[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-665011-105":3,"detail-sidebar-cat-0-en-105":79,"doc-detail-665011-en":129},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":72,"head_meta":74,"extra_data":76,"updated_unix":78},105,"en","bartlett-design-research-folios-cork-construction","Bartlett Design Research Folios - Cork Construction","","Bartlett Design Research Folios documents the project “Cork Construction” led by Oliver Wilton and Matthew Barnett Howland, spanning 2014–2019. It outlines statement of research content and process, introduction, aims and objectives, guiding questions, context, methodology, dissemination plans, project highlights, and bibliography. The folios include staged development from preliminary research and a small building to a construction kit and finally Cork House, with detailed budgets, funding sources, and principal investigators, plus structural, fire-safety, thermal-performance and robotics advisory support.",{"@graph":14,"@context":71},[15,34,54],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/bartlett-design-research-folios-cork-construction/665011/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":48,"encodingFormat":47,"isAccessibleForFree":49,"interactionStatistic":50},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/bartlett-design-research-folios-cork-construction/665011.png","ImageObject",300,407,{"name":42,"@type":43},"BigDaveOnline","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29",true,{"@type":51,"interactionType":52,"userInteractionCount":22},"InteractionCounter",{"@type":53},"ViewAction",{"@type":55,"mainEntity":56},"FAQPage",[57,63,67],{"name":58,"@type":59,"acceptedAnswer":60},"What is the Cork Construction project and who leads it?","Question",{"text":61,"@type":62},"The folios describe the “Cork Construction” project led by Oliver Wilton and Matthew Barnett Howland. It presents staged research and development activities across 2014 to 2019.","Answer",{"name":64,"@type":59,"acceptedAnswer":65},"What are the main stages of the work described in the document?",{"text":66,"@type":62},"The project runs in stages: Stage One (Cork Casket, 2014–2015) focused on preliminary research including a small building; Stage Two (Cork Construction Kit, 2015–2018) developed a building construction system; Stage Three (Cork House, 2017–2019) covers the completed building at Eton, Berkshire.",{"name":68,"@type":59,"acceptedAnswer":69},"Which technical and advisory areas are covered by consultants and partners?",{"text":70,"@type":62},"The folios list structural engineering support, fire-safety engineering, building thermal-performance modelling, lab testing for fire and rain exposure, robotics advice, and whole-life carbon assessment, along with material and technical advice on expanded cork and cork supply.","https://schema.org",{"og:url":32,"og:type":73,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":75,"canonical":32},"index,follow",{"doc_id":77,"site_id":7},665011,1793285048,{"code":4,"msg":80,"data":81},"success",[82,86,90,94,99,104,109,113,118,121,125],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":83,"show_sort_weight":84,"slug":85},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":87,"show_sort_weight":88,"slug":89},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},"Exam",70,"exam",{"id":95,"doc_module":4,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},5,"Comic",60,"comic",{"id":100,"doc_module":4,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},6,"Technology",50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},8,30,"research-report",{"id":114,"doc_module":4,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},9,"Religion & Spirituality",20,"religion-spirituality",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":119,"show_sort_weight":116,"slug":120},"World Cup","world-cup",{"id":122,"doc_module":4,"doc_module_name":25,"category_name":123,"show_sort_weight":122,"slug":124},10,"Lifestyle","lifestyle",{"id":126,"doc_module":4,"doc_module_name":25,"category_name":127,"show_sort_weight":95,"slug":128},19,"General","general",{"code":4,"msg":80,"data":130},{"doc_id":77,"user_id":131,"nickname":42,"user_avatar":132,"doc_module":4,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":92,"language":138,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":12,"update_tm":78,"read_time":142},962090896214,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Bartlett Design Research Folios  \nOliver Wilton Matthew Barnett Howland  \nCork Construction  \nBARTLETT DESIGN RESEARCH FOLIOS  \nOliver Wilton  \nMatthew Barnett Howland  \nCork Construction  \nCONTENTS  \n\n| Project Details | 6 |\n| --- | --- |\n| Statement about the\u003Cbr>Research Content and Process | 10 |\n| Introduction | 12 |\n| Aims and Objectives | 14 |\n| Questions | 14 |\n| Context | 16 |\n| Methodology | 20 |\n| Dissemination | 56 |\n| Project Highlights | 57 |\n| Bibliography | 62 |\n\nRelated Publications 63  \n1 (previous) Cork House main façade.  \n2 Cork House, detail.  \nOLIVER WILTON AND MATTHEW BARNETT HOWLAND CORK CONSTRUCTION  \nProject Details  \n\n| Author | Oliver Wilton |  |\n| --- | --- | --- |\n| Co-author | Matthew Barnett Howland |  |\n| Title | Cork Construction |  |\n| Output Type | Building and construction system |  |\n| Date | 2014 to 2019 |  |\n| Total Budget £600,000\u003Cbr>Stage One, Cork Casket, 2014 to 2015\u003Cbr>Output Type Preliminary research, including a small building |  |  |\n| Principal Investigators |  | Oliver Wilton and Matthew Barnett Howland |\n| Structural Advice |  | Andrew Lawrence, Global Timber Specialist, Arup (via £5,000 of internal funding) |\n| Materials and Technical Advice |  | Amorim UK gave free issue and advice on the expanded cork |\n| Research Funding Part-funded by a £5,000 Innovation Voucher from Innovate UK\u003Cbr>Stage Two, Cork Construction Kit, 2015 to 2018\u003Cbr>Output Type Building construction system |  |  |\n| Principal Investigators | Matthew Barnett Howland, MPH Architects, industry lead; Oliver Wilton, UCL PI |  |\n| Structural Testing and Characterisation | Pete Walker, University of Bath PI |  |\n| Cork Supply and Technical Advice | Amorim UK, industry partner |  |\n\nMarket Advice  \nNigel Gervis, Technical Director, Ty Mawr  \nPROJECT DETAILS  \n\n| Structural Engineering Consultants | Andrew Lawrence, Global Timber Specialist, Arup; Gavin\u003Cbr>Maloney, Senior Engineer, Advanced Digital Engineering, Arup |\n| --- | --- |\n| Fire-Safety Engineering Consultant | Graeme Flint, Senior Fire Engineer, Arup |\n| Building Thermal-Performance Modelling | Jake Hacker, Associate, Advanced Digital Engineering, Arup |\n| Lab-Testing Consultant (fire and wind-driven rain) | Building Research Establishment (BRE), Watford; Preliminary fire characterisation work at BRE Centre for Fire Safety Engineering, University of Edinburgh |\n| Robotics Advice | Peter Scully, UCL |\n| Research Assistants | Michael Arnett, Emma Kate Matthews |\n\nResearch Funding £189,820 Building Whole Life Performance competition,  \nInnovate UK 102474, EPSRC grants EP/N509048/1 and EP/ N50905X/1; Commercial partner in-kind contributions brought the total funding to £270,055  \nStage Three, Cork House, 2017 to 2019  \nOutput Type Building  \n\n| Function | House (ancillary dwelling in the grounds of a larger house) |\n| --- | --- |\n| Location | Eton, Berkshire |\n| Clients | Matthew Barnett Howland and Dido Milne |\n| Practical Completion | January 2019 |\n| Budget | Circa £300,000 |\n| Area | 60 m3 + 15 m3 covered terrace |\n\nArchitects Matthew Barnett Howland with Dido Milne and Oliver Wilton  \nOLIVER WILTON AND MATTHEW BARNETT HOWLAND CORK CONSTRUCTION  \n\n| Structural Engineering Consultants | Andrew Lawrence, Global Timber Specialist, Arup; Gavin\u003Cbr>Maloney, Senior Engineer, Advanced Digital Engineering, Arup |\n| --- | --- |\n| Fire-Safety Engineering Consultant | Graeme Flint, Senior Fire Engineer, Arup |\n| Whole-Life Carbon\u003Cbr>Assessment | Sturgis Carbon Profiling LLP |\n| Main Contractor | Matthew Barnett Howland |\n| Cork Supply | Amorim Isolamentos |\n| CNC Milling | Wup Doodle Ltd |\n| Assembly of Large Components | M&P Construction |\n| Structural Accoya and CLT Supply | NFP Europe/SBM Fastwood |\n| Bespoke Accoya Doors and Windows | Whyte and Wood |\n| Steel Screwpile Foundations | ABC Anchors |\n| Fire Detection\u003Cbr>(Design and Installation) | Impulse Engineering Ltd |\n| Fire Suppression\u003Cbr>(Design and Installation) | Residential Sprinkler Solutions |\n\nCopper Rain","cbCainpscCSOmKR9","https://ap.wps.com/l/cbCainpscCSOmKR9","pdf",15993289,"English","# Project Details\n## Statement about the Research Content and Process\n## Introduction\n## Aims and Objectives\n## Questions\n## Context\n## Methodology\n## Dissemination\n## Project Highlights\n## Bibliography\n# Related Publications","[{\"question\":\"What is the Cork Construction project and who leads it?\",\"answer\":\"The folios describe the “Cork Construction” project led by Oliver Wilton and Matthew Barnett Howland. It presents staged research and development activities across 2014 to 2019.\"},{\"question\":\"What are the main stages of the work described in the document?\",\"answer\":\"The project runs in stages: Stage One (Cork Casket, 2014–2015) focused on preliminary research including a small building; Stage Two (Cork Construction Kit, 2015–2018) developed a building construction system; Stage Three (Cork House, 2017–2019) covers the completed building at Eton, Berkshire.\"},{\"question\":\"Which technical and advisory areas are covered by consultants and partners?\",\"answer\":\"The folios list structural engineering support, fire-safety engineering, building thermal-performance modelling, lab testing for fire and rain exposure, robotics advice, and whole-life carbon assessment, along with material and technical advice on expanded cork and cork supply.\"}]","Bartlett Design Research Folios - Cork Construction | PDF",176]