[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-387083-105":59,"doc-detail-387083-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","bethlehem-area-school-district-capital-improvements-plan-updated-report-on-findings-and-recommendations-updated-november-4-2024","Bethlehem Area School District Capital Improvements Plan - Updated Report on Findings and Recommendations - Updated: November 4, 2024","","Bethlehem Area School District presents an updated Capital Improvements Plan, dated November 4, 2024, including findings and recommendations. A limited condition survey was performed on isolated areas, with capital improvement items reviewed by maintenance staff and Administration. The plan organizes recommendations by school or facility, by priorities across concrete, floor covering, paving, athletic facilities (and related categories such as elevators), and by overall work. Budget summaries compare recommended improvement costs versus full renovation at defined per-square-foot rates, incorporate asbestos-abatement estimates via referenced updates, and use threshold percentages to guide whether renovation or replacement should be considered. It also compiles completed project histories and summarizes a proposed 10-year plan through 2024, including a July 2021 asbestos re-inspection included for informational purposes.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/bethlehem-area-school-district-capital-improvements-plan-updated-report-on-findings-and-recommendations-updated-november-4-2024/387083/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/bethlehem-area-school-district-capital-improvements-plan-updated-report-on-findings-and-recommendations-updated-november-4-2024/387083.png","ImageObject",300,407,{"name":92,"@type":93},"Mary Man","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-24","2026-09-24",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What process was used to develop the November 4, 2024 update?","Question",{"text":112,"@type":113},"A limited condition survey was performed for isolated areas, and capital improvement items were reviewed by maintenance staff and Administration.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does the plan determine whether to pursue total renovation or replacement?",{"text":117,"@type":113},"It compares the cost of recommended work to the cost of total renovation using a calculated ratio; if the percentage exceeds 60%, total renovation or replacement is recommended as a viable approach.",{"name":119,"@type":110,"acceptedAnswer":120},"How is asbestos information handled in the budget and recommendations?",{"text":121,"@type":113},"Although asbestos identification was not part of the study, the District’s updated asbestos abatement report is referenced, and estimated asbestos abatement costs are included in the tabulation and budget columns.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},387083,1790766139,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":56,"preview_urls":146},7421720224475,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","BETHLEHEM AREA SCHOOL DISTRICT  \nCAPITAL IMPROVEMENTS PLAN  \nUpdated Report on Findings and Recommendations  \nUpdated: November 4, 2024  \nPrepared by:  \nCHA  \nTABLE OF CONTENTS  \nEXECUTIVE SUMMARY TAB 1  \nLOGIC MATRIX, PRIORITY INDEX, AND LIST OF CATEGORIES TAB 2  \nOF WORK  \nRECOMMENDATIONS ITEMIZED BY SCHOOL OR FACILITY TAB 3  \nRECOMMENDATIONS ITEMIZED BY PRIORITIES FOR THE TAB 4  \nSELECTED CATEGORIES OF CONCRETE WORK, FLOOR COVERING WORK, PAVING WORK, ATHLETIC FACILITIES  \nRECOMMENDATIONS ITEMIZED BY PRIORITY FOR ALL WORK TAB 5  \nOTHER THAN THE SELECTED CATEGORIES OF CONCRETE WORK FLOOR COVERING WORK, PAVING WORK, ATHLETIC FACILITIES  \nSUMMARY OF THE RECOMMENDED BUDGET FOR EACH SCHOOL TAB 6  \nOR FACILITY  \nSUMMARY OF CAPITAL IMPROVEMENT WORK COMPLETED IN TAB 7  \n1992, 1993, 1994, 1995, 1996, 1997, 1998, 1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019, 2020, 2021, 2022, 2023, 2024  \nSUMMARY OF RECENT BOND CONSTRUCTION (RENOVATION & TAB 8  \nADDITION) PROJECTS  \nRECOMMENDATIONS ITEMIZED BY PRIORITY FOR ALL WORK TAB 9  \nOTHER THAN THE BUILDINGS SLATED FOR MAJOR CONSTRUCTION PROJECTS IN THE 10 YEAR PLAN  \nSUMMARY OF A PROPOSED 10 YEAR PLAN TAB 10  \nSUMMARY OF AHERA ASBESTOS INSPECTION TAB 11  \nREPORT PREPARED BY SPOTTS, STEVENS & MCCOY JULY 2021 JULY 2019 SURVEILLANCE INSPECTION  \n2024  \nBETHLEHEM AREA SCHOOL DISTRICT BOARD OF SCHOOL DIRECTORS  \nMICHAEL E. FACCINETTO  \nPRESIDENT  \nSHANNON PATRICK  \nVICE PRESIDENT  \nFRANK PEARN, JR.  \nTREASURER  \nWINSTON ALOZIE  \nDR. KAREN BECK POOLEY DR. DEAN DONAHER  \nMICHAEL RECCHIUTI  \nDR. KIM SHIVELY EMILY SCHENKEL DR. SILAGH WHITE  \nADMINISTRATION  \nDR. JACK P. SILVA SUPERINTENDENT OF SCHOOLS  \nHARRY ARISTAKESIAN CHIEF FINANCIAL OFFICER  \nDR. JOHN BURRUS  \nCHIEF HUMAN RESOURCES OFFICER  \nCLAIR HOGAN  \nCHIEF PUPIL SERVICES OFFICER  \nDR. MAUREEN LEESON  \nASSISTANT SUPERINTENDENT FOR EDUCATION / CHIEF ACADEMIC OFFICER  \nMARIE BACHMAN CHIEF TECHNOLOGY OFFICER  \nMARK STEIN  \nCHIEF FACILTIES & OPERATIONS OFFICER  \nKING, SPRY, HERMAN, FREUND & FAUL, LLC  \nSOLICITOR  \nTAB 1  \nEXECUTIVE SUMMARY  \nEXECUTIVE SUMMARY  \nPresented herein is the November 4, 2024, update of the Bethlehem Area School District Capital Improvements Plan originally presented on August 21, 1991.  \nFor this update, a limited condition survey was performed of isolated areas. Also, the capital improvement items were reviewed by the maintenance staff and Administration.  \nTab 3 Recommendations Itemized by School or Facility.  \nTab 4 Recommendations Itemized by Priorities for the Selected Categories of Concrete  \nWork, Floor Covering Work, Paving Work, and Athletic Facilities.  \nTab 5 Recommendations Itemized by Priority for All Work Other Than the Selected  \nCategories of Concrete Work, Floor Covering Work, Paving Work, Athletic Facilities, Elevators.  \nTab 6 Summary of the Recommended Budget for Each School or Facility.  \nA table is presented which summarizes the costs for each school and establishes a total estimated budget.  \nIn order to compare the recommended costs with the costs of totally renovating each of the facilities, the cost of total renovations is calculated at a rate of $300 per square foot for each school or facility and is listed in Column 3. The costs of the recommended improvements are listed in Column 4 (taken from Tab 3) . The ratio of cost for recommended work to cost for total renovation is calculated and listed as a percentage in Column 5. Where this percentage exceeds 60%, the District should consider total renovation or replacement as a viable approach since State reimbursement may be available for total renovation or replacement and there will be savings and efficiencies gained by combining the project scope. Although asbestos identification and recommendations involving asbestos were not a part of this study, the asbestos abatement updated report provided by the District was referred to and the estimated costs for asbestos abate","cbCaiesW392Pd9rQ","https://ap.wps.com/l/cbCaiesW392Pd9rQ","pdf",3599130,182,"English","# Executive Summary\n## Logic Matrix, Priority Index, and List of Categories\n## Recommendations Itemized by School or Facility\n## Recommendations Itemized by Priorities for Selected Categories\n## Recommendations Itemized by Priority for All Other Work\n## Summary of the Recommended Budget for Each School or Facility\n## Capital Improvement Projects Completed (1992-2024)\n## Summary of Recent Bond Construction Projects\n## Recommendations Itemized by Priority for All Other Work\n## Summary of the Proposed 10 Year Plan (Through 2024)\n## Summary of AHERA Asbestos Inspection","[{\"question\":\"What process was used to develop the November 4, 2024 update?\",\"answer\":\"A limited condition survey was performed for isolated areas, and capital improvement items were reviewed by maintenance staff and Administration.\"},{\"question\":\"How does the plan determine whether to pursue total renovation or replacement?\",\"answer\":\"It compares the cost of recommended work to the cost of total renovation using a calculated ratio; if the percentage exceeds 60%, total renovation or replacement is recommended as a viable approach.\"},{\"question\":\"How is asbestos information handled in the budget and recommendations?\",\"answer\":\"Although asbestos identification was not part of the study, the District’s updated asbestos abatement report is referenced, and estimated asbestos abatement costs are included in the tabulation and budget columns.\"}]","Bethlehem Area School District Capital Improvements Plan - Updated Report on Findings and Recommendations - Updated: November 4, 2024 | PDF",1790281759,459,[147,151,155,159,163,167,171,175,179,183,187,192,197,202,206,211,216,221,225],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/f3fa2505f431b2f40d99a937aee2a0b2.webp",983,1272,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/2f648d1737b1614fc8d257d0c72094a8.webp",982,1270,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/bd61a1069e2e0db14d5e0ebfd554f1d8.webp",981,1269,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/c2a4ea085fe76cc755b486077ad430da.webp",980,1268,{"page_no":24,"url":164,"width":165,"height":166},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/90bec7743a7c55feb414c6ff9f64cae3.webp",979,1267,{"page_no":29,"url":168,"width":169,"height":170},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/772caa73c6d522dcdaaee878fd269dd0.webp",978,1265,{"page_no":34,"url":172,"width":173,"height":174},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/e06503092cc3b08e766c7eb7c7cc9332.webp",977,1264,{"page_no":39,"url":176,"width":177,"height":178},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/d55980ece71911101ea6b954284f0519.webp",976,753,{"page_no":44,"url":180,"width":181,"height":182},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/54fcb4f9dd4b364be8408aeaba2ed03a.webp",975,1261,{"page_no":52,"url":184,"width":185,"height":186},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/1d6053f1854759d59e43971cba8567c4.webp",974,1260,{"page_no":188,"url":189,"width":190,"height":191},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/cb9636d0ad5ad0adfc12b905b0f3ab52.webp",973,1259,{"page_no":193,"url":194,"width":195,"height":196},12,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/16e9431960eadfc86bdd9509ffcf7636.webp",972,1257,{"page_no":198,"url":199,"width":200,"height":201},13,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/ba55cb7500a532b273da1d6137602299.webp",971,749,{"page_no":203,"url":204,"width":205,"height":201},14,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/f9d0217bd3356e1c21c203e11c69c55c.webp",970,{"page_no":207,"url":208,"width":209,"height":210},15,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/8e09fbe8f4b68ee74050060f46899c20.webp",969,748,{"page_no":212,"url":213,"width":214,"height":215},16,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/d8a0c982de57761ab7de6dd2daa320b4.webp",968,747,{"page_no":217,"url":218,"width":219,"height":220},17,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/23e348ac4eb28f7435501c8b897c81ad.webp",967,746,{"page_no":222,"url":223,"width":224,"height":220},18,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/7e556196e6bf3a11ccc3426be2c6c2ba.webp",966,{"page_no":56,"url":226,"width":227,"height":228},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/82fa814788355b22d3d6b5c3edd5acb0.webp",965,745]