[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-111050-en":3,"doc-seo-111050-105":29,"detail-sidebar-cat-0-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":4,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":13,"seo_description":14,"update_tm":27,"read_time":28},111050,1099513958607,"Jiven","https://ap-avatar.wpscdn.com/avatar/100002390cf8733938c?x-image-process=image/resize,m_fixed,w_180,h_180&k=1778829742770036399",8,"Research & Report","Bi-Annual Overview of Status of Implementation of Ongoing Management Action Plans - Board Progress Summary","Bi-annual overview summarizing progress on management action plans prepared in response to Inspection Panel investigation reports. The report tracks multiple projects, listing latest progress and next progress report due dates, and documents specific issue findings comparing borrower actions versus World Bank actions. It describes approvals, timelines, completion status, and improvements such as updating the GRM manual, staff training, strengthened complaint procedures, digital complaint management, and enhanced culturally appropriate dispute resolution.","Public Disclosure Authorized Public Disclosure Authorized  \nDecember 31, 2025  \nBi-Annual Overview of Status of Implementation of Ongoing Management Action Plans Prepared in Response to Inspection Panel Investigation Reports  \n\n| \\# | PROJECT | LATEST PROGRESS REPORT 1 | NEXT PROGRESS REPORT DUE |\n| --- | --- | --- | --- |\n| 1 | Tanzania: Resilient Natural Resources Management for Tourism and Growth Project (IPN Case \\#165) | N/A | 1st Progress Report April 2026 |\n| 2 | Bolivia: Santa Cruz Road Corridor Connector Project (San Ignacio-San Jose)(IPN Case \\#162) | 1st progress report June 2025 | 2nd progress report\u003Cbr>June 2026 |\n| 3 | India – Rural Water Supply and Sanitation Project for Low Income States\u003Cbr>(IPN Case \\#128/129 | 2nd progress report,\u003Cbr>March 2025 | 3rd progress report\u003Cbr>March 2026 |\n\n1 Reporting intervals may vary according to the Board’s specific request at the time of Action Plan approval.  \n1  \nOfficial Use Only  \n1.  Tanzania – Resilient Natural Resources Management for Tourism and Growth  \nManagement’s Action Plan in response to the Inspection Panel Investigation Report (192945-TZ) on the Resilient Natural Resources Management for Tourism and Growth Project (P150523), was approved by the Board on April 1, 2025. The first Progress Report is due in April 2026.  \n2  \nOfficial Use Only  \n2. Bolivia: Santa Cruz Road Corridor Connector Project (San Ignacio-San Jose)  \nFirst Progress Report on the implementation of Management’s Action Plan in response to the Inspection Panel Investigation Report (\\#180810-BO) on the Bolivia: Santa Cruz Road Corridor Connector Project (San Ignacio – San Jose) (P152281), June 6, 2025.  \n\n| Issue / Finding | Borrower Actions |  | Bank Actions |  |\n| --- | --- | --- | --- | --- |\n|  | Description | Status | Description | Status |\n| 4. Notwithstanding the Project’s recent efforts to resolve grievances through increased presence in the communities, the Panel finds Management in noncompliance with OP\u003Cbr>4.10, Annex B, para. 2(h) for not ensuring the existence of a functioning method for responding to concerns raised, and for not accommodating the customary dispute resolution process used by the Indigenous People. | (1) ABC will update the GRM Manual and submit it to the Bank.\u003Cbr>Timeline: By May 30, 2024. | (1) Completed. ABC updated the GRM Manual and submitted its final version to the Bank in April 2024. | (1) The Bank will provide advice based on good international practice and review and clear the updated GRM Manual.\u003Cbr>Timeline: By June 15, 2024 | (1) Completed. After providing advice on several draft versions, the Bank cleared ABC’s updated GRM Manual in April 2024. |\n|  | (2) ABC will carry out training and capacity building on the GRM Manual for all relevant staff of ABC, Supervision Consultant, and Contractor.\u003Cbr>Timeline: By September 30, 2024. | (2) Completed. ABC conducted a series of training workshops on the updated GRM Manual for all ABC staff, the Contractor, and the supervision teams. The training cycle was completed in May 2024. | (2) The Bank will assess implementation and effectiveness of the Project GRM after the update and share the results with ABC.\u003Cbr>Timeline: By January 15, 2025. | (2) Completed. The Bank assessed the functioning of the GRM after it was reviewed and strengthened with a new GRM Manual that clarified procedures, timelines, roles and responsibilities and how to address complaints in a culturally appropriate manner. The Bank noted that ABC implemented a digital complaint management system, which is also being used for projects not funded by the Bank. Other notable improvements include: (a) general reduction in average time to answer complaints; (b) increased accessibility of the GRM and enhanced capacity for receiving complaints through additional complaint reception channels; (c) improved quality of information provided to GRM users related to the |\n\n3  \nOfficial Use Only  \n\n| Issue / Finding | Borrower Actions |  | Bank Actions |  |\n| --- | --- ","cbCaivdFSF4TX91F","https://ap.wps.com/l/cbCaivdFSF4TX91F","pdf",427384,1,24,"English","en",105,"# Project Progress Overview\n## Tanzania: Resilient Natural Resources Management for Tourism and Growth Project\n## Bolivia: Santa Cruz Road Corridor Connector Project\n## India: Rural Water Supply and Sanitation Project for Low Income States\n# Issue/Finding to Action Plan Mapping\n## Borrower Actions and Status\n## Bank Actions and Status","[{\"question\":\"What is the purpose of the bi-annual overview in this report?