[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-112370-en":3,"doc-seo-112370-105":29,"detail-sidebar-cat-0-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":13,"seo_description":14,"update_tm":27,"read_time":28},112370,137441390410,"Hazel","https://ap-avatar.wpscdn.com/avatar/2000252f4ab5702993?_k=1776741390130283984",8,"Research & Report","Bi-Annual Overview of Status of Implementation of Ongoing Management Action Plans","Bi-Annual overview summarizing the status of implementation of ongoing management action plans prepared in response to Inspection Panel investigation reports. It tracks project-level progress for initiatives in Tanzania, Bolivia, and India, outlining latest progress report timing and next reporting due dates where applicable. The document includes an issue/finding matrix comparing inspection findings with borrower actions, management actions, and current completion or in-progress status, including referenced project documentation, grant support, implementation arrangements, and field consultation activities.","Public Disclosure Authorized Pub lic Disclosure Authorized  \nJune 18, 2026  \nBi-Annual Overview of Status of Implementation of Ongoing Management Action Plans Prepared in Response to Inspection Panel Investigation Reports  \n\n| \\# | PROJECT | LATEST PROGRESS REPORT 1 | NEXT PROGRESS REPORT DUE |\n| --- | --- | --- | --- |\n| 1 | Tanzania: Resilient Natural Resources Management for Tourism and Growth Project (IPN Case \\#165) | 1st and Final Progress Report February 2026 | N/A |\n| 2 | Bolivia: Santa Cruz Road Corridor Connector Project (San Ignacio-San Jose)(IPN Case \\#162) | 2nd progress report\u003Cbr>June 2026 | 3rd progress report\u003Cbr>June 2027 |\n| 3 | India – Rural Water Supply and Sanitation Project for Low Income States\u003Cbr>(IPN Case \\#128/129 | 3rd progress report, May 2026 | 4th progress report May 2027 |\n\n1 Reporting intervals may vary according to the Board’s specific request at the time of Action Plan approval.  \n1  \nOfficial Use Only  \n1.  Tanzania – Resilient Natural Resources Management for Tourism and Growth  \nFirst and Final Progress Report on Management’s Action Plan in response to the Inspection Panel Investigation Report (192945-TZ) on the Resilient Natural Resources Management for Tourism and Growth Project (P150523), February 10, 2026.  \n\n| Issue/Finding | Borrower Action | Status | Management Action | Status |\n| --- | --- | --- | --- | --- |\n| The Panel finds that Management did not recognize that Project support of park management would invariably restrict access to legally designated parks, including the southern part of RUNAPA, and that this could result in adverse impacts on livelihoods linked to the Project.\u003Cbr>Thus, the Panel finds the Project isnot in compliance with OP 4.12\u003Cbr>paragraph 3(b) . | The Borrower will work with the Bank to support communities in and around RUNAPA in an effort to balance conservation and development, including reducing incidences of conflict and violence in the Park and providing alternative livelihoods.\u003Cbr>This will involve: |  |  |  |\n|  | (a) The establishment of a project financed by a Trust Fund, which has been developed independently from the REGROW objectives and scope. It will include support for alternative livelihoods prioritized by communities in the villages and subvillages inside RUNAPA and some communities around the Park. The project is supported by a US$2 .8 million grant from Trust Funds. The project will be implemented by the | Completed (January 23, 2025). The Borrower prepared and Management approved the Promoting Community Led Nature-Based Solutions to Climate Change Adaptation in the Usangu Catchment Project (P502536), which became effective on June 10, 2025, and was launched on June 11, 2025. The launch event was attended by the Ministry of Water, RBWB (as the implementing agency), community representatives, and Management. RBWB has in place a Project Operations Manual (POM) and has formed a Project Implementation Team (PIT) as required. Additionally, a Subsidiary Agreement has been signed between the Borrower and RBWB. The PIT includes a | (a) Providing technical support to the Borrower for the preparation and submission of the project proposal to secure financing for these activities.\u003Cbr>Date: February 2025 | Completed (January 23, 2025). The Bank supported the Borrower in preparing the project through conducting all required technical, fiduciary, procurement, and safeguards assessments in accordance with Bank policies and procedures as well as trust fund procedures.