\n## 1.7 Glossary\n## 1.8 Nomenclature\n# 2. CABLE INSTALLATION\n## 2.1 General\n## 2.2 Wire and Cable Requirements\n## 2.3 Ground Wire Requirements\n## 2.4 Distribution Panel Requirements\n## 2.5 Surge Suppressor Installation\n## 2.6 Monitor Power Specification\n## 2.7 Audio/Video Equipment Cables\n## 2.8 Measurement of System Grounds\n# 3. MONITOR INSTALLATION\n## 3.1 General\n## 3.2 Preparing Overhead Structure for Monitors\n## 3.3 Mounting Monitors Onto Overhead Structure\n## 3.4 Mounting the CPU on the Curtain Wall\n## 3.5 Connecting Monitor and CPU Cables\n## 3.6 Final Steps in Monitor Installation\n# 4. BOWLER TERMINAL INSTALLATION\n## 4.1 Standard Bowler Terminal Console Installation\n## 4.2 Standard Bowler Terminal Console (With Intercom Upgrade)\n## 4.3 Standard Bowler Terminal Console (With LCD Display Upgrade)\n## 4.4 Lower Monitor Bowler Terminal Console Installation\n## 4.5 Switch Configuration Settings\n## 4.6 Setup and Testing\n# 5. CAMERA INSTALLATION\n## 5.1 General\n## 5.2 Mounting the Pin Sensor\n## 5.3 Height Adjustment and Alignment\n## 5.4 Horizontal and Vertical Alignment\n# 6. INSTALLING MACHINE INTERFACE (MI) BOX\n## 6.1 General\n## 6.2 Machine Interface Box Mounting\n## 6.3 Connecting AMF Ball Detector To Pinspotter\n# 7. CLUSTER SWITCH INSTALLATION\n## 7.1 Installing Cluster Switch\n# 8. INSTALLATION CHECK OUT\n## 8.1 General\n## 8.2 BOSS Scoring System Tests\n## 8.3 Front Desk and Back Office Tests\n## 8.4 System Layout","[{\"question\":\"What safety precautions must be followed before installing or modifying AMF equipment?\",\"answer\":\"Read the safety precautions before attempting installation or modification. Failure to follow procedures may cause severe personal injury, fire, or permanent property damage.\"},{\"question\":\"What should be verified in the shipment before starting installation?\",\"answer\":\"Check the shipment against the packing list on the next page to ensure all parts are included, and report any missing items to AMF Technical Support.\"},{\"question\":\"Which installation areas are covered by the manual?\",\"answer\":\"The manual covers cable installation, monitor installation, bowler terminal installation, camera installation, the machine interface (MI) box, cluster switch installation, and final installation checkout including system tests and layout verification.\"}]","BOSS Scoring Service and Technical Manual - Issued 11/02/2001 | PDF",91]