\",\"answer\":\"It provides a structured update on the status of implementing ongoing management action plans prepared in response to Inspection Panel investigation reports, including what has been done and what is due next.\"},{\"question\":\"How does the report track project progress for the listed countries?\",\"answer\":\"A table lists each project, the latest progress report status, and the next progress report due date, with reporting intervals subject to the Board’s requests.\"},{\"question\":\"In the issue/finding section, how are actions organized and assessed?\",\"answer\":\"Each issue/finding is mapped to borrower actions and bank actions, showing the description and the implementation status, including timelines and outcomes such as completing manual updates and strengthening grievance mechanisms.\"}]",1784488344,60,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":13,"keywords":33,"description":14,"schema_data":34,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":27},"bi-annual-overview-of-status-of-implementation-of-ongoing-management-action-plans-board-progress-summary","",{"@graph":35,"@context":84},[36,53,67],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,50],{"item":40,"name":41,"@type":42,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/document/","Document",2,{"item":48,"name":12,"@type":42,"position":49},"https://docshare.wps.com/document/research-report/",3,{"item":51,"name":13,"@type":42,"position":52},"https://docshare.wps.com/document/bi-annual-overview-of-status-of-implementation-of-ongoing-management-action-plans-board-progress-summary/111050/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":61,"encodingFormat":60,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":40,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-19",true,{"@type":64,"interactionType":65,"userInteractionCount":4},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"What is the purpose of the bi-annual overview in this report?","Question",{"text":74,"@type":75},"It provides a structured update on the status of implementing ongoing management action plans prepared in response to Inspection Panel investigation reports, including what has been done and what is due next.","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"How does the report track project progress for the listed countries?",{"text":79,"@type":75},"A table lists each project, the latest progress report status, and the next progress report due date, with reporting intervals subject to the Board’s requests.",{"name":81,"@type":72,"acceptedAnswer":82},"In the issue/finding section, how are actions organized and assessed?",{"text":83,"@type":75},"Each issue/finding is mapped to borrower actions and bank actions, showing the description and the implementation status, including timelines and outcomes such as completing manual updates and strengthening grievance mechanisms.","https://schema.org",{"og:url":51,"og:type":86,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":88,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,96,100,104,108,113,118,121,126,129,133],{"id":20,"doc_module":4,"doc_module_name":45,"category_name":93,"show_sort_weight":94,"slug":95},"Story & Novel",90,"story-novel",{"id":46,"doc_module":4,"doc_module_name":45,"category_name":97,"show_sort_weight":98,"slug":99},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":45,"category_name":101,"show_sort_weight":102,"slug":103},"Exam",70,"exam",{"id":105,"doc_module":4,"doc_module_name":45,"category_name":106,"show_sort_weight":28,"slug":107},5,"Comic","comic",{"id":109,"doc_module":4,"doc_module_name":45,"category_name":110,"show_sort_weight":111,"slug":112},6,"Technology",50,"technology",{"id":114,"doc_module":4,"doc_module_name":45,"category_name":115,"show_sort_weight":116,"slug":117},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":45,"category_name":12,"show_sort_weight":119,"slug":120},30,"research-report",{"id":122,"doc_module":4,"doc_module_name":45,"category_name":123,"show_sort_weight":124,"slug":125},9,"Religion & Spirituality",20,"religion-spirituality",{"id":124,"doc_module":4,"doc_module_name":45,"category_name":127,"show_sort_weight":124,"slug":128},"World Cup","world-cup",{"id":130,"doc_module":4,"doc_module_name":45,"category_name":131,"show_sort_weight":130,"slug":132},10,"Lifestyle","lifestyle",{"id":134,"doc_module":4,"doc_module_name":45,"category_name":135,"show_sort_weight":105,"slug":136},19,"General","general"]