[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663580-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-663580-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","bim-essential-guide-for-bim-execution-plan-ceos-message","BIM Essential Guide - For BIM Execution Plan - CEO’s Message","","BIM Essential Guide for BIM Execution Plan (BEP) provides a baseline, employer-approved document to start BEP development and to guide a project team in achieving BIM deliverables across project stages. It defines roles and responsibilities for using Building Information Modelling, describing how deliverables are created, maintained, and shared to meet project goals. The guide outlines typical BEP content such as project information, BIM use cases, deliverables, authors and users, levels of detail and attributes, technical environment, and collaboration processes, with the BEP updated as the project evolves.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/bim-essential-guide-for-bim-execution-plan-ceos-message/663580/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/bim-essential-guide-for-bim-execution-plan-ceos-message/663580.png","ImageObject",300,407,{"name":42,"@type":43},"RuangKosong","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of a BIM Execution Plan (BEP) in this guide?","Question",{"text":62,"@type":63},"It jumpstarts development of a BEP and provides a baseline, approved by the Employer, to guide the project team in meeting BIM deliverables goals throughout the project.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What typical information and sections does a BEP include?",{"text":67,"@type":63},"A typical BEP includes project information, project members, project goals, BIM use cases by stage, BIM deliverables, model author and users, model elements with level of details and attributes, and the process for creation, maintenance, release, and collaboration, plus the technical environment.",{"name":69,"@type":60,"acceptedAnswer":70},"How and when can the BEP be updated during the project?",{"text":71,"@type":63},"The BEP is usually defined at the start of the project and can be updated to accommodate new members or new BIM uses. Updates should be made with the Employer’s (or the appointed BIM Manager’s) permission.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},663580,1793229431,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,104,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},6,50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":107,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":143},962090883219,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","BIM Essential Guide  \nFor BIM Execution Plan  \nBCA acknowledges the leadership provided by the BIM Steering Committee in support of the production of the BIM Essential Guides  \nThe BIM Essential Guides have been drafted by the Centre for Construction IT on behalf of BCA and the BIM Steering Committee.  \n©Building and Construction Authority 2013  \nBuilding and Construction Authority  \n5 Maxwell Road  \n\\#16-00 Tower Block MND Complex Singapore 059110  \n[www.bca.gov.sg](www.bca.gov.sg)  \nFirst published August 2013  \nWhile every effort has been made to ensure the accuracy and quality of information contained in this publication, the Building and Construction Authority, its employees, agents or industry partners can take no responsibility for the subsequent use of this information, nor for any errors or omissions that it may contain.  \nCover image and design courtesy of RSP Architects Planners & Engineers (Pte) Ltd and the BCA Academy of the Built Environment.  \nContents  \nCEO’s Message_____________________________________________________________ii  \n1 INTRODUCTION ________________________________________________________1  \n2 STEP BY STEP QUICK GUIDE _______________________________________________2  \n3 BIM Execution Plan Template______________________________________________3  \nAppendix A – BIM Use Case Template___________________________________________5  \nAppendix B – Typical BIM Elements by Discipline__________________________________9  \n(I) Architectural BIM Elements_____________________________________________9  \n(II) Structural BIM Elements ______________________________________________10  \n(III) Civil BIM Elements ___________________________________________________11  \n(IV) ACMV BIM Elements _________________________________________________12  \n(V) Plumbing and Sanitary BIM Elements ____________________________________13  \n(VI) Fire Protection BIM Elements __________________________________________14  \n(VII) Electrical BIM Elements _______________________________________________14  \nAppendix C – BIM Modelling Guidelines________________________________________16  \n(I) Overview __________________________________________________________17  \n(II) Quality Assurance ___________________________________________________18  \n(III) Architectural BIM Modelling Guidelines __________________________________19  \n(IV) Structural BIM Modelling Guidelines_____________________________________23  \n(V) MEP BIM Modelling Guidelines_________________________________________27  \nCEO’s Message  \nDear readers,  \nBuilding Information Modelling (BIM) has gained much traction in recent years as digital construction technology that will fundamentally transform the building and construction industry practice in the delivery of an excellent built environment. It is a game changing technology that will improve the construction productivity as well as the level of  \nintegration and collaboration across the various disciplines in the construction value chain. It is therefore important for the  \nindustry to embrace the technology with clarity.  \nThe BIM Essential Guides are part of the industry’s efforts to demystify BIM and to give clarity on the requirement of BIM usage at different stages of a project.  \nUnder the leadership of the BIM Steering Committee chaired by Er Lee Chuan Seng, Emeritus Chairman, Beca Carter, and comprising of leaders in BIM, the BIM Managers Forum has contributed much time and effort to compile the various best practices to make this Guide possible over a short span of time. We would like to thank them for their contribution.  \nWe hope that every BIM user can truly reap the benefits of BIM by integrating it into his/her day-to-day workflow – from feasibility study to facility management. We hope that BIM users can use these guides as a platform to jumpstart their BIM adoption, before they leap to greater heights, innovating and transforming their workflow.  \nBIM is a journey. We envisage that it will grow with time and will inspire m","cbCaimFxZfSb8Dy5","https://ap.wps.com/l/cbCaimFxZfSb8Dy5","pdf",1153774,"English","# CEO’s Message\n# 1 INTRODUCTION\n# 2 STEP BY STEP QUICK GUIDE\n# 3 BIM Execution Plan Template\n# Appendix A – BIM Use Case Template\n# Appendix B – Typical BIM Elements by Discipline\n## (I) Architectural BIM Elements\n## (II) Structural BIM Elements\n## (III) Civil BIM Elements\n## (IV) ACMV BIM Elements\n## (V) Plumbing and Sanitary BIM Elements\n## (VI) Fire Protection BIM Elements\n## (VII) Electrical BIM Elements\n# Appendix C – BIM Modelling Guidelines\n## (I) Overview\n## (II) Quality Assurance\n## (III) Architectural BIM Modelling Guidelines\n## (IV) Structural BIM Modelling Guidelines\n## (V) MEP BIM Modelling Guidelines","[{\"question\":\"What is the purpose of a BIM Execution Plan (BEP) in this guide?\",\"answer\":\"It jumpstarts development of a BEP and provides a baseline, approved by the Employer, to guide the project team in meeting BIM deliverables goals throughout the project.\"},{\"question\":\"What typical information and sections does a BEP include?\",\"answer\":\"A typical BEP includes project information, project members, project goals, BIM use cases by stage, BIM deliverables, model author and users, model elements with level of details and attributes, and the process for creation, maintenance, release, and collaboration, plus the technical environment.\"},{\"question\":\"How and when can the BEP be updated during the project?\",\"answer\":\"The BEP is usually defined at the start of the project and can be updated to accommodate new members or new BIM uses. Updates should be made with the Employer’s (or the appointed BIM Manager’s) permission.\"}]","BIM Essential Guide - For BIM Execution Plan - CEO’s Message | PDF",101]