[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-111502-en":3,"doc-seo-111502-105":29,"detail-sidebar-cat-0-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":4,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":13,"seo_description":14,"update_tm":27,"read_time":28},111502,8796095461564,"Liam","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d",8,"Research & Report","Bi-Annual Overview of Status of Implementation of Ongoing Management Action Plans - Prepared in Response to Inspection Panel Investigation Reports - June 8, 2025","Bi-Annual Overview of Status of Implementation of Ongoing Management Action Plans prepared in response to Inspection Panel investigation reports, dated June 8, 2025. The materials summarize project-by-project latest progress and next reporting due dates across multiple countries, and provide detailed status for key management actions. For the Vishnugad Pipalkoti Hydroelectric Project, the report covers water loss mitigation through monitoring and alternative water supply design, plus resettlement and livelihood restoration for affected families, including progress, remaining challenges, and compensation methodology updates.","Public Disclosure Authorized Public Disclosure Authorized  \nJune 8, 2025  \nBi-Annual Overview of Status of Implementation of Ongoing Management Action Plans Prepared in Response to Inspection Panel Investigation Reports  \n\n| \\# | PROJECT | LATEST PROGRESS REPORT 1 | NEXT PROGRESS REPORT DUE |\n| --- | --- | --- | --- |\n| 1 | India – Vishnugad Pipalkoti Hydro Electric Project (IPN Case \\#81) | 10th and final progress report, February 2025 | N/A |\n| 2 | India – Rural Water Supply and Sanitation Project for Low Income States\u003Cbr>(IPN Case \\#128/129) | 2nd progress report,\u003Cbr>March 2025 | 3rd progress report\u003Cbr>March 2026 |\n| 3 | Togo, Western Africa: West Africa Coastal Areas Resilience Investment Project\u003Cbr>(IPN Case \\#153) | 1st progress report, October 2024 | 2nd progress report\u003Cbr>October 2025 |\n| 4 | Bolivia: Santa Cruz Road Corridor Connector Project (San Ignacio-San Jose)(IPN Case\\#162) | 1st progress report June 2025 | 2nd progress report\u003Cbr>June 2026 |\n\n1 Reporting intervals may vary according to the Board’s specific request at the time of Action Plan approval.  \n1  \nOfficial Use Only  \n1. India-Vishnugad Pipalkoti Hydro Electric Project  \nTenth and Final Progress Report on the implementation of Management’s Action Plan in response to the Inspection Panel Investigation Report (\\#89109-IN) on the India Vishnugad Pipalkoti Hydro Electric Project (Loan No. 8078-IN), February 20, 2025.  \nDETAILED STATUS OF ACTIVITIES IN THE MAP  \n\n| MANAGEMENT ACTION | STATUS OF MANAGEMENT ACTION |\n| --- | --- |\n| Water Loss and Alternative Water Sources:\u003Cbr>THDC conducts regular monitoring surveys ofthe 66 water sources, using both videography and flow measurement. If a water source dries up, THDC will design a replacement, in coordination with the affected villages, based on options including the following: (i) new gravityfed water supply systems; (ii) reservoirs or cisterns for village bulk supply, filled either by diverting flow from a nearby stream, by pumping water from another source or by water trucks; or (iii)\u003Cbr>rechanneling the water source.\u003Cbr>Management will monitor the evolution of the water sources, and, if a water source dries up, assess the proposed replacement option, and supervise the implementation of works. The team will include water and sanitation specialists. | Completed as of the 1st Progress Report.\u003Cbr>THDC continues videography and flow measurement, to monitor water sources on a six-monthly basis, and maintains a state of readiness to develop alternative water supply schemes should water loss be reported by any village. For example, a new scheme on water supply has been developed in consultation with the Math village community and a new connection was installed in November 2024 to address water depletion issues although, as per preliminary findings, the impacts were not related to construction activities.\u003Cbr>As requested by the Hatsari community, a contract for a new tank with pipeline to supply water in Hatsari has been awarded by THDC and is underconstruction. |\n| Resettlement and Livelihood Restoration:\u003Cbr>THDC has put in place a plan to address the issue of the Hatsari families. Two safeguard-compliant options (one for temporary relocation and the other option for permanent relocation) are available to the Project affected families. THDC is waiting to see which option the families choose. Every three months, THDC will meet with the Hatsari families to review their selection. If selection is made, THDC will work with the family to implement it.\u003Cbr>Management will monitor if the Hatsari families have made a selection. If aselection has been made, Management will review the implementation of theresettlement option. | Completed as of the 10th Progress Report.