[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648108-105":59,"doc-detail-648108-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","basement-apartment-site-plan-sample-drawings","Basement Apartment Site Plan Sample Drawings","","Sample drawings and checklists for a building permit application focused on a second unit basement accessory apartment. The content specifies required site-plan and floor-plan inclusions such as property lines, driveway and walkway/patio hard landscaping, entrances, setbacks, dimensions, and parking notes. It also outlines basement floor-plan requirements covering rooms, partition walls, door/window sizes, dimensions, structural elements with fire-resistance ratings, HVAC, plumbing rough-ins, electrical items, and general legend and drawing presentation details.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/basement-apartment-site-plan-sample-drawings/648108/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/basement-apartment-site-plan-sample-drawings/648108.png","ImageObject",300,407,{"name":92,"@type":93},"Dipper","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does the document require the site plan to show for a basement accessory apartment permit application?","Question",{"text":112,"@type":113},"It requires showing property lines, driveway and walkway/patio hard landscaping, entrances to the existing house and proposed unit, setbacks for house/accessory buildings/deck/pool/driveway/walkways, relevant dimensions, and site statistics including parking requirements as per zoning by-law.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which items must the basement accessory apartment floor plan include?",{"text":117,"@type":113},"It requires room labeling and partitions/fire separations, door and window sizes with glass area, dimensions and areas, finished ceiling heights under beams/ducts/bulkheads, and detailed structural, HVAC, and plumbing elements.",{"name":119,"@type":110,"acceptedAnswer":120},"Does the floor plan guidance include safety and mechanical system details?",{"text":121,"@type":113},"Yes. It calls for load-bearing walls, beams and columns with required fire-resistance ratings, HVAC components including furnace, water heater, HRV, exhaust fans, plumbing rough-ins, and electrical elements such as panels and alarms, plus related ductwork and floor drain where applicable.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648108,1792900662,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":44,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},1374404997633,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","| \u003Cbr>PROJECT TRUE\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>NOTE\u003Cbr>THE ITEMS ON THIS DRAWING, INCLUDING DIMENSIONS, ARE BEING PROVIDED TO SHOW THE DRAWING REQUIREMENTS FOR THE SITE PLAN ONLY. THEY DO NOT NECESSARILY REFLECT THE ACTUAL CITY OF MISSISSAUGA ZONING BYLAW REQUIREMENTS\u003Cbr>LEGEND\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>PROPERTY