[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650041-105":59,"doc-detail-650041-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","beacon-lite-road-subsurface-utility-engineering-report-final","Beacon Lite Road - Subsurface Utility Engineering Report - Final","","Subsurface Utility Engineering (SUE) report for Beacon Lite Road in Monument, Colorado, summarizing utility designating and locating results produced under the Farnsworth Group contract with Michael Baker International. The document sets practical limits for depiction accuracy, states final utility plans reflect surveyed subsurface conditions, and establishes Quality Levels for located utilities using ASCE 38-02. It also specifies contractor notification and caution requirements, and provides engineer certification for professional responsibility and licensed oversight.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/beacon-lite-road-subsurface-utility-engineering-report-final/650041/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/beacon-lite-road-subsurface-utility-engineering-report-final/650041.png","ImageObject",300,407,{"name":92,"@type":93},"How to eat","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-26","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of the utility plans in this SUE report?","Question",{"text":112,"@type":113},"Final utility plans are for design purposes only and reflect subsurface utility conditions at the time of the survey.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What responsibility does the contractor have before excavation?",{"text":117,"@type":113},"The contractor must call the utility notification service before excavating and follow legal requirements, including calling One Call two working days prior to construction.",{"name":119,"@type":110,"acceptedAnswer":120},"How are utility locations classified in terms of quality level?",{"text":121,"@type":113},"Located utilities are assigned Quality Level A or B (except where noted) based on ASCE 38-02, and the report includes references for specific QL assignments.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650041,1792984947,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962093541613,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","Michael Baker International  \nSubsurface Utility Engineering Report for Beacon Lite Road-FINAL  \nMonument, CO  \nMarch 16, 2022  \nContents  \nENGINEER’S CERTIFICATION .......................................................................................................................................... 1  \nINTRODUCTION:............................................................................................................................................................... 3  \nDATA LIMITATIONS: ...................................................................................................................................................... 3  \nPROJECT-SPECIFIC SCOPE OF WORK:...............................................................................................................................4  \nUTILITY OWNERSHIP: ....................................................................................................................................................... 5  \nPHASE I UTILITY DESIGNATING: .................................................................................................................................... 6  \nUTILITY DESCRIPTIONS:.................................................................................................................................................. 10  \nSUMMARY:..................................................................................................................................................................... 10  \nGAS:................................................................................................................................................................................ 10  \nTELECOMMUNICATIONS/FIBER OPTIC: ......................................................................................................................... 10  \nPOWER: .......................................................................................................................................................................... 11  \nPOTABLE WATER AND SANITARY SEWER: ..................................................................................................................... 11  \nTRANSPORTATION: ........................................................................................................................................................ 11  \nPHASE II UTILITY TEST HOLES (POTHOLES): ................................................................................................................... 11  \nUTILITY DISCREPANCIES, ISSUES, AND NOTES: .............................................................................................................. 12  \nFILE INFORMATION: ....................................................................................................................................................... 12  \nDIGITAL FILE SUBMITTALS: ......................................................................................................................................... 12  \nAPPENDIX A:................................................................................................................................................................... 13  \nSUE Quality Levels from CDOT .................................................................................................................................. 13  \nAPPENDIX B:................................................................................................................................................................... 14  \nSUE Drawings ............................................................................................................................................................. 14  \nAPPENDIX C:................................................................................................................................................................... 15  \nExisting Utility Company Provided Drawings: .........................................","cbCaiiQfVOUoUxfh","https://ap.wps.com/l/cbCaiiQfVOUoUxfh","pdf",15584812,55,"English","# ENGINEER’S CERTIFICATION\n# INTRODUCTION:\n# DATA LIMITATIONS:\n# PROJECT-SPECIFIC SCOPE OF WORK:\n# UTILITY OWNERSHIP:\n# PHASE I UTILITY DESIGNATING:\n## UTILITY DESCRIPTIONS:\n## SUMMARY:\n## GAS:\n## TELECOMMUNICATIONS/FIBER OPTIC:\n## POWER:\n## POTABLE WATER AND SANITARY SEWER:\n## TRANSPORTATION:\n# PHASE II UTILITY TEST HOLES (POTHOLES):\n## UTILITY DISCREPANCIES, ISSUES, AND NOTES:\n# FILE INFORMATION:\n## DIGITAL FILE SUBMITTALS:\n# APPENDIX A:\n## SUE Quality Levels from CDOT\n# APPENDIX B:\n## SUE Drawings\n# APPENDIX C:\n## Existing Utility Company Provided Drawings:","[{\"question\":\"What is the purpose of the utility plans in this SUE report?\",\"answer\":\"Final utility plans are for design purposes only and reflect subsurface utility conditions at the time of the survey.\"},{\"question\":\"What responsibility does the contractor have before excavation?\",\"answer\":\"The contractor must call the utility notification service before excavating and follow legal requirements, including calling One Call two working days prior to construction.\"},{\"question\":\"How are utility locations classified in terms of quality level?\",\"answer\":\"Located utilities are assigned Quality Level A or B (except where noted) based on ASCE 38-02, and the report includes references for specific QL assignments.\"}]","Beacon Lite Road - Subsurface Utility Engineering Report - Final | PDF",1792815436,139]