[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-440759-105":3,"detail-sidebar-cat-0-en-105":76,"doc-detail-440759-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":69,"head_meta":71,"extra_data":73,"updated_unix":75},105,"en","blueoval-sk-llc-air-quality-permit-v-21-041-r2","BlueOval SK, LLC - Air Quality Permit V-21-041 R2","","Air Quality Permit issued by the Kentucky Energy and Environment Cabinet, Division for Air Quality, authorizing BlueOval SK, LLC to operate electrode manufacturing equipment under specific Title V/Title I requirements including PSD. The permit lists permittee and source information, issuance and expiration dates, revision history, and a structured set of sections covering permit authorization, emission points and units, insignificant activities, emission limits and testing, control equipment, monitoring and reporting, general provisions, alternate operating scenarios, and a compliance schedule. It includes detailed emission source and regulation references for building processes.",{"@graph":14,"@context":68},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/blueoval-sk-llc-air-quality-permit-v-21-041-r2/440759/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/blueoval-sk-llc-air-quality-permit-v-21-041-r2/440759.png","ImageObject",300,407,{"name":42,"@type":43},"McGucket","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-02","2026-09-29",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64],{"name":59,"@type":60,"acceptedAnswer":61},"Who is the permittee and what activity does this permit cover?","Question",{"text":62,"@type":63},"The permittee is BlueOval SK, LLC. The activity is identified as APE20240004 and relates to electrode manufacturing processes under Title V/Title I requirements including PSD and operating/construction permissions.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Where can the permit’s main requirements be found within the document?",{"text":67,"@type":63},"The permit is organized into sections including permit authorization, emission points and units with applicable regulations and operating conditions, insignificant activities, emission limitations and testing, control equipment requirements, monitoring/recordkeeping/reporting, general provisions, alternate operating scenarios, and a compliance schedule.","https://schema.org",{"og:url":32,"og:type":70,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":72,"canonical":32},"index,follow",{"doc_id":74,"site_id":7},440759,1790982008,{"code":4,"msg":77,"data":78},"success",[79,83,87,91,96,101,106,110,115,118,122],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":80,"show_sort_weight":81,"slug":82},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Exam",70,"exam",{"id":92,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},5,"Comic",60,"comic",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},6,"Technology",50,"technology",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},7,"Healthcare",40,"healthcare",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":108,"slug":109},8,30,"research-report",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":112,"show_sort_weight":113,"slug":114},9,"Religion & Spirituality",20,"religion-spirituality",{"id":113,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":113,"slug":117},"World Cup","world-cup",{"id":119,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":119,"slug":121},10,"Lifestyle","lifestyle",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":92,"slug":125},19,"General","general",{"code":4,"msg":77,"data":127},{"doc_id":74,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":4,"category_id":107,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":141},1236954412713,"https://us-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Commonwealth of Kentucky  \nEnergy and Environment Cabinet  \nDepartment for Environmental Protection  \nDivision for Air Quality  \n300 Sower Boulevard, 2nd Floor  \nFrankfort, Kentucky 40601  \n(502) 564-3999  \nDraft  \nAIR QUALITY PERMIT  \nIssued under 401 KAR 52:020  \nPermittee Name: BlueOval SK, LLC  \nMailing Address: 2022 Battery Park Drive, Glendale, KY 42740  \nSource Name: BlueOval SK, LLC  \nMailing Address: 2022 Battery Park Drive  \nGlendale, KY 42740  \nSource Location: Same as above  \nPermit: V-21-041 R2  \nAgency Interest: 170550  \nActivity: APE20240004  \nReview Type: Title V / Title I – PSD, Operating/Construction  \nSource ID: 21-093-00176  \nRegional Office: Frankfort Regional Office  \n300 Sower Boulevard, 1st Floor  \nFrankfort, KY 40601  \n(502) 564-3358  \nCounty: Hardin  \nApplication  \nComplete Date: February 4, 2022  \nIssuance Date: June 20, 2022  \nRevision Date:  \nExpiration Date: June 20, 2027  \n X   \nFor Michael J. Kennedy, P.E.  \nDirector  \nDivision for Air Quality  \nVersion 4/1/2022  \nTABLE OF CONTENTS  \nSECTION ISSUANCE PAGE  \nA. PERMIT AUTHORIZATION Revision 1 1  \nB. EMISSION POINTS, EMISSIONS UNITS, APPLICABLE Revision 2 2  \nREGULATIONS, AND OPERATING CONDITIONS  \nC. INSIGNIFICANT ACTIVITIES Initial 77  \nD. SOURCE EMISSION LIMITATIONS AND TESTING Revision 2 78  \nREQUIREMENTS  \nE. SOURCE CONTROL EQUIPMENT REQUIREMENTS Initial 80  \nF. MONITORING, RECORDKEEPING, AND REPORTING Initial 81  \nREQUIREMENTS  \nG. GENERAL PROVISIONS Revision 2 84  \nH. ALTERNATE OPERATING SCENARIOS Initial 91  \nI. COMPLIANCE SCHEDULE Initial 92  \n\n| Permit | Permit\u003Cbr>Type | Activity\\# | Complete\u003Cbr>Date | Issuance\u003Cbr>Date | Summary of Action |\n| --- | --- | --- | --- | --- | --- |\n| V-21-041 | Title V/\u003Cbr>PSD\u003Cbr>Initial | APE20210001 | 2/4/2022 | 6/20/2022 | Initial Construction Permit |\n| V-21-041\u003Cbr>R1 | Admin.\u003Cbr>Change | APE20240001 | 7/24/2024 | 8/12/2024 | Name Change |\n| V-21-041\u003Cbr>R2 | Signific\u003Cbr>ant\u003Cbr>Revision | APE20240004 | 1/29/2025 |  | As-built correctionsand 401 KAR 51:017 limit changes |\n\nSECTION A-PERMIT AUTHORIZATION  \nPursuant to a duly submitted application the Kentucky Energy and Environment Cabinet (Cabinet) hereby authorizes the operation of the equipment described herein in accordance with the terms and conditions of this permit. This permit was issued under the provisions of Kentucky Revised Statutes (KRS) Chapter 224 and regulations promulgated pursuant thereto.  \nThe permittee shall not construct, reconstruct, or modify any affected facilities without first submitting a complete application and receiving a permit for the planned activity from the permitting authority, except as provided in this permit or in 401 KAR 52:020, Title V Permits.  \nIssuance of this permit does not relieve the permittee from the responsibility of obtaining any other permits, licenses, or approvals required by the Cabinet or any other federal, state, or local agency.  \nSECTION B - EMISSION POINTS, EMISSION UNITS, APPLICABLE REGULATIONS, AND OPERATING CONDITIONS  \nEmission Unit 01: Electrode Manufacturing Processes  \nDescription:  \nConstruction Commenced: May 2022  \nBuilding \\#1  \n\n| Source \\# | Source Name | Control\u003Cbr>Device | Applicable Regulation(s) | Emission Limitation(s) |\n| --- | --- | --- | --- | --- |\n| KY1-PR01\u003Cbr>-KY1-\u003Cbr>PR08 | Powder Room: Anode Measure (Building 1) | Dust\u003Cbr>Collector\u003Cbr>KY1-DC01-\u003Cbr>KY1-DC27 | 401 KAR\u003Cbr>59:010 | Refer to 2. Emission Limitations a. and b. |\n| KY1-PR17\u003Cbr>-KY1-\u003Cbr>PR24 | Powder Room: Anode Feed (Building 1) | Dust\u003Cbr>Collector\u003Cbr>KY1-DC01-\u003Cbr>KY1-DC27 | 401 KAR\u003Cbr>59:010 | Refer to 2. Emission Limitations a. and b. |\n| KY1-PR76\u003Cbr>-KY1-\u003Cbr>PR83 | Anode Mixer Vacuum Pump (Building 1) | No Dust\u003Cbr>Collector,\u003Cbr>Building\u003Cbr>Enclosure | 401 KAR\u003Cbr>59:010 | Refer to 2. Emission Limitations a. and b. |\n| KY1-PR84\u003Cbr>-KY1-\u003Cbr>PR91 | Anode Powder Vacuum Pump (Building 1) | No Dust\u003Cbr>Collector,\u003Cbr>Building\u003Cbr>Enclosure | 401 KAR\u003Cbr>59:010 | Refer to 2. Emission Limitations a. and b. |\n| KY1-PR92\u003Cb","cbCait8pF3sbRYd8","https://ap.wps.com/l/cbCait8pF3sbRYd8","pdf",911612,94,"English","# Permit Authorization\n# Emission Points and Emission Units\n## Applicable Regulations and Operating Conditions\n# Insignificant Activities\n# Source Emission Limitations and Testing Requirements\n# Source Control Equipment Requirements\n# Monitoring, Recordkeeping, and Reporting Requirements\n# General Provisions\n# Alternate Operating Scenarios\n# Compliance Schedule","[{\"question\":\"Who is the permittee and what activity does this permit cover?\",\"answer\":\"The permittee is BlueOval SK, LLC. The activity is identified as APE20240004 and relates to electrode manufacturing processes under Title V/Title I requirements including PSD and operating/construction permissions.\"},{\"question\":\"Where can the permit’s main requirements be found within the document?\",\"answer\":\"The permit is organized into sections including permit authorization, emission points and units with applicable regulations and operating conditions, insignificant activities, emission limitations and testing, control equipment requirements, monitoring/recordkeeping/reporting, general provisions, alternate operating scenarios, and a compliance schedule.\"}]","BlueOval SK, LLC - Air Quality Permit V-21-041 R2 | PDF",1790693253,237]