LINE\u003Cbr>ASPHALT DRIVEWAY\u003Cbr>REQUIRED PARKING SPACE\u003Cbr>24\" x 24\" CONCRETE\u003Cbr>PATIO STONE WALKWAY\u003Cbr>\u003Cbr>EXISTING HOUSE ENTRANCE DOOR\u003Cbr>ACCESSORY APARTMENT ENTRANCE DOOR\u003Cbr>SECONDARY/OTHER DOOR | SAMPLE DRAWINGS BUILDING PERMIT APPLICATION GUIDE:\u003Cbr>SECOND UNIT / BASEMENT APT. DRAWING NAME:\u003Cbr>SITE PLAN NUMBER OF COPIES REQUIRED:\u003Cbr>2 DRAWING MUST INCLUDE/SHOW (IF APPLICABLE): STRUCTURES:\u003Cbr>-HOUSE (INCLUDING PORCH & EXTERIOR STAIRS)\u003Cbr>-ACCESSORY BUILDINGS (SHED/GARAGE)\u003Cbr>-DECK\u003Cbr>-POOL\u003Cbr>HARD LANDSCAPED SURFACES:\u003Cbr>-DRIVEWAY\u003Cbr>-WALKWAYS/PATIOS\u003Cbr>ENTRANCES:\u003Cbr>-TO EXISTING HOUSE\u003Cbr>-TO PROPOSED ACCESSORY APARTMENT\u003Cbr>-SECONDARY/OTHER ENTRANCES\u003Cbr>SETBACKS:\u003Cbr>-HOUSE (INCLUDING PORCH & EXTERIOR STAIRS)\u003Cbr>-ACCESSORY BUILDINGS (SHED/GARAGE)\u003Cbr>-DECK\u003Cbr>-POOL\u003Cbr>-DRIVEWAY\u003Cbr>-WALKWAYS/PATIOS\u003Cbr>DIMENSIONS:\u003Cbr>-PROPERTY LINES\u003Cbr>-DRIVEWAY\u003Cbr>-INTERIOR OF GARAGE\u003Cbr>PARKING:\u003Cbr>-REVIEW ZONING BY-LAW FOR APPLICABLE PARKING REQUIREMENTS AND INDICATE ON DRAWING IN SITE STATISTICS\u003Cbr>GENERAL/OTHER NOTES:\u003Cbr>-LEGEND OF LINE TYPES, SYMBLOLS, AND HATCHING USED DESIGNER: JOE SMITH PROJECT 123 MAIN STREET\u003Cbr>ADDRESS: MISSISSAUGA, ONTARIO SHEET SIZE: 11\" X 17\" SHEET NO.\u003Cbr>A-1 DATE: JULY 2017 SCALE: AS INDICATED |\n| --- | --- |\n\n\n| 3\" 24' -11 1/2\" 3\"\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>WALL/CEILING SCHEDULE\u003Cbr>SEE SHEET NO. A-7\u003Cbr>LEGEND\u003Cbr> EXISTING CONSTRUCTION (BLACK)\u003Cbr> ~~ ~~  BEAM |  |  | 3\" 10' -8 1/2\" 3\" | SAMPLE DRAWINGS BUILDING PERMIT APPLICATION GUIDE:\u003Cbr>SECOND UNIT / BASEMENT APT. DRAWING NAME:\u003Cbr>EXISTING BASEMENT\u003Cbr>FLOOR PLAN NUMBER OF COPIES REQUIRED:\u003Cbr>2 DRAWING MUST INCLUDE/SHOW (IF APPLICABLE): ROOMS & SPACES:\u003Cbr>- NAME/LABEL\u003Cbr>- PARTITION WALLS\u003Cbr>- DOOR SIZES (W x H)\u003Cbr>-WINDOW SIZES (W x H) AND GLASS AREA\u003Cbr>- DIMENSIONS AND AREAS\u003Cbr>STRUCTURAL:\u003Cbr>- LOAD BEARING WALLS\u003Cbr>- BEAMS (WOOD OR STEEL)\u003Cbr>-COLUMNS\u003Cbr>-JOIST SIZE, SPACING, AND SPAN DIRECTION\u003Cbr>HVAC:\u003Cbr>- FURNACE, WATER HEATER, AND HRV\u003Cbr>-SUPPLY AND RETURN TRUNKS\u003Cbr>-SUPPLY AIR OUTLETS AND RETURN AIR INTAKES\u003Cbr>- EXHAUST FANS\u003Cbr>PLUMBING:\u003Cbr>- BATHROOM ROUGH-IN\u003Cbr>- PLUMBING STACKS\u003Cbr>- PLUMBING FIXTURES\u003Cbr>- EXTERIOR HOSE BIBS AND DRAIN/SHUTOFFS\u003Cbr>-WATER METER AND MAIN WATER SHUTOFF\u003Cbr>-SUMP PUMP\u003Cbr>ELECTRICAL:\u003Cbr>- ELECTRICAL PANEL\u003Cbr>-SMOKE ALARMS\u003Cbr>-CARBON MONOXIDE ALARMS\u003Cbr>GENERAL/OTHER NOTES:\u003Cbr>- EXTERIOR INSULATION\u003Cbr>-WALL/CEILING CONSTRUCTION\u003Cbr>- LEGEND OF SYMBOLS USED DESIGNER: JOE SMITH PROJECT 123 MAIN STREET\u003Cbr>ADDRESS: MISSISSAUGA, ONTARIO SHEET SIZE: 11\" X 17\" SHEET NO.