[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664857-105":59,"doc-detail-664857-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","basement-level-demolition-plan-a-101-general-demolition-notes","Basement Level Demolition Plan - A-101 - General Demolition Notes","","Basement level demolition plan A-101 outlining general demolition notes, including what existing elements to remove, salvage, protect, and patch. Specifies treatment for floor finishes, stair enclosures, openings in walls, windows and frames, plumbing and electrical fixtures, and mechanical units. Coordinates debris removal and relocation with mechanical and electrical trades, and references related structural and room finish schedule requirements. Includes guidance for excavation equipment notifications and utility protection, construction access limits, and protection or turnover of specific fencing and pads to the owner.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/basement-level-demolition-plan-a-101-general-demolition-notes/664857/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/basement-level-demolition-plan-a-101-general-demolition-notes/664857.png","ImageObject",300,407,{"name":92,"@type":93},"adawds","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Which existing finishes are required to be removed or kept on the basement level?","Question",{"text":112,"@type":113},"Existing ceramic floor tile at the entry is to remain, while sheet flooring and carpet (including stairs) are to be removed. Some window and wall-related elements are removed down to top of the structural floor depending on the note.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What is the requirement for salvaging and reusing materials?",{"text":117,"@type":113},"Many removed items are to be salvaged for reinstallation, including interior trim, wood trim and paneling, chair rail, bookshelves modules, and masonry materials for reuse in the project.",{"name":119,"@type":110,"acceptedAnswer":120},"How should demolition debris and affected services be handled across trades?",{"text":121,"@type":113},"The plan requires coordinating debris removal and relocation with mechanical systems where relevant, and coordinating removal and relocation of surface piping with Mechanical. Electrical and mechanical fixtures and devices must be coordinated with the respective trades.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664857,1793276522,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},3985747872983,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Bntre cLevelDemolition  \nMACHRAYAVENUE  \nBasement Level Demolition Plan  \nScale:1:100  \nA-101  \nGENERALDEMOLITION NOTES  \nDEMOLITION PLAN KEYNOTESDEMOLITION PLAN KEYNOTES①Existing ceramic floor tile at entry to remain.②.Existing stair enclosure to be demolished.  \n⑥.New opening in existing wall.Score and remove painted plaster with hand tools.Dispose of⑥.New opening in existing wall.Score and remove painted plaster with hand tools.Dispose ofdebris with bulk of demolition waste.Coordinate removal and relocation of existing surfacedebris with bulk of demolition waste.Coordinate removal and relocation of existing surfacepiping with Mechanical.Refer to Structural for lintel requirements.  \n31.Existing aluminium storm windows,wrought iron cover,and existing wood windows to beremoved.  \n③2.Existing sheet flooring to be removed.Prepare surfaces to receive new finishes.Refer to Room  \n③.Existing partial height wall to be demolished.Patch and make good affected surfaces to match  \n7.Existing window,including wall,to be removed down to top of structural floor.Salvage all interiortrim for use elsewhere.  \nFinish Schedule and A-200.  \nexisting.Salvage wood trim and paneling for reuse.  \n33.Existing wood chair rail around perimeter of room to be removed and salvaged for reinstallation.  \n④.Existing electric fireplace to be removed and replaced with new electric new fireplace.  \n⑧.Existing plumbing fixtures to be demolished.Coordinate with Mechanical.  \nCoordinate with Electrical.  \n34.Existing wrought iron fence on south side of existing walkway to be removed and turned over toOwner.  \n19.Existing upper and lower cabinets,including sink,to be demolished.Coordinate withMechanical.  \n⑤.Existing opening to be prepared to receive new electric new fireplace.Coordinate with  \n35.Existing groundcover,including existing shrubs vegetation to be removed as per 1L-101.  \nElectrical.  \n20.Existing carpet and underlying vinyl tile to be removed.Refer to Demolition Notes for areas withasbestos containing materials.Prepare surfaces to receive new finishes.Refer to Room FinishSchedule.  \n⑥.Existing window,wrought iron screen and wood trim to be removed and salvaged.  \n36.Existing wrought iron fence on north side of existing walkway to be maintained and protectedduring construction.  \n⑦Existing window and mechanical unit to be removed.Prepare rough opening to receive newinterior glazing.Coordinate with Mechanical.  \n37.Existing A/C unit and window infill to be removed.Coordinate with Mechanical.  \n21.Existing carpet on stairs to be removed.21.Existing carpet on stairs to be removed.  \n⑧.Existing bookshelves shown dashed to be removed.Patch and make good surfaces to remain  \n38.Existing interior window to be removed and salvaged for reinstallation.  \n7.Salvage and store all removed brick and tyndall/limestone masonry for re-use in this project.  \n22.Refer to Structural for work to existing floor slab.  \nto match existing.Salvage all removed wood for reuse.  \n39.Existing air conditioning unit on wallabove bookshelves to be removed.Coordinate withMechanical and Electrical.  \n8.If power equipment is to be used for excavation on this project the contractor must:  \n23.Existing window to be removed and salvaged.Saw cut wall down to new floor height.  \n⑨.Existing bookshelf module in front of window to be removed.Salvage for reuse.Patch and  \na)notify all utilities of the proposed location of excavation.  \n24.Existing window opening to be saw cut to create new door opening.Coordinate with Structural.  \nb)take precaution to avoid damage to all utilities.  \nmake good exposed ends of existing shelves to remain.  \n④0.Existing phone booth and concrete pad to be removed.Coordinate with MTS.  \n①⑩.Existing concrete exit stair shown dashed to be demolished.  \n25.Existing casework around entire door to be removed and salvaged for reinstallation to suit newfloor height.Enlarge opening to suit new floor height.Refer to Structural for new lintel  \n41 Existing concrete pad and f","cbCainmTufRjbynb","https://ap.wps.com/l/cbCainmTufRjbynb","pdf",894472,"English","# General Demolition Notes\n## Keynotes\n## Main Level Demolition\n## Legend","[{\"question\":\"Which existing finishes are required to be removed or kept on the basement level?\",\"answer\":\"Existing ceramic floor tile at the entry is to remain, while sheet flooring and carpet (including stairs) are to be removed. Some window and wall-related elements are removed down to top of the structural floor depending on the note.\"},{\"question\":\"What is the requirement for salvaging and reusing materials?\",\"answer\":\"Many removed items are to be salvaged for reinstallation, including interior trim, wood trim and paneling, chair rail, bookshelves modules, and masonry materials for reuse in the project.\"},{\"question\":\"How should demolition debris and affected services be handled across trades?\",\"answer\":\"The plan requires coordinating debris removal and relocation with mechanical systems where relevant, and coordinating removal and relocation of surface piping with Mechanical. Electrical and mechanical fixtures and devices must be coordinated with the respective trades.\"}]","Basement Level Demolition Plan - A-101 - General Demolition Notes | PDF"]