[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-648690-105":3,"doc-detail-648690-en":80,"detail-sidebar-cat-0-en-105":98},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","bim-training-43-mep-design-management-key-bim-process-concepts","BIM Training - 4.3 MEP Design Management - Key BIM Process Concepts","","MEP design management within Building Information Modelling (BIM) is presented as a structured training topic, emphasizing how traditional workflows compare with BIM-led processes. The material outlines concept, design, construction, and as-built model stages, and links BIM management to clear project outcomes. It details requirements for agreed BIM purposes, planning, specifications, procedures, and the typical role of a BIM Manager. It also explains that each project needs a BIM Project Execution Plan (PXP/BEP/BXP) covering deliverables, roles, and responsibilities, with stage-specific types across design, tender, construction, and as-built.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/bim-training-43-mep-design-management-key-bim-process-concepts/648690/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/bim-training-43-mep-design-management-key-bim-process-concepts/648690.png","ImageObject",300,407,{"name":42,"@type":43},"supergirl","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-27","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of the BIM process in an MEP design management project?","Question",{"text":62,"@type":63},"The BIM process should have a clearly defined outcome agreed with the client. Successful delivery requires careful planning, detailed BIM specifications, and agreed procedures and methodologies.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What document does the training describe as central to BIM execution?",{"text":67,"@type":63},"The BIM Project Execution Plan (PXP) (also referenced as BEP or BXP) is created at the start of the project and updated throughout. It outlines the project vision and provides implementation details, including BIM deliverables, processes, and members’ roles and responsibilities.",{"name":69,"@type":60,"acceptedAnswer":70},"What are the types of BIM PXP across the project lifecycle?",{"text":71,"@type":63},"The training distinguishes design stage PXP, tender stage PXP, construction stage PXP, and as-built stage PXP. Each stage is typically prepared or updated by the responsible party such as the lead consultant BIM Manager, contractors’ BIM Manager, or facility manager.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},648690,1793065452,{"code":4,"msg":81,"data":82},"success",{"doc_id":78,"user_id":83,"nickname":42,"user_avatar":84,"doc_module":4,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":86,"file_id":87,"file_url":88,"file_type":89,"file_size":90,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":91,"language":92,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":93,"faqs":94,"seo_title":95,"seo_description":12,"update_tm":96,"read_time":97},962088121634,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc",6,"Building Information Modelling (BIM) Training  \n[https://ibse.hk/BIM-Training/](https://ibse.hk/BIM-Training/)  \n4.3 MEP Design Management  \nIr Dr. Sam C. M. Hui  \nDepartment of Mechanical Engineering The University of Hong Kong E-mail: cmhui@hku.hk  \nMay 2023  \n\n|  |  |\n| --- | --- |\n| Contents | |\n| • BIM process\u003Cbr>• Project Execution Plan (PXP)\u003Cbr>• Modelling methodology\u003Cbr>• Level of development (LOD)\u003Cbr>• MEP coordination |  |\n\n| BIM process overview |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| Concept model | | Design model | | Construction model | | As-built model |\n| (Source: [https://www.bimmepaus.com.au](https://www.bimmepaus.com.au)) |  |  |  |  |  |  |\n\nComparison of traditional and BIM workflows  \nRFI = request for information  \nTypical BIM design management process  \n(Source: CIC, 2015. CIC Building Information Modelling Standards (Phase One), Construction Industry Council (CIC), Hong Kong.  \n[http://www.cic.hk/files/page/51/CIC%20BIM%20Standards_FINAL_ENG_v1.pdf](http://www.cic.hk/files/page/51/CIC%20BIM%20Standards_FINAL_ENG_v1.pdf))  \n\n| BIM process \u003Cbr>|\n| --- |\n| • Every BIM project shall have a clearly defined outcome\u003Cbr>• The purpose of the BIM process should be set out and agreed by the client\u003Cbr>• The successful delivery requires careful planning, detailed BIM specifications and a defined set of procedures and methodologies for the BIM implementation\u003Cbr>• Usually a professional BIM Manager will lead and support the BIM process |\n\n\n| BIM process \u003Cbr>|\n| --- |\n| • Define the scope of work for a BIM process\u003Cbr>• Major issues:*\u003Cbr>• BIM Project Execution Plan (PXP) or BIM Execution Plan (BEP or BXP)\u003Cbr>• Modelling methodology\u003Cbr>• Level of development (LOD)\u003Cbr>• Component presentation style and data organisation\u003Cbr>(See also: CIC, 2015. CIC Building Information Modelling Standards (Phase One), Construction Industry Council (CIC), Hong Kong.