[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663387-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-663387-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","blatt-pe-center-fire-alarm-upgrades-sheet-e01","BLATT PE Center Fire Alarm Upgrades - Sheet E0.1","","Fire alarm upgrade electrical drawings for the BLATT PE Center, University of South Carolina, sheet E0.1. Provides electrical/fire-alarm legend items, general notes, and detailed specifications for firestopping around raceways penetrating concrete, block, and wall assemblies, including sealant, annular space/opening limits, backer rods, and points of contact. Includes an electrical drawing index referencing single-line, plan areas by floor/level, and system notes governing how existing fire alarm equipment is maintained and coordinated during upgrades.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/blatt-pe-center-fire-alarm-upgrades-sheet-e01/663387/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/blatt-pe-center-fire-alarm-upgrades-sheet-e01/663387.png","ImageObject",300,407,{"name":42,"@type":43},"Grenda","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What does the sheet E0.1 include for the project?","Question",{"text":63,"@type":64},"It includes the electrical legend, general notes, fire alarm drawing index, and referenced details/schedules for the upgrade drawings.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How are raceways to be treated when they penetrate concrete or block assemblies?",{"text":68,"@type":64},"Raceways penetrating concrete or block floors/walls/ceilings must be firestopped/sealed using specified products and sealant applied to defined depth, with required annular space and opening limits.",{"name":70,"@type":61,"acceptedAnswer":71},"What guidance is given for maintaining the existing fire alarm system during construction?",{"text":72,"@type":64},"The contractor shall maintain the existing fire alarm system until the new system is functional, and coordinate required outages with the supervising station and city authorities.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},663387,1793227177,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,100,104,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},6,50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":55,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":80,"read_time":144},7971474921005,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| 5  \u003Cbr>6  \u003Cbr>2  \u003Cbr>3  \u003Cbr>4  \u003Cbr>1  \u003Cbr>DETAIL LEGEND  \u003Cbr>FLOOR,WALL OR CEILING ASSEMBLY:MINIMUM  \u003Cbr>①  \u003Cbr>SEE GENERAL NOTE 3  \u003Cbr>4-1/2”CONCRETE OR BLOCK.  \u003Cbr>ON THIS DRAWING.  \u003Cbr>②  \u003Cbr>PENETRATING ITEM:MAXIMUM 6”STEEL CONDUIT OR  \u003Cbr>MAXIMUM 4”EMT.  \u003Cbr>③  \u003Cbr>FIRESTOPPING:GRACE CONSTRUCTION PRODUCTS  \u003Cbr>FLAMESAFE FS-1900 SEALANT APPLIED TO 1/2”  \u003Cbr>DEPTH.ADD A 3/8”BEAD AT POINT OF CONTACT.  \u003Cbr>A  \u003Cbr>③  \u003Cbr>③  \u003Cbr>MAXIMUM-  \u003Cbr>ANNULAR  \u003Cbr>MAXIMUM  \u003Cbr>SPACE=1-7/8”  \u003Cbr>OPENING=7-7/8”.  \u003Cbr>②  \u003Cbr>POINT OF-  \u003Cbr>CONTACT.  \u003Cbr>③  \u003Cbr>③  \u003Cbr>③  \u003Cbr>POINT OF-  \u003Cbr>CONTACT.  \u003Cbr>BASED ON  \u003Cbr>SECTION A-A  \u003Cbr>UL SYSTEM  \u003Cbr>A  \u003Cbr>CAJ1235-W/E  \u003Cbr>①  \u003Cbr>RACEWAY THROUGH CONCRETE OR BLOCK FLOOR/WALL/CEILING  \u003Cbr>PENETRATION FIRESTOP DETAIL  \u003Cbr>1  \u003Cbr>E1.0  \u003Cbr>NOT TO SCALE  \u003Cbr>m  \u003Cbr>m  \u003Cbr>DETAIL LEGEND  \u003Cbr>WALL ASSEMBLY:WOOD OR STEEL STUDS COVERED  \u003Cbr>①  \u003Cbr>WITH GYPSUM WALLBOARD.  \u003Cbr>②PENETRATING ITEM:MAXIMUM 6”STEEL CONDUIT OR  \u003Cbr>MAXIMUM 4”EMT.  \u003Cbr>SEE GENERAL NOTE 3  \u003Cbr>FIRESTOPPING:GRACE CONSTRUCTION PRODUCTS  \u003Cbr>③  \u003Cbr>ON THIS DRAWING.  \u003Cbr>FLAMESAFE FS-1900 SEALANT APPLIED TO 5/8”  \u003Cbr>DEPTH.ADD A 3/8”BEAD AT POINT OF CONTACT.  \u003Cbr>BACKER RODS:POLYETHYLENE OR POLYURETHANE  \u003Cbr>④  \u003Cbr>BACKER RODS COMPRESSED INTO ANNULUS TO BE  \u003Cbr>USED AS DAMMING.  \u003Cbr>A  \u003Cbr>Stud  \u003Cbr>③  \u003Cbr>③  \u003Cbr>③  \u003Cbr>Void  \u003Cbr>②  \u003Cbr>U  \u003Cbr>MAXIMUM-  \u003Cbr>ANNULAR  \u003Cbr>MAXIMUM  \u003Cbr>SPACE=2”  \u003Cbr>OPENING=8”  \u003Cbr>②  \u003Cbr>POINT OF-  \u003Cbr>CONTACT.  \u003Cbr>ELECTRICAL DRAWING INDEX  \u003Cbr>③  \u003Cbr>③  \u003Cbr>③  \u003Cbr>POINT OF-  \u003Cbr>GENERAL_NOTES,LEGEND,DETAILS,AND SCHEDULES  \u003Cbr>E0.1  \u003Cbr>CONTACT.  \u003Cbr>FIRE ALARM SINGLE-LINE &DETAILS  \u003Cbr>E0.2  \u003Cbr>BASEMENT FIRE ALARM PLAN -AREA A  \u003Cbr>E1.0A  \u003Cbr>SURROUNDING FINISHES.  CONCEALED RACEWAYS MAY BE ABANDONED IN PLACE BUT  \u003Cbr>E1.0B  \u003Cbr>BASEMENT FIRE ALARM PLAN -AREA B  \u003Cbr>SHALL BE FIRESTOPPED/SEALED.  \u003Cbr>1ST FLOOR FIRE ALARM PLAN -AREA A  \u003Cbr>E1.1A  \u003Cbr>BASED ON  \u003Cbr>SECTION A-A  \u003Cbr>1ST FLOOR FIRE ALARM PLAN -AREA B  \u003Cbr>E1.1B  \u003Cbr>UL SYSTEM  \u003Cbr>2.  CONTRACTOR SHALL MAINTAIN THE EXISTING FIRE ALARM SYSTEM UNTIL THE NEW  \u003Cbr>A  \u003Cbr>1ST FLOOR FIRE ALARM PLAN -AREA C  \u003Cbr>①  \u003Cbr>E1.1C  \u003Cbr>WL1152  \u003Cbr>FIRE ALARM SYSTEM IS FUNCTIONAL.  COORDINATE ALL REQUIRED OUTAGES TO  \u003Cbr>1ST FLOOR FIRE ALARM PLAN -AREA D  \u003Cbr>E1.1D  \u003Cbr>THE EXISTING FIRE ALARM SYSTEM WITH TODD GRIFFIN(PHONE NUMBER 212-8775),  \u003Cbr>2ND FLOOR FIRE ALARM PLAN -AREA A  \u003Cbr>E1.2A  \u003Cbr>USC's SUPERVISING STATION,AND CITY OF COLUMBIA FIRE AUTHORITIES.  \u003Cbr>RACEWAY THROUGH STUD WALL  \u003Cbr>2ND FLOOR FIRE ALARM PLAN -AREA B  \u003Cbr>E1.2B  \u003Cbr>2ND FLOOR FIRE ALARM PLAN-AREA C  \u003Cbr>E1.2C  \u003Cbr>3.THE EXISTING FIRE ALARM_SYSTEM EQUIPMENT AND DEVICES REMOVED BY DEMOLITION  \u003Cbr>PENETRATION FIRESTOP DETAIL  \u003Cbr>2  \u003Cbr>2ND FLOOR FIRE ALARM PLAN -AREA D  \u003Cbr>E1.2D  \u003Cbr>SHALL BE TURNED OVER TO TODD GRIFFIN.  \u003Cbr>3RD FLOOR FIRE ALARM PLAN-AREA A  \u003Cbr>E1.3A  \u003Cbr>E1.0  \u003Cbr>NOT TO SCALE  \u003Cbr>E1.3B  \u003Cbr>3RD FLOOR FIRE ALARM PLAN -AREA B  \u003Cbr>3RD FLOOR FIRE ALARM PLAN -AREA C  \u003Cbr>E1.3C  \u003Cbr>3RD FLOOR FIRE ALARM PLAN -AREA D  \u003Cbr>E1.3D  \u003Cbr>3RD FLOOR MEZZANINE FIRE ALARM PLAN -AREA A  \u003Cbr>E1.4A  \u003Cbr>3RD FLOOR MEZZANINE FIRE ALARM PLAN -AREA B  \u003Cbr>E1.4B  \u003Cbr>PROGRAMMABLE SWITCH SCHEDULE AT FVCC PANELS  \u003Cbr>D  \u003Cbr>KEYED SWITCH TO LOCK-OUT LOCAL OPERATION·  \u003Cbr>OF PROGRAMMABLE SWITCHES SW1 THROUGH SW8.  \u003Cbr>(FOR THE REMOTE ANNUNCIATOR PANELS ONLY).  \u003Cbr>3  \u003Cbr>2  \u003Cbr>4  \u003Cbr>6  \u003Cbr>5   | COLUMBIA, SC 29208  \u003Cbr>FACILITIES MANAGEMENT  \u003Cbr>OFFICE OF   |  |\n| --- | --- | --- |\n|  | US21016  \u003Cbr>ASSOCIATES,INC  \u003Cbr>ENGINEERING  \u003Cbr>BELKA  \u003Cbr>EMAL:jwland@bellsouth.net  \u003Cbr>(803)731-0650fax(803)731-2880  \u003Cbr>COLUMBIA, SOUTH CAROLINA 29210  \u003Cbr>7 LUSTERS COURT,SUITE 201   |  |\n|  |  |  |\n|  | JWL  \u003Cbr>CHECKED BY:  \u003Cbr>JWL  \u003Cbr>DRAWN BY:  \u003Cbr>18 SEP 12  \u003Cbr>DATE:  \u003Cbr>DRAWING:  \u003Cbr>138  \u003Cbr>BUILDING:  \u003Cbr>BLATT PE CENTER FIRE ALARM UPGRADES  \u003Cbr>State Project H27-1851  \u003Cbr>PROJECT TITLE:   | DRAWN BY  \u003Cbr>ORIG.BY  \u003Cbr>DATE  \u003Cbr>DESCRIPTION  \u003Cbr>REV.  \u003Cbr>University of Sout","cbCaiagT9gMIq0CO","https://ap.wps.com/l/cbCaiagT9gMIq0CO","pdf",2587186,18,"English","# General Notes, Legend, Details, and Schedules\n## Electrical Drawing Index\n## Fire Alarm Single-Line & Details\n## Basement Fire Alarm Plan (Area A)\n## Basement Fire Alarm Plan (Area B)\n## 1st Floor Fire Alarm Plan (Areas A-D)\n## 2nd Floor Fire Alarm Plan (Areas A-D)\n## 3rd Floor Fire Alarm Plan (Areas A-D)\n## 3rd Floor Mezzanine Fire Alarm Plan (Areas A-B)","[{\"question\":\"What does the sheet E0.1 include for the project?\",\"answer\":\"It includes the electrical legend, general notes, fire alarm drawing index, and referenced details/schedules for the upgrade drawings.\"},{\"question\":\"How are raceways to be treated when they penetrate concrete or block assemblies?\",\"answer\":\"Raceways penetrating concrete or block floors/walls/ceilings must be firestopped/sealed using specified products and sealant applied to defined depth, with required annular space and opening limits.\"},{\"question\":\"What guidance is given for maintaining the existing fire alarm system during construction?\",\"answer\":\"The contractor shall maintain the existing fire alarm system until the new system is functional, and coordinate required outages with the supervising station and city authorities.\"}]","BLATT PE Center Fire Alarm Upgrades - Sheet E0.1 | PDF",45]