[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-513744-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-513744-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","bids-invited-for-upgradation-of-road-and-facilities-at-dnd-flyway","Bids invited for upgradation of road and facilities at DND Flyway","","Noida Toll Bridge Company Limited (NTBCL) has started inviting bids to upgrade the road and associated facilities on the Delhi-Noida-Direct (DND) Flyway used by more than 200,000 commuters daily. The second phase, budgeted at ₹6 crore and scheduled to finish by January 2026, targets micro-surfacing, embankment protection, strengthening, and related infrastructure to improve safety, mobility, and durability. Officials also note temporary inconvenience during works, while commuters call for urgent repairs and faster response to stalled vehicles.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/bids-invited-for-upgradation-of-road-and-facilities-at-dnd-flyway/513744/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/bids-invited-for-upgradation-of-road-and-facilities-at-dnd-flyway/513744.png","ImageObject",300,407,{"name":42,"@type":43},"Kurz","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-20","2026-10-06",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What project is NTBCL inviting bids for?","Question",{"text":63,"@type":64},"NTBCL has started the process to invite bids for upgrading the road and certain associated facilities on the DND Flyway.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What does the second phase of upgrades include and when will it be completed?",{"text":68,"@type":64},"The second phase focuses on micro-surfacing, strengthening, embankment protection, and related infrastructure, and is expected to be completed by January 2026.",{"name":70,"@type":61,"acceptedAnswer":71},"How much budget is allocated for the second phase and what was spent previously?",{"text":72,"@type":64},"The second phase budget is ₹6 crore. Earlier in 2023, NTBCL spent ₹5 crore on maintenance works in the first phase.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},513744,1791560767,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":97,"preview_page_count":26,"preview_urls":145},2336478945635,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Bids invited for upgradation of road and facilities at DND Flyway  \nThe budget for the second phase of upgrades is ₹6 crore. Earlier in 2023, NTBCL spent ₹5 crore on maintenance works in the first phase  \nNoida: The Noida Toll Bridge Company Limited (NTBCL) has started the process to invite bids for the upgradation of the road and certain associated facilities on the Delhi-Noida-Direct (DND) Flyway which serves over two hundred thousand commuters daily, said officials on Wednesday, adding that the decision was approved by the company’s board meeting, held recently.  \nThe second phase program, which is expected to be completed by January 2026, will focus on micro-surfacing, strengthening, embankment protection, and associated infrastructure works required to ensure safety, smooth mobility, and long-term durability of the DND Flyway said NTBCL officials. (HT Archives)  \nThe budget for the second phase of upgrades is ₹6 crore. Earlier in 2023, NTBCL spent ₹5 crore on maintenance works in the first phase.  \n“The DND Flyway has served millions of commuters over the years and continues to have over two thousand commuters daily. This initiative reflects our ongoing responsibility towards the upkeep of this vital public asset and reaffirms our continued commitment to maintain world-class user experience and ensure safety for our users,” said NTBCL in a statement on Tuesday.  \nThe second phase program, which is expected to be completed by January 2026, will focus on micro-surfacing, strengthening, embankment protection, and associated infrastructure works required to ensure safety, smooth mobility, and long-term durability of the DND Flyway said NTBCL officials, adding that this may cause some inconvenience in certain parts of the flyway during the upgradation works.  \nBrajesh Sharma, who works at a private company and is a daily commuter of the DND Flyway said,“There is an urgent need to repair the washrooms, central verge, trees, and road surface of the DND Flyway. A small pothole on the DND can cause a major accident, as traffic moves at a high speed. Apart from this, there is a need for quick action in cases of stalled vehicles, as they cause traffic jams,” said Sharma, adding that the advertisements along the DND also distract drivers.  \n“It is expected that the company should complete the second phase of work before the mentioned deadline, as it is a lifeline for thousands of commuters,” said Sharma.  \nAnother commuter, Rakesh Singh, a banker and a resident of Sector 19, said,“It is good that NTBCL has decided to focus on upgrading the road and facilities on the DND. It was urgently needed.”  \nArticle Link:  \n[https://timesofindia.indiatimes.com/city/hyderabad/expert-calls-for-forensic-audit-of-dharani-portal-amid-land-record](https://timesofindia.indiatimes.com/city/hyderabad/expert-calls-for-forensic-audit-of-dharani-portal-amid-land-record)  \nirregularities-in-telangana/articleshow/123836351 .cms","cbCaic5omUz9nmRN","https://ap.wps.com/l/cbCaic5omUz9nmRN","pdf",356444,"English","# Upgradation bid invitation\n## Scope and expected completion\n## Budget and prior phase spending\n## Potential inconvenience during works\n## Commuter feedback and repair needs","[{\"question\":\"What project is NTBCL inviting bids for?\",\"answer\":\"NTBCL has started the process to invite bids for upgrading the road and certain associated facilities on the DND Flyway.\"},{\"question\":\"What does the second phase of upgrades include and when will it be completed?\",\"answer\":\"The second phase focuses on micro-surfacing, strengthening, embankment protection, and related infrastructure, and is expected to be completed by January 2026.\"},{\"question\":\"How much budget is allocated for the second phase and what was spent previously?\",\"answer\":\"The second phase budget is ₹6 crore. Earlier in 2023, NTBCL spent ₹5 crore on maintenance works in the first phase.\"}]","Bids invited for upgradation of road and facilities at DND Flyway | PDF",1791290236,[146,150],{"page_no":22,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/474ebc8a61fc6d63c5de37db75691fd8.webp",983,1272,{"page_no":26,"url":151,"width":152,"height":153},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/4a09bfb85ac306f9346d4262e799151d.webp",982,1270]