\u003Cbr>[http://www.cic.hk/files/page/51/CIC%20BIM%20Standards_FINAL_ENG_v1.pdf](http://www.cic.hk/files/page/51/CIC%20BIM%20Standards_FINAL_ENG_v1.pdf)) |\n\n\n| Project Execution Plan (PXP) \u003Cbr>|\n| --- |\n| • BIM PXP\u003Cbr>• Created at the start and updated throughout the project period\u003Cbr>• Developed by the client, or with support from the lead consultant (architect or engineer)\u003Cbr>• Should outline the overall vision for the project and provide implementation details\u003Cbr>• Include the agreed BIM deliverables & processes for a project; specifies the roles & responsibilities of project members |\n\n\n| Project Execution Plan (PXP) \u003Cbr>|\n| --- |\n| • Types ofBIM PXP:\u003Cbr>•  Design stage (prepared by the lead consultant BIM Manager)\u003Cbr>• Conceptual design, schematic/preliminary design, detailed design\u003Cbr>•  Tender stage (contractors update & amend the design stage PXP)\u003Cbr>•  Construction stage (prepared by the contractor’s BIM Manager)\u003Cbr>• As-built stage (prepared by the facility manager) |\n\n\n| Design stage BIM PXP\u003Cbr>| Tender & construction stage BIM PXP\u003Cbr>|\n| --- | --- |\n| (Source: CIC, 2015. CIC Building Information Modelling Standards (Phase One), Construction Industry Council (CIC), Hong Kong.\u003Cbr>[http://www.cic.hk/files/page/51/CIC%20BIM%20Standards_FINAL_ENG_v1.pdf](http://www.cic.hk/files/page/51/CIC%20BIM%20Standards_FINAL_ENG_v1.pdf)) |  |","cbCaifkQhciSw9uv","https://ap.wps.com/l/cbCaifkQhciSw9uv","pdf",1346122,36,"English","# BIM process overview\n## Comparison of traditional and BIM workflows\n## Typical BIM design management process\n# BIM Project Execution Plan (PXP)\n## Types across design, tender, construction, and as-built\n## Design stage PXP and tender & construction stage PXP","[{\"question\":\"What is the purpose of the BIM process in an MEP design management project?\",\"answer\":\"The BIM process should have a clearly defined outcome agreed with the client. Successful delivery requires careful planning, detailed BIM specifications, and agreed procedures and methodologies.\"},{\"question\":\"What document does the training describe as central to BIM execution?\",\"answer\":\"The BIM Project Execution Plan (PXP) (also referenced as BEP or BXP) is created at the start of the project and updated throughout. It outlines the project vision and provides implementation details, including BIM deliverables, processes, and members’ roles and responsibilities.\"},{\"question\":\"What are the types of BIM PXP across the project lifecycle?\",\"answer\":\"The training distinguishes design stage PXP, tender stage PXP, construction stage PXP, and as-built stage PXP. Each stage is typically prepared or updated by the responsible party such as the lead consultant BIM Manager, contractors’ BIM Manager, or facility manager.\"}]","BIM Training - 4.3 MEP Design Management - Key BIM Process Concepts | PDF",1792794623,91,{"code":4,"msg":81,"data":99},[100,104,108,112,117,120,125,130,135,138,142],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},"Exam",70,"exam",{"id":113,"doc_module":4,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},5,"Comic",60,"comic",{"id":85,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":118,"slug":119},50,"technology",{"id":121,"doc_module":4,"doc_module_name":25,"category_name":122,"show_sort_weight":123,"slug":124},7,"Healthcare",40,"healthcare",{"id":126,"doc_module":4,"doc_module_name":25,"category_name":127,"show_sort_weight":128,"slug":129},8,"Research & Report",30,"research-report",{"id":131,"doc_module":4,"doc_module_name":25,"category_name":132,"show_sort_weight":133,"slug":134},9,"Religion & Spirituality",20,"religion-spirituality",{"id":133,"doc_module":4,"doc_module_name":25,"category_name":136,"show_sort_weight":133,"slug":137},"World Cup","world-cup",{"id":139,"doc_module":4,"doc_module_name":25,"category_name":140,"show_sort_weight":139,"slug":141},10,"Lifestyle","lifestyle",{"id":143,"doc_module":4,"doc_module_name":25,"category_name":144,"show_sort_weight":113,"slug":145},19,"General","general"]