\u003Cbr>A-2 DATE: JULY 2017 SCALE: AS INDICATED |\n| --- | --- | --- | --- | --- |\n| | DUCTWORK\u003Cbr>LOW CEILING/BULKHEAD\u003Cbr>INTERCONNECTED SMOKE ALARM | FD FLOOR DRAIN\u003Cbr> 4\"x10\" SUPPLY OUTLET\u003Cbr>\u003Cbr>(CEILING MOUNTED)\u003Cbr>RETURN AIR INTAKE |  |  |\n\n\n| \u003Cbr>4\" 2' -8\" 4\" 2' -5\" 14' -8 1/2\" 6 1/2\" 3' -11 1/2\" 6\"\u003Cbr>SUMP 26\"x78\"\u003Cbr>A. P.\u003Cbr>42\"x27\" SLIDER GLASS 4.8 SF\u003Cbr>GARAGE HOSE BIB\u003Cbr>30\"x78\"\u003Cbr>STORAGE\u003Cbr>LIVING/DINING\u003Cbr>204.9 SF GLASS AREA = 5. 1%\u003Cbr>3' -2 7/8\" 4 1/2\" 6' -10 3/8\"\u003Cbr>72\"x78\"\u003Cbr>SA\u003Cbr>CLG. HT. 7'-6⅞ \"\u003Cbr>BEDROOM\u003Cbr>125.1 SF\u003Cbr>GLASS AREA = 6.8%\u003Cbr>RANGE HOOD EXHAUSTED\u003Cbr>EGRESS\u003Cbr>DIRECTLY TO OUTSIDE WITH NON\u003Cbr>WINDOW\u003Cbr>COMBUSTIBLE, INSULATED 6\" DUCT\u003Cbr>HOSE BIB\u003Cbr>A. P.\u003Cbr>COLUMNS RATED\u003Cbr>FOR 30 MIN\u003Cbr>BULKHEAD (LOW CEILING) FOR BEAM & MECHANICAL\u003Cbr>C1 CLG. HT. 7'-6⅞ \"\u003Cbr>KITCHEN\u003Cbr>147.2 SF\u003Cbr>1' -1\"\u003Cbr>4 1/2\"\u003Cbr>3\" Ø PLUMBING STACK\u003Cbr>UP 12R\u003Cbr>SA\u003Cbr>CMA\u003Cbr>CLOSET 2' -10\" 4 1/2\" 5' -6\"\u003Cbr>60\"x78\"\u003Cbr>LOW WALL RETURN\u003Cbr>FD\u003Cbr>FURNACE\u003Cbr>HWHEATER\u003Cbr>CLG. HT. 6'-8¾\"\u003Cbr>BATHROOM\u003Cbr>52.6 SF\u003Cbr>60\"x78\"\u003Cbr>CLG. HT. 7'-6⅞ \"\u003Cbr>HALL\u003Cbr>105.7 SF\u003Cbr>5' -6 5/8\" 1' -4\"\u003Cbr>30\"x78\"\u003Cbr>WATER METER W/ MAIN SHUTOFF IN CABINET\u003Cbr>CLG. HT. 7'-6⅞ \"FURNACE ROOM\u003Cbr>54.6 SF\u003Cbr>SMOKE DUCT DETECTOR (SDD) WIRED","cbCaiqYgAq4O6Wgo","https://ap.wps.com/l/cbCaiqYgAq4O6Wgo","pdf",871933,"English","# Site Plan Requirements\n## Legend and Drawing Notes\n## Required Structures, Hard Landscaping, Entrances, Setbacks, Dimensions, Parking\n# Basement Floor Plan Requirements\n## Rooms and Spaces\n## Structural, HVAC, Plumbing, Electrical","[{\"question\":\"What does the document require the site plan to show for a basement accessory apartment permit application?\",\"answer\":\"It requires showing property lines, driveway and walkway/patio hard landscaping, entrances to the existing house and proposed unit, setbacks for house/accessory buildings/deck/pool/driveway/walkways, relevant dimensions, and site statistics including parking requirements as per zoning by-law.\"},{\"question\":\"Which items must the basement accessory apartment floor plan include?\",\"answer\":\"It requires room labeling and partitions/fire separations, door and window sizes with glass area, dimensions and areas, finished ceiling heights under beams/ducts/bulkheads, and detailed structural, HVAC, and plumbing elements.\"},{\"question\":\"Does the floor plan guidance include safety and mechanical system details?\",\"answer\":\"Yes. It calls for load-bearing walls, beams and columns with required fire-resistance ratings, HVAC components including furnace, water heater, HRV, exhaust fans, plumbing rough-ins, and electrical elements such as panels and alarms, plus related ductwork and floor drain where applicable.\"}]","Basement Apartment Site Plan Sample Drawings | PDF",1792792314,23]