\u003Cbr>Resettlement. Despite several meetings with THDC, the six remaining Hatsari families declined to accept offers made available from time to time. In addition, one of the Project-affected people filed a petition with the High Court in August 2020, aimed at dire","cbCaidF5xBIMkQWY","https://ap.wps.com/l/cbCaidF5xBIMkQWY","pdf",699718,1,30,"English","en",105,"# Bi-Annual Overview\n## Project progress summary\n## Detailed status of activities in the MAP","[{\"question\":\"What information does the bi-annual overview provide for each project?\",\"answer\":\"It lists the latest progress report number with date and the due date for the next progress report, organized by project and case reference.\"},{\"question\":\"How does the report describe water-loss management actions for the Vishnugad Pipalkoti project?\",\"answer\":\"It details regular monitoring of water sources and plans for replacement options—such as gravity-fed systems, reservoirs/cisterns, pumping, water trucks, or rechanneling—along with supervision of works and specialist involvement.\"},{\"question\":\"What is the current status of resettlement for the Hatsari families in the management action plan?\",\"answer\":\"The report states the resettlement action is completed as of the 10th progress report, but also notes ongoing disputes and legal proceedings involving remaining families, plus continued Bank support and compensation-related discussions.\"}]",1784490419,76,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":13,"keywords":33,"description":14,"schema_data":34,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":27},"bi-annual-overview-of-status-of-implementation-of-ongoing-management-action-plans-prepared-in-response-to-inspection-panel-investigation-reports-june-8-2025","",{"@graph":35,"@context":84},[36,53,67],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,50],{"item":40,"name":41,"@type":42,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/document/","Document",2,{"item":48,"name":12,"@type":42,"position":49},"https://docshare.wps.com/document/research-report/",3,{"item":51,"name":13,"@type":42,"position":52},"https://docshare.wps.com/document/bi-annual-overview-of-status-of-implementation-of-ongoing-management-action-plans-prepared-in-response-to-inspection-panel-investigation-reports-june-8-2025/111502/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":61,"encodingFormat":60,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":40,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-19",true,{"@type":64,"interactionType":65,"userInteractionCount":4},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"What information does the bi-annual overview provide for each project?","Question",{"text":74,"@type":75},"It lists the latest progress report number with date and the due date for the next progress report, organized by project and case reference.","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"How does the report describe water-loss management actions for the Vishnugad Pipalkoti project?",{"text":79,"@type":75},"It details regular monitoring of water sources and plans for replacement options—such as gravity-fed systems, reservoirs/cisterns, pumping, water trucks, or rechanneling—along with supervision of works and specialist involvement.",{"name":81,"@type":72,"acceptedAnswer":82},"What is the current status of resettlement for the Hatsari families in the management action plan?",{"text":83,"@type":75},"The report states the resettlement action is completed as of the 10th progress report, but also notes ongoing disputes and legal proceedings involving remaining families, plus continued Bank support and compensation-related discussions.","https://schema.org",{"og:url":51,"og:type":86,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":88,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,96,100,104,109,114,119,121,126,129,133],{"id":20,"doc_module":4,"doc_module_name":45,"category_name":93,"show_sort_weight":94,"slug":95},"Story & Novel",90,"story-novel",{"id":46,"doc_module":4,"doc_module_name":45,"category_name":97,"show_sort_weight":98,"slug":99},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":45,"category_name":101,"show_sort_weight":102,"slug":103},"Exam",70,"exam",{"id":105,"doc_module":4,"doc_module_name":45,"category_name":106,"show_sort_weight":107,"slug":108},5,"Comic",60,"comic",{"id":110,"doc_module":4,"doc_module_name":45,"category_name":111,"show_sort_weight":112,"slug":113},6,"Technology",50,"technology",{"id":115,"doc_module":4,"doc_module_name":45,"category_name":116,"show_sort_weight":117,"slug":118},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":45,"category_name":12,"show_sort_weight":21,"slug":120},"research-report",{"id":122,"doc_module":4,"doc_module_name":45,"category_name":123,"show_sort_weight":124,"slug":125},9,"Religion & Spirituality",20,"religion-spirituality",{"id":124,"doc_module":4,"doc_module_name":45,"category_name":127,"show_sort_weight":124,"slug":128},"World Cup","world-cup",{"id":130,"doc_module":4,"doc_module_name":45,"category_name":131,"show_sort_weight":130,"slug":132},10,"Lifestyle","lifestyle",{"id":134,"doc_module":4,"doc_module_name":45,"category_name":135,"show_sort_weight":105,"slug":136},19,"General","general"]