\u003Cbr>The Bank undertook several preparation missions jointly with the Borrower/RBWB to the project’s targeted villages and assessed how the Borrower/RBWB was considering beneficiaries’ views in the design of the project activities. Field visits were conducted in Mbarali district to consult |\n\n2  \nOfficial Use Only  \n\n| Issue/Finding | Borrower Action | Status | Management Action | Status |\n| --- | --- | --- | --- | --- |\n|  | Rufiji Basin Water Board (RBWB), assisted by a reputable local NGO to ","cbCairJj5RiNlWnX","https://ap.wps.com/l/cbCairJj5RiNlWnX","pdf",547160,1,36,"English","en",105,"# Overview\n## Project progress and reporting schedule\n## Issue/finding to action mapping\n## Borrower and management actions","[{\"question\":\"What is the purpose of the bi-annual overview in the document?\",\"answer\":\"It provides an updated view of how ongoing management action plans are being implemented in response to Inspection Panel investigation reports.\"},{\"question\":\"Which projects are covered in the progress table?\",\"answer\":\"The document lists initiatives for Tanzania, Bolivia, and India, each with corresponding latest progress reporting and next progress report due timing where applicable.\"},{\"question\":\"How does the document connect inspection findings to actions?\",\"answer\":\"It presents an issue/finding matrix that pairs each finding with specified borrower actions and management actions, along with their current status (e.g., completed or in progress).\"}]",1784494645,91,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":13,"keywords":33,"description":14,"schema_data":34,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":27},"bi-annual-overview-of-status-of-implementation-of-ongoing-management-action-plans","",{"@graph":35,"@context":85},[36,53,68],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,50],{"item":40,"name":41,"@type":42,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/document/","Document",2,{"item":48,"name":12,"@type":42,"position":49},"https://docshare.wps.com/document/research-report/",3,{"item":51,"name":13,"@type":42,"position":52},"https://docshare.wps.com/document/bi-annual-overview-of-status-of-implementation-of-ongoing-management-action-plans/112370/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":62,"encodingFormat":60,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":40,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-20","2026-07-19",true,{"@type":65,"interactionType":66,"userInteractionCount":20},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What is the purpose of the bi-annual overview in the document?","Question",{"text":75,"@type":76},"It provides an updated view of how ongoing management action plans are being implemented in response to Inspection Panel investigation reports.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"Which projects are covered in the progress table?",{"text":80,"@type":76},"The document lists initiatives for Tanzania, Bolivia, and India, each with corresponding latest progress reporting and next progress report due timing where applicable.",{"name":82,"@type":73,"acceptedAnswer":83},"How does the document connect inspection findings to actions?",{"text":84,"@type":76},"It presents an issue/finding matrix that pairs each finding with specified borrower actions and management actions, along with their current status (e.g., completed or in progress).","https://schema.org",{"og:url":51,"og:type":87,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":89,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":92},[93,97,101,105,110,115,120,123,128,131,135],{"id":20,"doc_module":4,"doc_module_name":45,"category_name":94,"show_sort_weight":95,"slug":96},"Story & Novel",90,"story-novel",{"id":46,"doc_module":4,"doc_module_name":45,"category_name":98,"show_sort_weight":99,"slug":100},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":45,"category_name":102,"show_sort_weight":103,"slug":104},"Exam",70,"exam",{"id":106,"doc_module":4,"doc_module_name":45,"category_name":107,"show_sort_weight":108,"slug":109},5,"Comic",60,"comic",{"id":111,"doc_module":4,"doc_module_name":45,"category_name":112,"show_sort_weight":113,"slug":114},6,"Technology",50,"technology",{"id":116,"doc_module":4,"doc_module_name":45,"category_name":117,"show_sort_weight":118,"slug":119},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":45,"category_name":12,"show_sort_weight":121,"slug":122},30,"research-report",{"id":124,"doc_module":4,"doc_module_name":45,"category_name":125,"show_sort_weight":126,"slug":127},9,"Religion & Spirituality",20,"religion-spirituality",{"id":126,"doc_module":4,"doc_module_name":45,"category_name":129,"show_sort_weight":126,"slug":130},"World Cup","world-cup",{"id":132,"doc_module":4,"doc_module_name":45,"category_name":133,"show_sort_weight":132,"slug":134},10,"Lifestyle","lifestyle",{"id":136,"doc_module":4,"doc_module_name":45,"category_name":137,"show_sort_weight":106,"slug":138},19,"General","general"]